> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/calculation-guides/water-use-calculation-guide.md).

# Water Use calculation guide

Guidance on calculation methods for the [*Water Use*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/categories-and-credits/positive/25-or-water-use.md) credit in Green Star Buildings v1.

{% hint style="warning" %}
**Release 1 - 31/08/2026**

* Initial release for Green Star Buildings. This guidance has been adapted from the *Potable Water Calculator Guide* for *Green Star – Design & As Built*.

[#version-control](#version-control "mention")
{% endhint %}

<table data-search="false"><thead><tr><th width="735.25">Section</th></tr></thead><tbody><tr><td><a href="#introduction"><strong>Introduction</strong></a></td></tr><tr><td><a href="#about-this-guide">About this guide</a></td></tr><tr><td><a href="#feedback">Feedback</a></td></tr><tr><td><a href="#definitions"><strong>Definitions</strong></a></td></tr><tr><td><a href="#using-the-water-use-calculator"><strong>Using the Water Use calculator</strong></a></td></tr><tr><td><a href="#reducing-water-use">Reducing Water Use</a></td></tr><tr><td><a href="#sanitary-fixture-and-appliance-efficiency">Sanitary Fixture and Appliance Efficiency</a></td></tr><tr><td><a href="#recycled-water-infrastructure">Recycled Water Infrastructure</a></td></tr><tr><td><a href="#calculating-reductions-in-water-use"><strong>Calculating reductions in water use</strong></a></td></tr><tr><td><a href="#scope">Scope</a></td></tr><tr><td><a href="#demonstrating-reductions-in-the-proposed-building">Demonstrating reductions in the <em>Proposed building</em></a></td></tr><tr><td><a href="#reference-building-assumptions"><em>Reference building</em> assumptions</a></td></tr><tr><td><a href="#reclaimed-water">Reclaimed water</a></td></tr><tr><td><a href="#references"><strong>References</strong></a></td></tr><tr><td><a href="#appendix"><strong>Appendix</strong></a></td></tr><tr><td><a href="#appendix-a-calculator-data-entry-requirements">Appendix A: Calculator data entry requirements</a></td></tr><tr><td><a href="#appendix-b-calculation-methodologies">Appendix B: Calculation methodologies</a></td></tr><tr><td><a href="#appendix-c-point-potential-evapotranspiration-example">Appendix C: Point potential evapotranspiration example</a></td></tr><tr><td><a href="#appendix-d-bom-10-year-average-rainfall-data">Appendix D: BoM 10year average rainfall data</a></td></tr><tr><td><a href="#appendix-e-standard-occupancy-profiles">Appendix E: Standard occupancy profiles</a></td></tr><tr><td><a href="#appendix-f-crop-coefficient-kc">Appendix F: Crop coefficient (K<sub>c</sub>)</a></td></tr></tbody></table>

## <mark style="color:$primary;">Introduction</mark>

### About this guide

This document sets out the basis on which a project's water use modelling is to be completed for all Green Star Buildings v1 and v1.1 projects targeting the *Water Use* credit. This guide:

* Outlines the process for targeting various criteria within the *Water Use* credit using the *Water Use calculator*.
* Outlines the scope of inclusions and exclusions in calculating a project's water use.
* Provides guidance on demonstrating reductions in potable water use and what is considered standard practice for the *Reference building*.
* Provides information on the data inputs and calculation methodology for the *Water Use calculator*.

This guide applies to version 1 and version 1.1 of Green Star Buildings. This guide is not applicable to projects targeting *Green Star – Design & As Built*. These projects should refer to the *Potable Water calculation guide.*

### How to use this document

#### Water Use credit

The methodology in this guide is applied when targeting the *Water Use* credit in Green Star Buildings. This guide applies to the following criteria within the *Water Use* credit:

* Sanitary Fixture and Appliance Efficiency in *Minimum Expectation.*
* Reducing Water Use in Minimum Expectation, Credit Achievement, and Exceptional Performance.
* Recycled Water Infrastructure in *Credit Achievement.*

A summary of how each criterion is to be targeted using the Water Use calculator is provided in the *Using the Water Use calculator* section of this document.

#### Water Use calculator methodology

The *Water Use calculator* is to be used when targeting all criteria under the *Water Use* credit. This includes estimating a building's potable water use in comparison to a *Reference building*. The results from the calculator are used to demonstrate compliance with the Reducing Water Use criteria by determining the performance level targeted and points based on the building's reduction in water use.

Detailed explanations of the calculator inputs and calculation methodology are included in *Appendix A: Calculator data entry requirements* and *Appendix B: Calculation methodologies*.

#### Interdependence with other Green Star credits

**Energy Use**

The usage profile and properties of the water-based systems in the building must be consistent in both the *Water Use* and *Energy Use* credit. This includes for both the *Reference* and *Proposed building* for each credit. Water-based systems may include domestic hot water, heat rejection, evaporative cooling and/or chilled water systems.

Domestic hot water usage for the *Reference* and *Proposed buildings* in the *Energy Use calculator* must be based on the calculations completed in the *Water Use calculator*.

Heat rejection water consumption for the *Proposed building* is calculated by the *Water Use calculator* based on monthly total heat rejection values. Please refer to the *Heat rejection* section of this document for guidance.

Where direct or indirect evaporative cooling systems are used in the *Proposed building* in the *Energy Use calculator*, the associated water consumption must be calculated as part of the energy performance simulation and the total entered into the *Water Use calculator*.

**Operations Resilience**

Critical infrastructure including water infrastructure, water security, and access to drinkable water must be considered for the purpose of the Operations Resilience Assessment and Power Loss for Shelter in Place when targeting the Operations Resilience credit.

#### Applicability to Green Star projects

Projects registered under Green Star Buildings v1 may use one of the following:

* The Potable Water calculator for *Green Star – Design & As Built v1.3* and the Potable Water calculation guide, or
* The Water Use calculator for Green Star Buildings and this guide.

Projects cannot use the *Potable Water calculator* and this guide and vice versa.

Green Star Buildings v1 projects will be able to target the benchmarks from Green Star Buildings v1.1 if using the *Water Use calculator* however stepped points is not available. Please refer to *Guidance on credit substitution - Using Green Star Buildings v1.1 in Green Star Buildings v1* for further guidance.

Projects registered under Green Star Buildings v1.1 must use the *Water Use calculator* and this guide.

Projects that use the *Water Use* calculator must use the version of the guide current at the time of registration or may choose to use a newer version at their discretion if available. Projects must use the selected version in its entirety.

The Reference building requirements should not change substantially between versions of this guide, however if you believe your project has been substantially affected by changes, please submit a Technical Question.

### Feedback

GBCA welcomes any feedback on the guidance provided. Feedback can be lodged as a feedback request in the Green Star Manager.

## <mark style="color:$primary;">Definitions</mark>

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#blackwater)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#greywater)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#proposed-building)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#rainwater)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#reclaimed-water)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#recycled-water)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#reference-building)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#stormwater)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#water-efficiency-labelling-and-standards-wels-scheme)

## <mark style="color:$primary;">Using the Water Use calculator</mark>

The *Water Use calculator* is to be used when targeting all criteria under the *Water Use* credit. The methodology for targeting each criterion is summarised below.

### Criteria included

#### Reducing Water Use

The *Water Use calculator* is required to target the Reducing Water Use criteria in *Minimum Expectation, Credit Achievement,* and *Exceptional Performance.* These criteria are performance-based and are targeted by:

* Nominating 'Reducing Water Use' in the 'Criterion selection' section within the 'Building information' tab.
* Completing all inputs in the 'Building information' tab.
* Completing all relevant inputs in tabs 1. through 10.
* Completing the 'Summary' section within the 'Results' tab.

Inputs are to be entered in line with the guidance in the *Calculating reductions in water use* section of this document. All claims made in the *Water Use calculator* and Submission Templates must be supported by evidence in the submission.

#### Sanitary Fixture and Appliance Efficiency

If the project is targeting the *Sanitary Fixture and Appliance Efficiency* criterion to in *Minimum Expectation,* the 'Sanitary Fixture & Appliance' tab must be completed. This criterion is prescriptive and is targeted by:

* Nominating 'Sanitary Fixture and Appliance Efficiency' in the 'Criterion selection' section within the 'Building information' tab.
* Completing all inputs in the 'Sanitary Fixture & Appliance' tab.

Projects must enter 'Yes', 'No', or 'None installed' against each requirement in the 'Sanitary Fixture & Appliance' tab. All claims made in the *Water Use calculator* and Submission Templates must be supported by evidence in the submission. It is noted that projects targeting *Credit Achievement* and *Exceptional Performance* must also complete the remaining tabs to target the Reducing Water Use criteria.

#### Recycled Water Infrastructure

Projects targeting *Credit Achievement* must target the *Recycled Water Infrastructure* criterion. This criterion is prescriptive and is targeted by completing all inputs in the 'Recycled Water Infrastructure' *tab*.

Projects must enter 'Yes' or 'No' against each requirement in the 'Recycled Water Infrastructure' tab. All claims made in the *Water Use calculator* and Submission Templates must be supported by evidence in the submission.

### Mixed use projects

#### Targeting criteria in *Minimum Expectation*

All building class types must demonstrate compliance with the *Water Use* credit requirements. Different criteria may be used in different class types (i.e. Class 2 spaces may demonstrate compliance with *Reducing Water Use* while a Class 6 retail space in the same building may demonstrate compliance with *Sanitary Fixture and Appliance Efficiency*).

#### Targeting criteria in *Credit Achievement* and *Exceptional Performance*

Where more than 20% of the GFA, excluding car parks, is not the predominant building class, multiple pathways may be required to demonstrate compliance (i.e. a building with both Class 2 and 6 spaces would be required to comply with different benchmarks) provided at least 80% of the GFA and the largest building classes by area are included. Points can only be awarded to the level where both pathways meet the requirements for (i.e. a building where the Class 2 spaces demonstrate a 30% and the class 6 spaces demonstrate a 15% reduction will be deemed to comply with *Minimum Expectation*).

Where less than 20% of GFA, excluding car parks, is different building class to the majority of the building, it may be excluded.

#### Targeting the Reducing Water Use criteria across multiple class types

A single *Water Use calculator* may be provided where:

* All parts of the building fall under the 'Residential' building type. Where this is the case, the 'Residential' building type within the 'Building information' tab is to be selected, and water use is to be aggregated across the site.
* All parts of the building fall under the 'Non-residential' building type. Where this is the case, the 'Non-residential' building type within the 'Building information' tab is to be selected, and water use is to be aggregated across the site.

Refer to the *Building type and location* section in *Appendix A: Calculator data entry requirements* for definitions on the 'Residential' and 'Non-Residential' building types.

Where the project does not meet the above requirements, a Technical Question must be submitted to the GBCA for review.

## <mark style="color:$primary;">Calculating reductions in water use</mark>

The guidance in this section applies to the *Reducing Water Use* criteria in the *Water Use* credit whereby projects are to demonstrate a reduction in water consumption on a *Reference building*.

### Scope

The scope of water use is aligned in both the *Reference* and *Proposed building.* The following uses must be included in the assessment of the building's water use, as a minimum:

* All sanitation fixtures and fittings including toilets, urinals, indoor taps, showers, and other fixtures and fittings.
* All domestic and commercial washing machines and dishwashers.
* All heat rejection systems including but not limited to conventional cooling towers, evaporative condensers and fluid coolers, and hybrid or adiabatic systems. If air-cooled and no water is used, this should be indicated by the project team in the calculator.
* Water used for washdown purposes.
* All landscaping zones, regardless of whether they are irrigated or not, and irrigation systems. Xeriscape gardens are included. Landscaping zones that are not irrigated are to be assumed to be hand watered.
* All swimming pools and related systems.
* All water from systems used during fire protection testing, including but not limited to sprinklers, hose reels and hydrant systems.
* All water used in process cooling.
* Any use of reclaimed water from greywater, blackwater, rainwater, stormwater or an off-site non-potable water supply.

The following can be excluded from the scope:

* Fixtures where the water consumption will not be altered significantly by reducing the water flow due to functional purposes including:
  * Bath taps, laboratory taps, and taps dedicated to cleaning and facility management for container filling e.g., cleaning buckets.
  * Kitchen or café tapware, where the primary use is for pot fill and container filling.
  * Kitchen or café chilled, boiling and sparkling tapware which are used to fill cups.
  * Taps provided for connection to a laundry machine.

Laundry taps for general use in residential buildings must be included in the credit scope, as occupants in residential buildings are not limited to using the laundry taps for cleaning.

### Demonstrating reductions in the *Proposed building*

The *Proposed building* potable water use is calculated by providing inputs for the fixtures, fittings and systems as identified in the *Scope* section above. In most cases, these inputs are related to the properties of the installed fixtures, fittings or systems and use.

For further details on what is required for each input in the *Water Use calculator*, refer to *Appendix A: Calculator data entry requirements*.

Therefore, project teams can demonstrate reductions in potable water use in the *Proposed building* in two ways:

* Demonstrating the installation of fixtures, fittings and systems that are more water efficient than the *Reference building*.
* Using reclaimed water.

### *Reference building* assumptions

The fixtures, fittings and systems included in the *Reference building* aligns with the *Proposed building* however standard practice water efficiency is assumed. The assumptions made for what is considered standard practice for each water use in the *Reference building* are outlined below.

#### Sanitation

The water efficiency of fixtures and fittings used to determine the total standard practice water consumption is presented in *Table 1*. These values have been taken from a combination of the minimum allowable WELS ratings under *AS 6400:2016 Water efficient products—Rating and labelling*, and the GBCA's recommendations for the baseline performance of these appliances within the rating tool.

*Table 1: Standard practice water efficiency - Sanitation*

| Fixtures and fittings                | Standard practice water efficiency rating | Standard practice flow rate |
| ------------------------------------ | ----------------------------------------- | --------------------------- |
| Toilet                               | 3 Star                                    | 4 L/flush                   |
| Urinals                              | 3 Star                                    | 2 L/flush                   |
| Taps                                 | 4 Star                                    | 7.5 L/min                   |
| Showers (Class 3: hotels)            | 2 Star                                    | 12 L/min                    |
| Showers (All other building classes) | 3 Star                                    | 9 L/min                     |

The *Reference building* shower demand by occupants should align with the *Proposed building.* The following are to be assumed:

* For residential projects, this should be 100% for both the *Reference* and *Proposed building*.
* For non-residential projects, this should align with assumptions in the *Movement and Place* credit. This includes the number of showers required in the *Changing Facilities* criterion in *Minimum Expectation* and/or the mode share corresponding to cyclists in the project's Sustainable Transport Plan in the *Sustainable Transport* criterion in the *Credit Achievement.* The same value for both the *Reference* and *Proposed building* into the *Water Use calculator* should be used.

Where there are water consumption loads not able to be captured in the designated tables (such as for public buildings where there are water consumption loads associated with public water use), the 'Other fixtures water use' table can be completed. The *Reference building* water use per year for these fixtures is to be modelled separately and included in the calculator. A summary of the modelling, assumptions and results are included in the project's submission.

#### Whitegoods

The water efficiency of whitegoods used to determine the total standard practice water consumption is presented in *Table 2*. These values have been taken from a combination of the minimum allowable WELS ratings under *AS 6400:2016 Water efficient products—Rating and labelling*, and the GBCA's recommendations for the baseline performance of these appliances within the rating tool.

*Table 2: Standard practice water efficiency - Whitegoods*

| Fixtures and fittings            | Standard practice water efficiency rating | Standard practice flow rate |
| -------------------------------- | ----------------------------------------- | --------------------------- |
| Washing machine (capacity >=5kg) | 3 Star                                    | 14.7 L/kg                   |
| Washing machine (capacity <5kg)  | 2.5 Star                                  | 17.6 L/kg                   |
| Dishwasher                       | 3.5 Star                                  | Variable                    |

The baseline for both the clothes washing machine and dishwasher will scale based on the capacity of the machine entered by the project team. In the case of the clothes washing machine, this is related to the weight of clothing that can be accommodated per cycle. For dishwashers, the baseline is linked to the number of place settings that the machine can accommodate in one cycle.

#### Heat rejection

The standard practice water efficiency is as per *Table 3*, *Table 4* and *Table 5* below.

The inputs in *Table 3* are based on the *Reference building* HVAC system types as specified in *Table 40: Reference building HVAC system types by space usage type* in *Appendix D. Supplementary building and systems - definitions and calculation methods* within the *Energy Use calculation guide v1.1*. The selected *Reference building* and system type must be consistent with inputs to the *Energy Use calculator*.

For projects targeting Green Star Buildings v1, where the *Energy Use calculation guide v1* specifies a Reference HVAC system that is a different type to *Table 3,* projects should select 'Other (custom value)' for the Reference building type and choose the applicable HVAC system type instead.

*Table 3: Assumed Reference building HVAC systems by space usage type. These are based on Table 40 within the Energy Use calculation guide v1.1.*

| Reference building type                             | Climate zone      | System type as per *Energy Use calculation guide* Table 40 | Assumed HVAC system        |
| --------------------------------------------------- | ----------------- | ---------------------------------------------------------- | -------------------------- |
| Residential                                         | All climate zones | System types 1, 2a, or 2b                                  | Air-cooled (no water)      |
| Industrial - warehouses                             | All climate zones | System type 3                                              | Air-cooled (no water)      |
| Other non-office and non-retail buildings           | All climate zones | System types 4a, 10a, 10b, or 10c                          | Air-cooled (no water)      |
| Office up to 20,000m² NLA                           | All climate zones | System types 4a, 7a, or 7b                                 | Air-cooled (no water)      |
| Office greater than 20,000m² NLA                    | All climate zones | System types 7d or 7e                                      | Water-cooled (evaporative) |
| Retail - street facing                              | All climate zones | System type 1                                              | Air-cooled (no water)      |
| Retail with enclosed area up to 20,000m² GLA        | All climate zones | System types 8a, 8b, or 8c                                 | Air-cooled (no water)      |
| Retail with enclosed area greater than 20,000m² GLA | Climate zones 1-7 | System types 8d or 8e                                      | Water-cooled (evaporative) |
| Retail with enclosed area greater than 20,000m² GLA | Climate zone 8    | System type 8f                                             | Air-cooled (no water)      |
| Residential aged care                               | All climate zones | System type 4b                                             | Air-cooled (no water)      |
| Hotels (<100 guest rooms)                           | All climate zones | System type 4c                                             | Air-cooled (no water)      |
| Hotels (≥100 guest rooms)                           | Climate zones 1-7 | System types 9a and 9b                                     | Water-cooled (evaporative) |
| Hotels (≥100 guest rooms)                           | Climate zone 8    | System type 9c                                             | Air-cooled (no water)      |

*Table 4: Deemed duty fraction for Reference building assumed HVAC systems*

| Assumed HVAC system        | Evaporative duty fraction (f\_duty) (%) |
| -------------------------- | --------------------------------------- |
| Water-cooled (evaporative) | 1.0                                     |
| Air-cooled (no water)      | 0                                       |

*Table 5: Standard practice water efficiency variables for drift and bleed*

| Variable                                       | Standard practice value                                                                           |
| ---------------------------------------------- | ------------------------------------------------------------------------------------------------- |
| Condenser water Δt (°C)                        | 5.5°C                                                                                             |
| Drift coefficient (%)                          | 0.002% as required in *AS/NZS 3666.1 Clause 4.4*                                                  |
| Cycles of concentration in cooling tower water | 6 cycles of concentration in alignment with previous Green Star versions' compliance requirements |

#### Washdown

A set flow rate of 12L/min is assumed for the *Reference building*. All other parameters are assumed to align with the *Proposed building*.

#### Landscape irrigation

The standard practice water efficiency is based on the following:

*Table 6: Standard practice water efficiency – Landscape irrigation*

| Monthly 'point potential' evapotranspiration  | Standard practice value     |
| --------------------------------------------- | --------------------------- |
| Monthly Rainfall                              | As per *Proposed building*  |
| Total landscaped area of the zone             | As per *Proposed building*  |
| Percentage of zone undercover                 | As per *Proposed building*  |
| Weighted average crop coefficient in the zone | 0.6                         |
| Application Efficiency of irrigation system   | 75% (night time sprinklers) |

#### Swimming pools

The standard practice water efficiency for swimming pools has been taken from the ACT Planning and Land Authority (ACTPLA) design and siting requirements for water efficiency to establish a calculation methodology for the *Reference building* swimming pool water consumption. This methodology applies to outdoor pools and the ACTPLA requirements included in the *Reference building* are:

* The use of a swimming pool cover (for outdoor pools); and
* An annual backwash (filter cleaning) consumption based on 5 flushes per year at 250 litres per flush.

For indoor pools, the methodology regarding backwash has been retained, however as evaporation is driven by indoor climatic conditions, the methodology applied to calculate evaporation has been adapted from the cooling tower evaporation methodology to determine the water lost through the discharge of pool hall exhaust. In order to determine a benchmark water loss through evaporation of indoor swimming pools, the minimum exhaust requirements of *AS 1668.2* are used to define a benchmark for discharge of moist air (which carries evaporated swimming pool water) from the pool hall.

The constants used to determine the standard practice water efficiency are summarised in *Table 7*.

*Table 7: Standard practice water efficiency – Swimming pools*

| Constant                                                                    | Standard practice value |
| --------------------------------------------------------------------------- | ----------------------- |
| Water consumption for filter cleaning (backwash) (L/clean) (Demand\_filter) | 250                     |
| Filter cleaning frequency (cleans/year) (*Frequency*)                       | 5                       |
| Evaporation coefficient (K\_C,pool)                                         | 0.7                     |
| Relative humidity (%)¹                                                      | 100                     |
| Water vapour molar mass (kg/kmol)                                           | 18.02                   |
| Dry air molar mass (kg/kmol)                                                | 28.97                   |
| Ideal gas constant for air (kJ/kg.K)                                        | 0.287                   |

Note 1: For the purposes of calculating the evaporation losses from the indoor swimming pool, the assumption is made that the swimming pool hall is as close to 100% relative humidity as practically possible for both the *Reference* and *Proposed building*. This assumption allows the calculation to be based solely on the dry-bulb temperature of the pool hall air that is exhausted and combine this with the empirical moist air data (tabulated in the 1997 ASHRAE handbook, chapter 6, 'Psychrometrics') to determine the exhaust air moisture content.

Projects that target the aquatic centre classification will be required to model and provide the monthly water consumption of the *Reference* and *Proposed building*. To use this classification, a Technical Question must be submitted to the GBCA to review the modelling assumptions and methodology used. A project cannot be classified to have both swimming pools and be an aquatic centre for the purposes of the calculator.

#### Fire protection systems

The proportion of water captured per test is assumed to be 80% for the *Reference building*. All other parameters are assumed to align with the *Proposed building*.

#### Process cooling

The *Reference building* assumes that all equipment requiring process cooling is served by an open loop system, supplied with 95% non-potable water.

### Reclaimed water

The *Reference building* does not include any water re-use systems therefore any use of reclaimed water in the *Proposed building* will be an improvement over standard practice.

The following reclaimed water sources may contribute to reducing the *Proposed building's* potable water use:

* Greywater
* Blackwater
* Rainwater
* Stormwater
* Off-site reclaimed water
* Shared rainwater, greywater or blackwater systems

To include the use of reclaimed water, refer to the *Reclaimed water* section in *Appendix A: Calculator data entry requirements*.

#### Sitewide water systems

Where reclaimed water systems are sitewide or shared, project teams are to declare any other uses of the project's on-site reclaimed water sources. This may include where there is a specific uses not already included in the calculator that use the building's reclaimed water systems or where this is a centralised reclaimed water source that the project shares with multiple buildings.

Projects that have multiple buildings sharing a centralised reclaimed water source can only claim the use of this water source if the project is approved for a Multiple Building Single Rating (MBSR) Approach, Site-Wide Credits Approach or has an approved Technical Question from the GBCA. Please refer to the *Multiple Building Single Rating (MBSR) Support Document for Green Star Buildings* and *Site-Wide Credits Approach Support Document for Green Star Buildings* available via the Green Star resources portal for guidance on the above approaches.

Refer to the *Sitewide water systems* section in *Appendix A: Calculator data entry requirements* for further details on how this should be reflected in the *Water Use calculator*.

## <mark style="color:$primary;">References</mark>

Allen, R G. Pereira, L S, Raes D, Smith, M (1998) Crop evapotranspiration - Guidelines for computing crop water requirements - FAO Irrigation and drainage paper 56, Food and Agriculture Organization of the United Nations

Parsons, R A (ed.), (1997) 1997 ASHRAE fundamentals handbook

AS 3666.1:2011 Air-handling and water systems of buildings—Microbial control

AS 4180.1:2008 Measurement of drift loss from cooling towers

AS 6400:2016 Water efficient products—Rating and labelling

ACT planning and land authority (ACTPLA) design and siting requirements for water efficiency

Standards Australia,(2008) HB 230—2008 Rainwater Tank Design and Installation Handbook

British Standards Institution, (2009) BS 8515:2009 Rainwater harvesting systems – Code of practice

Aherne, V J (2009) AIRAH Best Practice Guidelines: Water conservation in cooling towers, AIRAH/State Government Victoria

AIRAH (2007) AIRAH technical handbook

AIRAH DA17 (2025): Cooling Towers

United Nations Environment Programme (2006) Electrical Energy Equipment: Cooling Towers

Green Building Council of Australia(Various dates), Green Star technical Manuals (Education v1, Healthcare v1, Office v3, Public Building v1, Industrial v1, Multi-unit Residential v1)

## <mark style="color:$primary;">Appendix</mark>

## Appendix A: Calculator data entry requirements

### Building information

This section outlines building attributes that affect water use calculations, including project details, occupancy, space uses, building type and location.

#### Project details

Disclose project and Green Star rating details in the 'Building information' tab. This includes:

* The Green Star project number and project name for the registered project.
* The assessment type and round.
* Whether credit substitution is being applied. Projects registered under Green Star Buildings v1.1 must select 'No'. Projects registered under Green Star Buildings v1 that are applying credit substitution must select 'Yes'. Refer to the *Guidance on credit substitution - Using Green Star Buildings v1.1 in Green Star Buildings v1* for guidance on applying credit substitution.
* The criterion targeted for Minimum Expectation. Refer to the Using the Water Use calculator section of this document for guidance.

#### Occupancy profiles

Occupancy profiles indicate the average occupancy of a building every hour within a day. Projects may use standard or custom occupancy profiles to define building space uses throughout the project.

The profiles used in the *Water Use calculator* must correlate with those used in the *Energy Use* model, except where the project team can demonstrate that periods of occupancy would not result in water use (e.g. sleeping people).

**Standard occupancy profiles**

Standard occupancy profiles for each building class are taken from *National Construction Code (NCC) 2022 Volume One: Specification 35, Table S35C2b – S35C2k.* Refer to *Appendix E: Standard occupancy profiles.* Select standard occupancy profiles within the 'Building space uses' table as outlined under the *Building space use* section of this guide.

**Custom occupancy profiles**

Custom occupancy profiles may be defined where none of the existing profiles are suitable for the space type. Create custom occupancy profiles by entering peak and off-peak profiles into the 'Custom occupancy profiles' section as outlined in *Figure 1.* There is space in the spreadsheet to enter up to eight user defined profiles. If more space is required, submit a 'Fix or modify a calculator/scorecard' request to the GBCA.

*Figure 1: How to enter custom occupancy profiles into the Water Use calculator*

{% stepper %}
{% step %}

## Select custom profiles

Select 'Yes' against the item: 'Does the project use occupancy profiles not included in Specification 35 of NCC 2022?'
{% endstep %}

{% step %}

## Name the profile

Enter a custom name into the 'Occupancy profile name' column of the table. This name will appear in the 'Occupancy profile' dropdown box so that it can be selected for one or more rows.
{% endstep %}

{% step %}

## Add a description

Add a brief description. This is for your own reference and helps communicate the custom profiles to the Certified Assessor(s).
{% endstep %}

{% step %}

## Enter occupancy percentages

Enter the percentage of maximum design occupancy that is typically present for each hour on a typical peak and off-peak day.
{% endstep %}
{% endstepper %}

#### Building space use

The 'Building space uses' table captures information on the project's designed spaces and the time spent by occupants in those spaces.

Divide the project into space types with different occupancy levels and patterns. For more information, refer to the appendix of the *Energy Use Calculation Guide*. Enter the following data for all occupied¹ space types.

**Space use description**

Name for the purpose of the space.

**Area**

Size of the space, entered in m².

**Peak days of operation per week**

The number of days per week that the space is occupied as described in the relevant 'peak' occupancy profile. The remaining days are assumed to follow the off-peak profile.

**Occupancy profile**

Enter how the space is occupied by either:

* Selecting one of the 10 standard occupancy profiles, listed from Specification 35 of the NCC 2022; or
* Selecting a custom occupancy profile as defined by the project.

Refer to the *Occupancy profiles* section above for guidance on specifying standard and custom occupancy profiles.

**Type of use**

Determine the maximum design occupancy by either:

* Selecting one of the standard design occupancies as per *Table D2D18* of the NCC 2022; or
* Entering the maximum design occupancy manually by selecting 'Other' and completing the 'Custom area per person (m2/person)' column.

**Area per person**

Determine the maximum design occupancy by either:

* Selecting a default design occupancy through the 'Type of use' as per *Table D2D18* of the NCC 2022; or
* Entering the maximum design occupancy manually into the 'Custom area per person' column where 'Other' has been selected in the 'Type of use' column.

Evidence must be provided to support any custom inputs.

**Users continually occupying the space for periods greater than an hour**

The percentage of occupants who occupy the space continuously for periods longer than one hour.

This figure must be determined by the design team. It is used to estimate the number of occupants in the project, a parameter required to calculate water demand from showers. It is assumed that only continuous project users will use shower facilities. Where multiple spaces are provided for the same project users, only one space should be considered as continually occupied to avoid double counting occupant water consumption as they move about the project.

The percentage should be the number of building occupants who might have access to the showers, not use them. For example, in the case of residential occupants, it would be 100% and 100% will use them. In the case of a retail space, the 'long-term' occupant population, rather than visitors, might be 5% of the maximum population density, but the number that use cyclist facilities might then be 15% of that 5% because the cyclist facilities are limited to that many users.

The maximum population with access to the showers is calculated from inputs in I16:I25. It is essential to capture the change in water demand from showers for projects where cyclist facilities may be increased or decreased from the census average within the *Movement and Place calculator.*

*Example*

A project has 100m² each of residential, commercial and café area.

The residential space would be 100% for both standard practice and reference shower demands.

The commercial and café reference shower demand would be equivalent to the reference in the *Movement and Place* Calculator. In this example, Adelaide's CBD rate of 3.3% is assumed.

The proposed shower demand for the commercial and cafe areas reflects the percentage of the occupant population that has access to cyclist facilities within the building, 15% for this example. To enter this into the calculator, an average of the percentages across the areas would be required as follows:

*Reference shower demand = (100m2 x 100% + 200m2 x 3.3%)/ 300m2 = 35.5%*

*Proposed shower demand = (100m2 x 100% + 200m2 x 15%)/ 300m2 = 43.3%*

***

¹ Occupied spaces include all spaces in the project except for those with no or low/transient occupancy such as stairwells, corridors and storage rooms.

#### Building type and location

Building details are used to determine benchmarks and location-based characteristics of water use. This includes:

* Building type
* Climate zone
* Site elevation (m)
* Bureau of Meteorology (BoM) 10-year average rainfall data location
* Daily rainfall (mm)
* Monthly evapotranspiration, point potential (mm)

**Building type**

Select the building type that reflects the single NCC usage classification:

* Residential – All Class 2 or 3 projects fall under the 'Residential' type.
* Non-residential – All other building classes fall under the 'Non-residential' type.

A mixed use project or building is deemed to be a building in which no single NCC usage classification accounts for more than 80% of the building gross floor area (GFA), excluding car parks, etc. Project teams must select the project type depending on the type applicable to the project. For further guidance on mixed use buildings, refer to the *Mixed use projects* section of the guide.

**Climate zone**

Select the NCC climate zone for the project from the following options:

* Climate zone 1, 2, and 5
* Climate zone 3, 4, 6, and 7
* Climate zone 8

**Site elevation (m above sea level)**

Enter the site elevation above sea level in metres (m). This is used to derive local atmospheric pressure for calculating water use for indoor swimming pools.

**Bureau of Meteorology (BoM) 10-year average rainfall data location**

Projects may select the relevant BoM 10-year average rainfall data location where relevant to the project. Refer to *Table 20* in *Appendix D: BoM 10-year average rainfall data* for available locations and default data. For projects not included in the default BoM 10-year average rainfall data location or looking to enter custom data, select 'User input'.

**Rainfall**

Where the BoM 10-year average rainfall data location is specified, the monthly and daily average rainfall is automatically populated in the 'Monthly Rainfall (mm)' and 'Daily Rainfall (mm)' columns respectively.

For projects not included in the default BoM 10-year average rainfall data location or looking to enter custom data, complete the 'User Input Daily Rainfall (mm)' column in line with the *Obtaining data from the Australian Bureau of Meteorology (BoM)* guidance below. The 'Monthly Rainfall (mm)' table is automatically populated based on the daily rainfall data provided.

**Evapotranspiration, point potential**

Obtain monthly average point potential evapotranspiration data from the Australian Bureau of Meteorology (BoM) in line with the *Obtaining data from the Australian Bureau of Meteorology (BoM)* guidance below. Note that 'evapotranspiration' and 'evaporation' are not the same. Use 'Point potential' evapotranspiration data.

**Obtaining data from the Australian Bureau of Meteorology (BoM)**

Obtain monthly average rainfall and point potential evapotranspiration data from the Australian Bureau of Meteorology (BoM). The highest resolution grid point extractions from base climatological data sets are required. For rainfall, the highest resolution currently available is based on a 2.5km grid. For point potential evapotranspiration, the highest resolution currently available is based on a 10km grid. Once the project team has extracted the data in the necessary format, enter it into the calculator.

{% hint style="warning" %}
For the purposes of Green Star, obtain data specific to the project site using the methodology outlined above. It is not acceptable to rely on the publicly available data on the BoM web site, as this is not verifiable data and does not have the resolution necessary to obtain accurate results from the calculator. The data sets purchased from the BoM must form part of the project's Green Star submission documentation.
{% endhint %}

An example of monthly rainfall and point potential evapotranspiration is provided in *Table 19* in *Appendix C: Point potential evapotranspiration example.*

The climate data can be obtained from the BoM for a nominal fee. More information about this data can be obtained from the Climate Maps section of the BoM website. To purchase this data, contact the BoM, National Climate Centre:

* Email: <webclim@bom.gov.au>
* Phone: (03) 9669 4082
* FAX: (03) 9669 4515

To obtain the necessary data, the BoM will require:

* Latitude and longitude grid points (coordinates) of the project in decimal degrees. These coordinates can be obtained from good quality maps, or from web based maps/images including Google Earth;
* The type of grid (meteorological element) required: rainfall and evapotranspiration (point potential);
* The period: average monthly data;
* The required output format: Excel.

### Sanitation

Enter data about fixtures and fittings included in the project in the 'Sanitation' section. The following information is required for each type of toilet, urinal, tap and shower installed in the project.

**Sanitation total water use**

The 'Sanitation total water use' section asks a series of yes/no questions to determine the inputs required within the 'Sanitation' tab. This information also helps determine the boundaries of the *Reference building* water consumption. All questions must be answered. *Table 8* briefly elaborates on the questions asked within this section.

*Table 8: Water system questions for the purpose of completing the 'Sanitation total water use' section of the 'Sanitation' tab.*

<table><thead><tr><th width="223">Fixtures and Fittings</th><th width="241">Water system question</th><th>Comments</th></tr></thead><tbody><tr><td>Toilets<br>Urinals<br>Indoor taps<br>Showers – occupants</td><td>Are fixtures and fittings provided for project occupant sanitation?</td><td>Select 'yes' where the project includes any toilets, urinals, taps or showers.</td></tr><tr><td>Showers – sports facilities</td><td>Does the project provide for sports activities? Have showers been installed for post/pre activity use?</td><td>Select 'yes' where the project includes a sporting facility as a part of the rated project, and where additional shower and/or change room facilities have been installed to support the installation of the sports facility. For example, the project might include a swimming pool, a gym, or a basketball court.</td></tr><tr><td>Other fixtures and fittings</td><td>Is the project a public building where there are water consumption loads associated with public water use?</td><td>Select 'yes' where the project is a public building such as railway stations or aquatic centres where there are water consumption loads associated with public water use.</td></tr></tbody></table>

**Description**

Enter a description of each fixture or fitting. This may include a product name and/or reference number.

**Water efficiency rating**

Enter water efficiency by either:

* Selecting the WELS Star Rating from the drop-down menu. The corresponding water efficiency is automatically generated. A WELS star rating is awarded when fixture efficiency is between a defined maximum and minimum water efficiency for that star rating. The calculator generates the efficiency with the highest water usage allowed for that WELS star rating in the 'Flow rate' column. Manually input the flow rate if it differs from the assumed flow rate for that star rating.
* Manually entering the actual water efficiency, if known. Select 'Manufacturer data' in the 'Water efficiency rating' column and complete the 'Custom flow rate' column.

**Flow rate**

The water efficiency of the fitting in L/min or L/flush.

* Where the WELS Star Rating has been specified in the 'Water efficiency rating' column, the corresponding water efficiency is automatically generated in the 'Flow rate' column.
* Where the actual water efficiency is to be entered, select 'Manufacturer data' in the 'Water efficiency rating' column and complete the 'Custom flow rate' column. This value is populated in the 'Flow rate' column. Evidence must be provided to support any custom inputs. The 'Custom flow rate' for showers is limited to a minimum of 6L/min as per *AS/NZS 3500.1:2025 Plumbing and drainage Table 3.2.1 – Minimum flow rates and loading units.*

**Distribution**

The percentage of fittings of this type to be installed with this water efficiency.

**Additional information required for urinals**

Where urinals are installed in the project, provide:

* Whether urinals would normally be installed in the building type. This informs total water use for toilets and urinals in the *Reference building*. For projects where the project team does not consider provision of urinals to form part of standard practice project design, select "No" from the drop-down menu against the question "Would urinals normally be installed in the project type?" Include justification for this selection in the submission template.
* Whether urinals are on an autotimer. For urinals on autotimer, provide the following information. If no urinals on autotimer are being installed, leave these sections blank:
  * Number of urinals on an automatic timer being installed in the project.
  * Average flow rate (L/flush), being the average water efficiency of urinals on an automatic timer being installed on the project.

**Additional information required for occupant showers**

Where showers for occupant use are included in the project, provide:

* Shower demand by occupants (Reference)
* Shower demand by occupants (Proposed)

For residential projects, this should be 100% for both the *Reference* and *Proposed building*.

For non-residential projects, this should align with assumptions in the *Movement and Place* credit. This includes the number of showers required in the *Changing Facilities* criterion in *Minimum Expectation* and/or the mode share corresponding to cyclists in the project's Sustainable Transport Plan in the *Sustainable Transport* criterion in the *Credit Achievement.* Use the same value for both the *Reference* and *Proposed building* in the *Water Use calculator*.

**Additional information required for sport showers**

Where the project provides for sports activities and showers have been installed for post/pre activity use, provide:

* Average expected patronage by sports participants per day. An average based on weekly figures may be used if required.
* Expected number of days per year that sporting facilities are open for use.

**Other fixtures water use**

Where there are water consumption loads not able to be captured in the designated tables, such as public buildings where there are water consumption loads associated with public water use, enter the following information.

**Enter a description of each fixture or fitting.**

The type of fixture: toilets, urinals, indoor taps, or showers.

**Total annual&#x20;*****Reference*****&#x20;(kL/year) and&#x20;*****Proposed*****&#x20;(kL/year) water consumption figure.**

The total annual *Reference* (kL/year) and *Proposed* (kL/year) water consumption figures are added to the sanitation total water use results for each fixture type.

### Whitegoods

Enter data about whitegoods included in the project in the 'Whitegoods' section. The following information is required for each type of clothes washing machine and dishwasher installed in the project.

**Whitegoods total water use**

The 'Whitegoods total water use' section asks a series of yes/no questions to determine the inputs required within the 'Whitegoods' tab. This information also helps determine the boundaries of the *Reference building* water consumption. All questions must be answered. *Table 9* briefly elaborates on the questions asked within this section.

*Table 9: Water system questions for the purpose of completing the 'Whitegoods total water use' section of the 'Whitegoods' tab.*

| Whitegoods       | Water system question                                  | Comments                                                                                                                                                             |
| ---------------- | ------------------------------------------------------ | -------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| Washing machines | Does the project include any clothes washing machines? | Select 'yes' where the project will include the specification and installation of clothes washing machines. This includes both domestic and commercial applications. |
| Dishwashers      | Does the project include any dishwashers?              | Select 'yes' where the project will include the specification and installation of dishwashers. This includes both domestic and commercial applications.              |

**Description**

Enter a description of each washing machine or dishwasher. This may include a product name and/or reference number.

**Water efficiency rating**

Enter water efficiency by either:

* Selecting the WELS Star Rating from the drop-down menu. The corresponding water efficiency is automatically generated. A WELS star rating is awarded when fixture efficiency is between a defined maximum and minimum water efficiency for that star rating. The calculator generates the efficiency with the highest water usage allowed for that WELS star rating in the 'Flow rate' column. The flow rate generated where the WELS star rating has been specified depends on the machine capacity, or place settings, for dishwashers.
* Manually entering the actual water efficiency, if known. Select 'Manufacturer data' in the 'Water efficiency rating' column and complete the 'Custom flow rate' column.

**Flow rate**

The water efficiency of the washing machine or dishwasher in L/kg or L/cycle.

* Where the WELS Star Rating has been specified in the 'Water efficiency rating' column, the corresponding water efficiency is automatically generated in the 'Flow rate' column.
* Where the actual water efficiency is to be entered, select 'Manufacturer data' in the 'Water efficiency rating' column and complete the 'Custom flow rate' column. Evidence must be provided to support any custom inputs. This value is populated in the 'Flow rate' column.

**Machine capacity**

The capacity of the whitegoods, being either the nominal kg/load capacity of the clothes washing machine or the number of place settings for the dishwasher.

**Quantity**

The number of each type of washing machine or dishwasher included in the project.

**Cycles per year**

The number of cycles per year for each type of washing machine or dishwasher. Where unknown, enter an assumed value of 365.

**Proportion of DHW per cycle**

The proportion of water used in washing machines and dishwashers that is domestic hot water (DHW). Define the proportion of hot water used in washing machines and dishwashers in accordance with the usage of the whitegoods' "normal" or default cycle, supported by manufacturer's documentation. Refer to the *Domestic hot water and the Energy Use calculator* section of this document for further information about domestic hot water use calculations.

### Heat rejection

Enter heat rejection data in the 'Heat rejection' section of the calculator. The following information is required for heat rejection systems present in the project.

**Proposed heat rejection system type**

Select the proposed heat rejection system type from the drop-down menu. The available options are summarised in *Table 10.* Where an available option is selected, the calculator determines the deemed evaporative duty fraction (f\_duty). The selected system must be consistent with inputs to the *Energy Use calculator*.

Projects seeking to specify a 'Custom duty fraction (%)' for the *Proposed building* may select 'Other (custom value)'.

**Duty fraction**

The duty fraction (f\_duty) is the proportion of the system's heat-rejection duty met evaporatively, and therefore consuming water. The remainder is rejected by dry, sensible means. Specify the duty fraction by either of the following methods:

* Where the 'Proposed heat rejection system type' has been selected from the available options, the calculator selects the deemed duty fraction as per *Table 10.* No input is required in 'Custom duty fraction (%)'. Additional systems may be added to the calculator in future updates.
* Where the project team has manufacturer selection data or modelled water-consumption output for the specific unit and climate, select 'Other (custom value)' within 'Proposed heat rejection system type' and complete the 'Custom duty fraction (%)'. The calculator populates this value in 'Duty fraction (%)'. Evidence must be provided to support any custom inputs.

In either case, the selected system must be consistent with inputs to the *Energy Use calculator*.

*Table 10: Deemed duty fraction for specified heat rejection systems*

| Heat rejection system type | Evaporative duty fraction (f\_duty) (%) |
| -------------------------- | --------------------------------------- |
| Conventional cooling tower | 1.0                                     |
| Evaporative cooler         | 1.0                                     |
| Air-cooled (no water)      | 0                                       |

**Reference building type**

Select the project type from the drop-down menu. The available options are summarised in *Table 3* within the *Heat rejection* section in the *Reference building assumptions* above. The selected building type must be consistent with inputs to the *Energy Use calculator*.

Projects seeking to specify a 'Custom HVAC system' for the *Reference building* may select 'Other (custom value)'.

**Assumed HVAC system**

The assumed HVAC system is specified as one of the following options, depending on the *Reference building* type as outlined within the *Heat rejection* section in the *Reference building assumptions* above:

* Air-cooled (no water) – The *Reference building* is assumed to install no water-cooled systems with f\_duty = 0.
* Water-cooled (evaporative) – The *Reference building* is assumed to install water-cooled systems with f\_duty = 1.0.

Specify the assumed HVAC system by either of the following methods:

* Where the 'Reference building type' has been selected from the available options, the calculator selects the assumed HVAC system as per *Table 3* within the *Heat rejection* section in the *Reference building assumptions* above. No input is required in 'Custom HVAC system'.
* Where the project is proposing an alternative HVAC system within the *Reference building,* select 'Other (custom value)' within 'Reference building type' and complete the 'Custom HVAC system'. The calculator populates this value in 'Assumed HVAC system'.

In either case, the selected system type must be consistent with inputs to the *Energy Use calculator*.

**Evaporation (monthly cooling load)**

Enter the thermal cooling load (kWh thermal/month) for each month in the *Proposed* and *Reference building*. Determine the thermal cooling load for each month through the energy modelling required as part of the *Energy Use calculator*.

Where the 'Proposed heat rejection system type' for the *Proposed building* is 'Air-cooled (no water)', the 'Proposed cooling load (kWh/month)' does not need to be completed. Where the 'Assumed HVAC system' for the *Reference building* is 'Air-cooled (no water)', the 'Reference cooling load (kWh/month)' does not need to be completed.

**Condenser water (ΔT in °C)**

Enter a predicted average Condenser Water Temperature Difference ΔT in °C.

Where the 'Proposed heat rejection system type' for the *Proposed building* is 'Air-cooled (no water)', the 'Proposed' value for 'Condenser water Δt (°C)' does not need to be completed.

**Drift coefficient (%)**

Enter the predicted drift coefficient in %. A default value of 0.002% is given. This is based on the requirement in *Section 4.4 of AS/NZS 3666.1 Air-handling and water systems of buildings—Microbial control.* If using a value different from the default, determine the drift coefficient as per *AS 4180.1 Drift loss from cooling towers - Laboratory measurement*.

Where the 'Proposed heat rejection system type' for the *Proposed building* is 'Air-cooled (no water)', the 'Proposed' value for 'Drift coefficient (%)' does not need to be completed.

**Cycles of concentration**

The ratio of Total Dissolved Solids (TDS), or conductivity, in the circulating water to that in the make-up water. Per *AIRAH DA17 Section 3.6.5 Cycles of concentration*, the cycles of concentration is selected by the designer or water-treatment provider and the bleed is adjusted to achieve it.

### Washdown

Provide the following information to determine washdown water use:

**Description**

Enter a description of each washdown water system.

**Hose flow rate (L/min)**

Flow rate for each hose expressed in litres per minute (L/min).

**Number of hoses**

Number of hoses included within the development for washdown.

**Average use (minutes/day)**

Number of minutes the hose is used each day (minutes per day).

### Landscape irrigation

Divide all landscaped areas in the project that will receive water via irrigation into zones. Each zone should have the same soil type, irrigation system, microclimate, plant density and, as far as possible, types of plants.

Enter the following data for each zone:

* Climate data: monthly rainfall data and monthly evapotranspiration data.
* Zone name and description.
* Area of zone (in m2).
* Percentage of zone undercover.
* Weighted average Crop Coefficient in the zone.
* Application Efficiency of irrigation system.

**Climate data**

Provide climate data, including monthly rainfall data and monthly evapotranspiration data, in the 'Building information' tab. Refer to the *Building type and location* section above in *Appendix A: Calculator data entry requirements* for further guidance.

**Name and description**

Name and describe each zone in enough detail for the Green Star Certified Assessor(s) to locate it on drawings.

**Area (m²)**

Enter the area of each zone in m².

**Area undercover (%)**

This refers to the total percentage of each zone that will receive very little or no rainfall because it is undercover. This applies to areas completely covered, for example by roofs; significantly covered, for example under awnings; or under dense vegetation such as trees with thick foliage.

**Weighted average crop coefficient (Kc)**

The crop coefficient is an agronomic multiplier used to determine water usage requirements for a particular plant type. Enter the **area weighted average** crop coefficient for the zone into the calculator. Crop Coefficients (Kc) for various plant types are available in *Appendix F: Crop coefficient (Kc).*

**Irrigation system**

Select the irrigation system used in each zone from a drop-down menu in the calculator. *Table 11* includes a list of irrigation systems that may be selected. Where the irrigation system is selected using the drop-down menu, the water application efficiency (%) is automatically populated.

Where the irrigation system is not included in this list or where irrigation efficiency differs from the standard values in *Table 11,* select 'User input' and manually enter the available irrigation efficiency into the 'Custom water application efficiency (%)' column.

**Water application efficiency (%)**

Many factors impact the application efficiency of an irrigation method, including uniformity, runoff, wind drift and evapotranspiration. For example, sprays have fixed application of water and generally cover short distances; sprinklers have rotating streams and cover larger distances; and underground drip systems are less affected by wind than above ground systems. The average values in *Table 11* reflect differences between irrigation system types.

*Table 11: Application efficiencies of common irrigation systems*

| Irrigation method     | Average application efficiency |
| --------------------- | ------------------------------ |
| Sprinklers – Day      | 65%                            |
| Sprinklers – Night    | 75%                            |
| Sprays – Day          | 65%                            |
| Sprays – Night        | 70%                            |
| Micro sprays – Day    | 60%                            |
| Micro sprays - Night  | 65%                            |
| Drip – Bare soil      | 80%                            |
| Drip – Under mulch    | 85%                            |
| Subsurface drip (SDI) | 90%                            |
| Hand watering         | 50%                            |

Where irrigation efficiency differs from standard values in *Table 11,* select 'User input' in the 'Irrigation system' column and enter the available irrigation efficiency in the 'Custom water application efficiency (%)' column. Where a user-determined application efficiency figure is used, additional compliance documentation is required to prove that such efficiency can be achieved. The application efficiency of rainfall is assumed to be 60%.

### Swimming pools

Enter data about swimming pools included in the project in the 'Swimming pools' section. Where the project is an aquatic centre, refer to the *Aquatic centres* section below. Where the project is not an aquatic centre but includes an outdoor or indoor swimming pool, refer to the *Outdoor pools* or *Indoor pools* sections below.

**Swimming pools total water use**

The 'Swimming pools total water use' section asks a series of yes/no questions to determine the inputs required within the 'Swimming pools' tab. This information also helps determine the boundaries of the *Reference building* water consumption. All questions must be answered. *Table 12* briefly elaborates on the questions asked within this section.

*Table 12: Water system questions for the purpose of completing the 'Swimming pools total water use' section of the 'Swimming pools' tab.*

| Swimming pools | Water system question                                                                         | Comments                                                                                               |
| -------------- | --------------------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------ |
| Swimming pools | For projects that are not an aquatic centre, are there any swimming pools within the project? | Select 'yes' where the project is not an aquatic centre but includes indoor or outdoor swimming pools. |
| Aquatic centre | Is the project an aquatic centre?                                                             | Select 'yes' where the project is an aquatic centre.                                                   |

A project cannot be classified as having both swimming pools and being an aquatic centre for the purposes of the calculator. If project teams have separately modelled the monthly water consumption of all swimming pools in their project, the aquatic centre classification is recommended.

#### Aquatic centres

***Reference*****&#x20;and&#x20;*****Proposed*****&#x20;water use (kL)**

Enter monthly water consumption in kL for a *Reference* and *Proposed building* as modelled by the project team. Submit a Technical Question to the GBCA to review the modelling assumptions and methodology used. Include a copy of the GBCA Technical Question response, along with any additional requirements outlined in the response, in the submission.

#### Outdoor pools

**Is the swimming pool outdoor or indoor?**

Specify whether the swimming pool is 'Indoor' or 'Outdoor' using the drop-down list.

**Volume (m³)**

Enter the swimming pool volume in cubic metres (m³).

**Surface area (m²)**

Enter the swimming pool surface area in m².

**Water consumption for filter cleaning (backwash) (L/clean)**

Enter the amount of water used by backwash, or filter cleaning, in litres per cleaning cycle (L/clean). Where the 'Water consumption for filter cleaning (backwash) (L/clean)' is not provided, the standard practice water efficiency value of 250 L/clean is used. Refer to the *Swimming pools* section in the *Reference building assumptions* above for further details.

**Filter cleaning frequency (cleans/year)**

Enter the frequency that filter cleaning is undertaken each year (cleans/year). Where the 'Filter cleaning frequency (cleans/year)' is not provided, the standard practice water efficiency value of 5 cleans/year is used. Refer to the *Swimming pools* section in the *Reference building assumptions* above for further details.

**Is a pool cover provided?**

Specify whether the pool has a cover.

**Climate data**

Provide climate data, including monthly rainfall data and monthly evapotranspiration data, in the 'Building information' tab. Refer to the *Building type and location* section above in *Appendix A: Calculator data entry requirements* for further guidance.

#### Indoor pools

**Is the swimming pool outdoor or indoor?**

Specify whether the swimming pool is 'Indoor' or 'Outdoor' using the drop-down list.

**Volume (m³)**

Enter the swimming pool volume in cubic metres (m³).

**Surface area (m²)**

Enter the swimming pool surface area in m².

**Water consumption for filter cleaning (backwash) (L/clean)**

Enter the amount of water used by backwash, or filter cleaning, in litres per cleaning cycle (L/clean). Where the 'Water consumption for filter cleaning (backwash) (L/clean)' is not provided, the standard practice water efficiency value of 250 L/clean is used. Refer to the *Swimming pools* section in the *Reference building assumptions* above for further details.

**Filter cleaning frequency (cleans/year)**

Enter the frequency that filter cleaning is undertaken each year (cleans/year). Where the 'Filter cleaning frequency (cleans/year)' is not provided, the standard practice water efficiency value of 5 cleans/year is used. Refer to the *Swimming pools* section in the *Reference building assumptions* above for further details.

**Minimum pool hall exhaust air volume based on the requirements of AS1668.2 (m³/year)**

Enter the minimum exhaust rate from the pool hall required by *AS 1668.2:2024 The use of ventilation and airconditioning in buildings.*

**Proposed design pool hall exhaust air volume (m³/year)**

Enter the proposed project exhaust rate from the pool hall per year (m³/year).

**Average pool hall temperature while pool exhaust is operating (°C)**

Enter the average internal air dry-bulb temperature (°C) within the pool hall.

**Site elevation (m above sea level)**

Provide the site elevation above sea level in metres (m) in the 'Building information' tab. Refer to the *Building type and location* section within *Appendix A: Calculator data entry requirements*.

### Fire protection systems

Enter data about the fire protection system in the 'Fire protection systems' section. The following information is required for fire protection systems installed in the project.

**Does the building's sprinkler system discharge water during testing?**

Specify whether the project discharges any water for fire protection system testing. Where "No" is selected, it is assumed that no water is used for fire protection systems testing, and no further inputs are required.

**Testing frequency (tests/year)**

Enter the number of tests per year. Where there is more than one type of fire test per year with differing water volumes, determine and include an average across all fire tests in the calculator. Include details of this calculation in the project's submission.

**Water discharged (kL/test)**

Enter the quantity of water discharged per test in kL.

**Proportion of water captured per test (%)**

Confirm the percentage of discharged water captured for reuse.

### Process cooling

Enter data about process cooling systems in the 'Process cooling' section. The following information is required for process cooling systems installed in the project.

**Is all water-based process cooling provided by closed loop systems?**

Disclose whether all water-based process cooling is provided by closed loop systems. Where "Yes" is selected, the project is assumed to have zero water use due to process cooling, and no further inputs are required.

**Evaporation losses (kL/day)**

Enter daily evaporation losses from the system.

**Water discharged to sewer (kL/day)**

Enter daily discharge to sewer by the system.

**Proportion of daily demand that is potable water**

Enter the percentage of open loop process cooling water demand sourced from potable water (%).

### Sitewide water systems

Projects must include the use of the following sitewide or shared water systems that are completely or partially sourced by reclaimed water:

* Demands for reclaimed water that have not already been included in the calculator. The calculator assumes that water demands from any 'non-potable water' uses are met before the 'potable water' water uses.
* Shared rainwater, greywater or blackwater systems for projects approved for the MBSR Approach or Site-Wide Credit Approach.

Sitewide or shared water use systems that do not contribute to or use reclaimed water are excluded from the *Water Use calculator.*

Enter data about sitewide or shared systems in the 'Sitewide water systems' section. Additional data entry requirements specific to non-potable water systems, shared rainwater systems, and shared greywater or blackwater systems are summarised in the *Reclaimed water* section below.

**Description**

Enter a description of the sitewide or shared water use system.

**Shared systems water use (kL)**

Enter monthly water demand for reclaimed water (kL/month) for each sitewide non-potable water use or shared water use system. Refer to the *Shared Rainwater Collection and Reuse* and *Shared Greywater or Blackwater Collection and Reuse* sections below for further information about relevant systems present on site.

### Other uses of reclaimed water

The project team calculates demand for reclaimed water from other uses on a monthly basis. Enter total monthly water demand directly into the calculator rather than determining it using the *Water Use calculator*.

{% stepper %}
{% step %}

## Enter monthly demand

To establish reclaimed water demand, enter the monthly water demand (kL/month) for each non-potable water use, such as wash down, as shown in *Figure 2*. Complete this table only if reclaimed water is used to meet the demands of these end uses. If reclaimed water is not used for these end uses, leave these cells blank.

When reclaimed water is used, enter the total demand for each month regardless of whether it is fully or partially met by the reclaimed water supply.

*Figure 2: Monthly demand of non-potable water uses connected to reclaimed water sources in the 'Sitewide water systems' tab*
{% endstep %}

{% step %}

## Enter reclaimed water distribution

Enter the percentage of each non-potable water use connected to an on-site rainwater system, greywater system, blackwater system, stormwater or off-site supply of recycled water, or mains water, into the 'Distribution of reclaimed water use' table within the 'Reclaimed water' tab, as shown in *Figure 3*. Refer to the *Reclaimed water use* section below for further guidance.

*Figure 3: Percentage of non-potable water uses connected to reclaimed water sources in the 'Reclaimed water' tab*
{% endstep %}
{% endstepper %}

### Shared Rainwater Collection and Reuse

Projects with multiple buildings sharing a central rainwater tank must use the following procedure to calculate the amount of rainwater available for the rated project site.

{% stepper %}
{% step %}

## Enter collection area and storage capacity

Enter the total rainfall collection area (m²) and total storage capacity (kL) for the central rainwater tank into the 'Reclaimed water' section of the calculator. Refer to *Figure 4* and the *Rainwater* section of this document for further guidance.

*Figure 4: Inputs for shared rainwater systems in the 'Reclaimed water tab'*
{% endstep %}

{% step %}

## Calculate demand across served projects

Undertake separate calculations covering all projects served by the central rainwater system. Use these calculations to calculate overall rainwater demand based on demand from all projects and ancillary services, such as landscaping, being served, given the collection area and storage tank capacity.
{% endstep %}

{% step %}

## Enter shared-project demand

Enter monthly rainwater demand (kL) from the other projects that will utilise the central rainwater tank into the 'Shared systems water use' table within the 'Sitewide water systems' tab. Refer to *Figure 5* for an example of how to complete this table.

*Figure 5: Monthly demand of shared rainwater systems in the 'Sitewide water systems' tab*
{% endstep %}

{% step %}

## Set rainwater distribution

In the 'Distribution of reclaimed water use' table within the 'Reclaimed water' tab, indicate that 100% of the non-potable water will be met by rainwater. The *Water Use calculator* assumes these demands are met first before allocating remaining rainwater to uses nominated within the rated project site. Refer to *Figure 6* and the *Reclaimed water use* section below for further guidance.

*Figure 6: Percentage of non-potable water uses connected to shared rainwater systems in the 'Reclaimed water' tab*
{% endstep %}
{% endstepper %}

### Shared Greywater or Blackwater Collection and Reuse

Projects with multiple buildings or fitouts sharing a central greywater or blackwater treatment plant must follow the following procedure to calculate greywater or blackwater available for the rated project site. As the procedures are essentially the same for both water sources, the example focuses on greywater but can also be used for blackwater.

Undertake separate calculations covering all projects served by the central greywater system. Use these calculations to calculate overall greywater demand based on demand from all projects and ancillary services, such as landscaping, being served, given the collection sources utilised. Enter greywater contributed to and used by shared systems into the 'Shared systems water use' as separate columns, as outlined below and demonstrated in *Figure 7*.

**Where the central greywater treatment system collects from additional sources outside of the rated project site:**

* Enter the additional water collected (kL/month) into the 'Shared systems water use' table within the 'Sitewide water systems' tab. Refer to the 'Shared water system 1 (kL)' column within *Figure 7* for an example.
* In the 'Greywater collection' table within the 'Reclaimed water' tab, indicate that 100% of discharge water from the shared greywater collection source will be collected. Refer to *Figure 8* and the *Reclaimed water use* section below for further guidance.

**Where the central greywater treatment system is used to meet additional demands outside of the rated project site:**

* Enter these demands into the 'Shared systems water use' table within the 'Sitewide water systems' tab. This should include monthly greywater demand (kL) from the other projects that will utilise the central greywater treatment plant. Refer to the 'Shared water system 2 (kL)' column within *Figure 7* for an example.
* In the 'Distribution of reclaimed water use' table within the 'Reclaimed water' tab, indicate that 100% of non-potable water will be met by greywater. The *Water Use calculator* assumes these demands are met first before allocating remaining greywater to uses nominated within the rated project site. Refer to *Figure 9* and the *Reclaimed water use* section below for further guidance.

*Figure 7: Monthly contribution of shared greywater systems in the 'Sitewide water systems' tab*

*Figure 8: Percentage of greywater collection for shared greywater collection systems in the 'Reclaimed water' tab*

*Figure 9: Percentage of non-potable water uses connected to shared greywater systems in the 'Reclaimed water' tab*

### Reclaimed water

The 'Reclaimed water systems' section asks a series of yes/no questions to determine inputs required within the 'Reclaimed water' tab. *Table 13* briefly elaborates on the questions asked within this section.

*Table 13: Reclaimed water system questions for the purpose of completing the 'Reclaimed water systems' section of the 'Reclaimed water' tab.*

<table><thead><tr><th width="209.25">Reclaimed water system</th><th width="289.25">Water system question</th><th>Comments</th></tr></thead><tbody><tr><td>Greywater</td><td>Does the project include greywater capture, treatment and reuse systems?</td><td>Select 'yes' where the project includes greywater collection and treatment for reuse on site.</td></tr><tr><td>Blackwater</td><td>Does the project include blackwater capture, treatment and reuse systems?</td><td>Select 'yes' where the project includes blackwater collection and treatment for reuse on site.</td></tr><tr><td>Rainwater</td><td>Does the project include rainwater capture and reuse systems?</td><td>Select 'yes' where the project includes a rainwater tank for the capture and reuse of rainwater on site.</td></tr><tr><td>Stormwater &#x26; off-site</td><td>Does the project include other stormwater reuse or an off-site supply of non-potable water?</td><td>Select 'yes' where either stormwater is captured for reuse, or a recycled water supply is available for use within the project.</td></tr></tbody></table>

#### Reclaimed water use

**Distribution of reclaimed water use (%)**

To establish potable water reclaimed water demand:

* Enter the percentage of each potable water use connected to an on-site rainwater system, greywater system, blackwater system, or off-site supply of recycled water.
* Enter the percentage of each potable water use connected to mains water only.

Where a water use has only a limited portion of fixtures connected to a reclaimed water system, enter a percentage between 0% and 100% to account for this. For example, a refurbished project where only 80% of urinals were able to be plumbed into a recycled water system. Enter the balance under the 'Mains water supply (%)' input column. This scenario is illustrated in *Figure 10*.

More than one reclaimed water source may be entered for each water use. This is shown in *Figure 10*, where both toilets and urinals are served by rainwater and greywater sources.

*Figure 10: Percentage of water uses connected to reclaimed water sources*

Following this methodology, where demand from a particular water use can be met by water supplied from more than one source, total reclaimed water demands can add up to more than 100% of actual demand. This is not an error because the 'Mains water supply (%)' demand is also calculated, which limits the reduction in potable water demand from reclaimed systems. Regardless of how much reclaimed water is available, if water uses are not connected to the reclaimed water system, reclaimed water will not be used.

Daily demand for reclaimed water from non-potable water uses is calculated in the same way as for potable water uses. Refer to the *Other uses of reclaimed water* section above for further details.

#### Greywater and blackwater

Establish the quantity of greywater and blackwater collected, treated and used on site by determining the percentage of water uses collected on-site for reuse, in addition to any non-potable water uses collected. Calculations for greywater and blackwater availability are performed daily, taking into account varying seasonal demand.

To establish the maximum amount of greywater and/or blackwater available daily, enter:

* The percentage of discharge from toilets, urinals, taps, showers, whitegoods, heat rejection bleed, swimming pool backwash, fire sprinkler test water and process cooling discharge that is collected and treated for reuse on site. Enter a percentage between 0 and 100 for all uses.
* The percentage of discharge collection and treated for re-use from other sources, such as chiller condensate, cooling tower wash down or sewer mining. Enter these into the 'Greywater collection' and 'Blackwater collection' tables in *Figure 11* below. For guidance on shared water system inputs, refer to the *Shared Greywater or Blackwater Collection and Reuse* section in *Sitewide water systems* above.

*Figure 11: Percentage of water uses collected for greywater and blackwater recycling*

### Rainwater

The quantity of rainwater collected on site depends on available rainfall, the size of the rainwater storage tank and collection area. Rainwater availability calculations are undertaken daily to account for daily rainfall variations, seasonal rainwater demand, such as where rainwater is used for cooling systems or irrigation, and the ability of the rainwater tank to store water where supply exceeds demand from one day to the next.

To establish the maximum amount of rainwater collected, enter the following inputs.

**Rainfall collection area (m²)**

Enter the rainwater collection area in square metres (m²).

**Roof type**

Select the roof type from the drop-down list. Available options are summarised in *Table 14*.

**Run-off coefficient**

The calculator selects the associated run-off coefficient based on the selected 'Roof type'. The run-off coefficients for available roof types are summarised in *Table 14*.

*Table 14: Run-off coefficients for different roof types. Source: BSI British Standards (2009), Rainwater Harvesting Systems – Code of Practice.*

| Roof type                                 | Run-off coefficient |
| ----------------------------------------- | ------------------- |
| Pitched roof with profiled metal sheeting | 0.9                 |
| Pitched roof with tiles                   | 0.8                 |
| Flat roof without gravel                  | 0.8                 |
| Flat roof with gravel                     | 0.65                |
| Green roof, intensive                     | 0.5                 |
| Green roof, extensive                     | 0.7                 |
| Permeable pavement – Granular media       | 0.7                 |
| Permeable pavement – Plastic crates       | 0.8                 |

**Storage capacity**

Enter total rainwater storage capacity in kilolitres (kL).

**Rainwater tank reliability**

An indicator of rainwater tank efficiency as a water supply for the project. A low percentage efficiency indicates a tank that is continually unable to satisfy rainwater demand, for example where the project location has very dry summers and wet winters.

*Figure 12: Inputs for rainwater collection systems*

### Stormwater or off-site recycled water source

Using stormwater, collected either on or off-site, or an off-site recycled water source is an acceptable way to achieve reductions in potable water consumption in Green Star, provided that it can be demonstrated that the relevant local authority has approved its use. Any reclaimed water system must be operational at the time of practical completion of the project.

Enter both stormwater and off-site recycled water sources in kilolitres for each month (kL/month). For stormwater, follow the calculation methodology in the *Waterway Protection* credit. For any off-site water supply, validate the monthly volumes entered into the calculator with the water supply authority.

*Figure 13: Monthly volume of stormwater or off-site reclaimed water source available*

*Table 15: Landscape irrigation definitions*

| Parameter                                       | Description                                                                                                                    |
| ----------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------ |
| Application efficiency of irrigation system (%) | The percentage of water applied via an irrigation system which is taken up by the plants.                                      |
| Application efficiency of rainfall (%)          | The percentage of rainfall that is assumed to be taken up by the plants.                                                       |
| Crop Coefficient                                | The crop coefficient is an agronomic multiplier used to determine the water usage requirement for a particular plant type.     |
| Monthly point potential Evapotranspiration (mm) | Point potential evapotranspiration data from the Bureau of Meteorology.                                                        |
| Monthly rainfall (mm)                           | Rainfall data from the Bureau of Meteorology.                                                                                  |
| Percentage of zone undercover (%)               | This refers to the total percentage of the zone that will receive very little or no rainfall, as a result of being undercover. |

### Results

Results for the Sanitary Fixture and Appliance Efficiency, Recycled Water Infrastructure, and Reducing Water Use criteria are presented in the 'Results' tab. This section of the *Water Use calculator*:

* Allows the project team to indicate the water use systems included within the project.
* Presents total water use for each water use system for the *Reference* and *Proposed building* (kL/year).
* Presents total reclaimed water provided for the *Proposed building* (kL/year).
* Presents total potable water use for the *Reference* and *Proposed building* (kL/year).
* Presents total monthly water use across all systems for the *Reference* and *Proposed building* (kL/month).
* Determines reduction in potable water use for the *Reference building* compared to the *Proposed building* (%).
* Presents the outcome of the Sanitary Fixture and Applicant Efficiency or Reducing Water Use in *Minimum Expectation*².
* Determines points to be awarded for Reducing Water Use in *Credit Achievement* and *Exceptional Performance*².
* Calculates domestic hot water use to be included in the *Energy Use calculator*.

#### Total water use

The calculator's 'Total water use' includes a project checklist allowing the project to nominate all systems included within the project. The checklist asks a series of yes/no questions to determine inputs required throughout the remainder of the calculator. This information also helps determine boundaries of the *Reference building's* water consumption. All questions must be answered. *Table 16* briefly elaborates on the questions asked within the *Water Use calculator*.

*Table 16: Water system questions for the purpose of completing the 'Total water use' section of the 'Results' tab.*

<table><thead><tr><th width="213">Water use system</th><th width="251">Water systems questions</th><th>Comments</th></tr></thead><tbody><tr><td>Sanitation</td><td>Are fixtures and fittings provided for project occupant sanitation?</td><td>Select 'yes' where the project includes any toilets, urinals, taps or showers.</td></tr><tr><td>Whitegoods</td><td>Does the project include any dishwashers or clothes washing machines?</td><td>Select 'yes' where the project will include the specification and installation of dishwashers or clothes washing machines. This includes both domestic and commercial applications of these two items.</td></tr><tr><td>Heat rejection</td><td>Does the project utilise water-based heat rejection (Project cooling)?</td><td>Select 'yes' where the project is utilising water-based heat rejection equipment. This includes conventional cooling towers, in addition to hybrid air/water cooled equipment. Select 'no' if the project will utilise an air-based heat rejection system.</td></tr><tr><td>Washdown</td><td>Does the project include washdown areas?</td><td>Select 'yes' where the project includes a washdown area.</td></tr><tr><td>Landscape irrigation</td><td>Are there any landscaped areas within the project?</td><td>Select 'yes' where landscaped areas have been included in the project.</td></tr><tr><td>Swimming pools</td><td>Are there any swimming pools within the project?</td><td>Select 'yes' where any swimming pools or spas are included within the project, including if the project is an aquatic centre.</td></tr><tr><td>Fire protection systems</td><td>Does the project include a fire protection system?</td><td>Select 'yes' where the project includes a water-based fire protection system, even where this is just a partial water-based solution.</td></tr><tr><td>Process cooling</td><td>Does the project include any water-based process cooling?</td><td>Select 'yes' where the project includes equipment that requires water for process cooling.</td></tr><tr><td>Reclaimed water</td><td>Does any water collection, reclamation and/or reuse occur on the project site?</td><td>Select 'yes' where any form of reclaimed water capture or use is present on the project.</td></tr></tbody></table>

***

² Please note that the final decision to award points and the *Minimum Expectation* is at the discretion of the Certified Assessor(s) at the time of assessment.

## Appendix B: Calculation methodologies

### Building space use

The concept of person-hours is used in this calculation methodology. A person-hour means that one person has spent one hour in the space. The number of person-hours per month for each space is calculated as follows:

$$
Hours\_{person} = (A\_{space} / Occupancy\_{design}) \times Hours\_{Equivalent}
$$

**Where:**

* Hours<sub>person</sub> = Person hours per month
* A<sub>space</sub> = Area of space
* Occupancy<sub>design</sub> = Maximum design occupancy of A<sub>space</sub>
* Hours<sub>Equivalent</sub> = Equivalent hours at max occupancy in month

**And:**

$$
Hours\_{Equivalent} = (Hours\_{Equivalent,peak} \times Days\_{peak}) + (Hours\_{Equivalent,offpeak} \times Days\_{offpeak})
$$

**Where:**

* Hours<sub>Equivalent,peak</sub> = Equivalent hours at maximum occupancy in a peak day (hours)
* Days<sub>peak</sub> = Number of peak days per month
* Hours<sub>Equivalent,offpeak</sub> = Equivalent hours at maximum occupancy in an offpeak day (hours)
* Days<sub>offpeak</sub> = Number of offpeak days per month

The equivalent hours at maximum occupancy in a peak or off-peak day is calculated by summing percentages in the relevant occupancy profile. This figure represents the equivalent number of hours that the space is occupied at maximum design occupancy. For example, the occupancy profile for a Class 5 building shown in *Table 21* in *Appendix E: Standard occupancy profiles*—the NCC 2022 *Table S35C2c* 'peak day' profile—describes a space occupied from 7am until 9pm. Occupancy varies from 15% at 7am, up to 100% at 9am, down to 5% at 8pm. By summing the percentages, equivalent hours at maximum occupancy is 9.5 hours on a 'peak' day for this space type.

The number of occupants present at peak and off-peak times during the day is needed to estimate water demand from occupant showers. The following calculation is for a peak day; the Calculator undertakes the same calculation for off-peak days:

$$
Staff\_{peak} = (A\_{space} / Occupancy\_{design}) \times %*{occupancy} \times %*{Staff}
$$

**Where:**

* Staff<sub>peak</sub> = Number of staff present on a peak day
* A<sub>space</sub> = Area of space
* Occupancy<sub>design</sub> = Maximum design occupancy of $A\_{space}$
* %<sub>occupancy</sub> = Maximum percentage of design occupancy present during peak day
* %<sub>Staff</sub> = Percentage of occupants who are staff, who use the space as their primary place of work

The exception is showers installed for sports facilities, where water demand is more closely related to patronage engaging in sporting activities. Daily patronage of occupants engaging in sports activities is multiplied by the number of days the facility operates to estimate annual water consumption associated with shower amenities installed for sports participants. Monthly water consumption is then determined by dividing annual water consumption by the number of days in a year and multiplying the result by the number of days for each month.

### Sanitation

Total annual water demand from fixtures and fittings for occupant sanitation is calculated as the sum of water demand from toilets, urinals, taps and showers:

$$
\dot{V}*{sanitation,year} = \dot{V}*{toilets,year} + \dot{V}*{urinals,year} + \dot{V}*{taps,year} + \dot{V}*{occupant\ shower,year} + \dot{V}*{sports\ shower,year} + \dot{V}\_{other,year}
$$

**Where:**

* $$\dot{V}\_{\text{sanitation,year}}$$ = Annual water demand from all sanitation fixtures and fittings (kL/year)
* $$\dot{V}\_{\text{toilets,year}}$$ = Annual water demand from toilets (kL/year)
* $$\dot{V}\_{\text{urinals,year}}$$ = Annual water demand from urinals (kL/year)
* $$\dot{V}\_{\text{taps,year}}$$ = Annual water demand from indoor taps (kL/year)
* $$\dot{V}\_{\text{occupant shower,year}}$$ = Annual water demand from occupant showers (kL/year)
* $$\dot{V}\_{\text{sport shower,year}}$$ = Annual water demand from sport showers (kL/year)

#### Annual water demand from toilets, urinals and taps

The following calculations are for a fixture or fitting and apply to toilets, urinals and taps. This is used to calculate $\dot{V}*{toilets,year}$, $\dot{V}*{urinals,year}$ and $\dot{V}\_{taps,year}$ above. Annual results are prorated daily to be incorporated into the daily demand calculation.

$$
\dot{V}*{fixture\ or\ fitting,year} = Uses*{fixture\ or\ fitting,year} \times Efficiency\_{fixture\ or\ fitting} \times 0.001
$$

**Where:**

* $$\dot{V}\_{\text{fixture or fitting,year}}$$ = Annual water demand from fixture or fitting (kL/year)
* $$\text{Uses}\_{\text{fixture or fitting,year}}$$ = Number of fixture or fitting uses per year
* $$\text{Efficiency}\_{\text{fixture or fitting}}$$ = Average flow rate of all fixtures or fittings of a given type (L/flush or L/min)

**And:**

$$
Uses\_{fixture\ or\ fitting,year} = Hours\_{person} \times Usage\_{fixture\ or\ fitting}
$$

**Where:**

* $$\text{Hours}\_{\text{person}}$$ = Number of person hours per year
* $$\text{Usage}\_{\text{fixture or fitting}}$$ = Usage rate (as per )

**And:**

$$
Efficiency\_{fixture\ or\ fitting} = (%\_a \times Efficiency\_a) + (%\_b \times Efficiency\_b) + ...
$$

**Where:**

* $$%\_{x}$$ = Distribution (%) of each fixture or fitting (x)
* $$\text{Efficiency}\_{x}$$ = Flow rate (L/flush or L/min) of each fixture or fitting (x)

*Table 17: Assumed usage rates of toilets, urinals and taps*

| Fixtures and Fittings   | Number of uses per person per day (based on data for 9.5 hour workday³) | Uses per person-hour |
| ----------------------- | ----------------------------------------------------------------------: | -------------------: |
| Toilets without urinals |                                                                     2.3 |                 0.24 |
| Toilets with urinals    |                                                                     1.3 |                 0.14 |
| Urinal                  |                                                                       1 |                 0.11 |
| Taps                    |                                                                     2.5 |                 0.26 |

³ This is the equivalent hours at maximum occupancy for an office space as defined in NCC 2022 Table S35C2c Weekday occupancy and operation profiles of a Class 5 building, a Class 7 warehouse, a Class 8 Laboratory or a Class 9a clinic, day surgery or procedure unit.

#### Annual water demand from showers – occupants

The following calculations are for showers for project occupant use. Annual results are prorated daily to be incorporated into the daily demand calculation.

$$
\dot{V}*{occupant\ shower,year} = Uses*{occupant\ shower,year} \times Efficiency\_{occupant\ shower} \times Length\_{occupant\ shower}
$$

**Where:**

* $$\dot{V}\_{\text{occupant shower,year}}$$ = Annual water demand from occupant showers (L/year)
* $$\text{Uses}\_{\text{occupant shower,year}}$$ = Number of occupant shower uses per year
* $$\text{Efficiency}\_{\text{occupant shower}}$$ = Average of all occupant showers water efficiency (L/min)
* $$\text{Length}\_{\text{occupant shower}}$$ = Average length of occupant shower (minutes)

***

**And:**

$$
Uses\_{occupant\ shower,year} = ((Occupant\_{peak} \times %*{occupant,shower} \times Days*{peak}) + \\
(Occupant\_{offpeak} \times %*{occupant,shower} \times Days*{offpeak})) \times 365/7
$$

**Where:**

* $$\text{Occupant}\_{\text{peak}}$$ = Number of uses on peak or off peak days per week
* $$%\_{\text{occupants,shower}}$$ = Percentage of occupants who shower, as described below
* $$\text{Days}\_{\text{peak}}$$ = Number of peak or off peak days per week

***

**And:**

$$
Efficiency\_{occupant\ shower} = (%\_a \times Efficiency\_a) + (%\_b \times Efficiency\_b) + ...
$$

**Where:**

* $$%\_{x}$$ = Distribution (%) of each occupant shower (x)
* $$\text{Efficiency}\_{x}$$ = Flow rate (L/min) of each occupant shower (x)

***

**And:**

$$
Length\_{occupant\ shower} = 5min
$$

#### Annual water demand from showers – sports facilities

Where a project's purpose is to cater for sporting activities, where users will need and use shower facilities, such as a swimming pool, the project team must estimate the number of users per day and number of days per year the project operates in this capacity. Annual results are prorated daily to be incorporated into the daily demand calculation.

$$
\dot{V}*{sport\ shower,year} = Uses*{sport\ shower,year} \times Efficiency\_{sport\ shower} \times Length\_{sport\ shower}
$$

**Where:**

* $$\dot{V}\_{\text{sport shower,year}}$$ = Annual water demand from sport showers (L/year)
* $$\text{Uses}\_{\text{sport shower,year}}$$ = Number of sport shower uses per year
* $$\text{Efficiency}\_{\text{sport shower}}$$ = Average of all sport showers water efficiency (L/min)
* $$\text{Length}\_{\text{sport shower}}$$ = Average length of sport shower (minutes)

**And:**

$$
Uses\_{sport\ shower,year} = Days\_{open,year} \times Patronage\_{average,day}
$$

**Where:**

* $$\text{Days}\_{\text{open,year}}$$ = Number of days sporting facilities used per year (days/year)
* $$\text{Patronage}\_{\text{average,day}}$$ = Expected participation in sporting activities (people/day)

An average based on weekly figures may be used if required to determine $$\text{Patronage}\_{\text{average,day}}$$.

**And:**

$$
Efficiency\_{sport\ shower} = (%\_a \times Efficiency\_a) + (%\_b \times Efficiency\_b) + ...
$$

**Where:**

* $$%\_{x}$$ = Distribution (%) of each sport shower (x)
* $$\text{Efficiency}\_{x}$$ = Flow rate (L/min) of each sports shower (x)

**And:**

$$
Length\_{sport\ shower} = 5min
$$

#### Other fixture use

Where water consumption loads cannot be captured in the designated tables, such as public buildings where water consumption loads are associated with public water use, enter a total annual *Reference* (kL/year) and *Proposed* (kL/year) water consumption figure. This is added to the 'Sanitation total water use' for the relevant 'Fixture Type'. Annual results are prorated daily to be incorporated into the daily demand calculation.

### Whitegoods

Total water demand for whitegoods is calculated as the sum of water demand from washing machines and dishwashers.

$$
\dot{V}*{whitegoods,year} = \dot{V}*{WM,year} + \dot{V}\_{DW,year}
$$

**Where:**

* $$\dot{V}\_{\text{whitegoods,year}}$$ = Annual water demand from washing machines and dishwasher (kL/year)
* $$\dot{V}\_{\text{WM,year}}$$ = Annual water demand from washing machines (kL/year)
* $$\dot{V}\_{\text{DW,year}}$$ = Annual water demand from dishwashers (kL/year)

Water demand from washing machines and dishwashers is calculated annually and prorated daily as outlined below.

#### Annual water demand from washing machines

The following calculations are for annual water demand due to washing machines.

$$
\dot{V}*{WM,year} = V*{WM,a} + V\_{WM,b} + ...
$$

**Where:**

$$V\_{\text{WM},x}$$ = Annual water demand (kL/year) from each washing machine (x)

**And:**

$$
V\_{WM,x} = Efficiency\_{WM,x} \times Capacity\_{WM,x} \times Quantity\_{WM,x} \times Cycles\_{WM,x} \times 0.001
$$

**Where:**

* $$\text{Efficiency}\_{\text{WM},x}$$ = Machine flow rate (L/kg)
* $$\text{Capacity}\_{\text{WM},x}$$ = Machine capacity (kg/cycle)
* $$\text{Quantity}\_{\text{WM},x}$$ = Number of machines (units)
* $$\text{Cycles}\_{\text{WM},x}$$ = Number of cycles per year (cycles/year)

Where unknown, assume the number of cycles per year to be $$\text{Cycles}\_{\text{WM},x} = 365$$.

#### Annual water demand from dishwashers

The following calculations are for annual water demand due to dishwashers.

$$
\dot{V}*{DW,year} = V*{DW,a} + V\_{DW,b} + ...
$$

**Where:**

$$V\_{\text{DW},x}$$ = Annual water demand (kL/year) from each dishwasher (x)

**And:**

$$
\dot{V}*{DW,annual} = Efficiency*{DW,x} \times Cycles\_{DW,x} \times Quantity\_{DW,x} \times 0.001
$$

**Where:**

* $$\text{Efficiency}\_{\text{DW},x}$$ = Machine flow rate (L/cycle)
* $$\text{Cycles}\_{\text{DW},x}$$ = Number of cycles per year (cycles/year)
* $$\text{Quantity}\_{\text{DW},x}$$ = Number of machines (units)

### Heat rejection

The calculation methodology used for heat rejection is based on:

* AIRAH DA17 (2025): Cooling Towers
* AS/NZS 3666.1:2011 - Air-handling and water systems of buildings - Microbial control
* AS 4180.1:2008 - Measurement of drift loss from cooling towers

#### Heat rejection total water use

Annual water demand is the sum of monthly heat-rejection water demand across the year. The monthly total is then prorated daily to align with the calculator's time step.

Monthly make-up water follows the *AIRAH DA17 Section 3.6.6 System water balance*:

$$
\dot{V}*{make\ up} = \dot{V}*{evaporation} + \dot{V}*{drift} + \dot{V}*{bleed} + \dot{V}\_{uncontrolled\ losses}
$$

**Where:**

* $$\dot{V}\_{\text{make up}}$$ = Monthly volume of make up water (kL)
* $$\dot{V}\_{\text{evaporation}}$$ = Monthly volume of evaporated water (kL)
* $$\dot{V}\_{\text{drift}}$$ = Monthly volume of drift water (kL)
* $$\dot{V}\_{\text{bleed}}$$ = Monthly volume of bleed water (kL)
* $$\dot{V}\_{\text{uncontrolled losses}}$$ = Other monthly uncontrolled losses: splash out, windage, leaks, overflow and pump gland leakage (kL)

For a system designed to minimise uncontrolled water losses as per AIRAH DA17 Section 3.5.6 Design and risk management, the calculator assumes $$\dot{V}\_{\text{uncontrolled losses}} = 0$$.

#### Evaporation (latent-heat method)

Evaporation is the heat rejected divided by enthalpy of vaporisation, multiplied by the system's evaporative duty fraction. Because it is anchored to heat duty rather than an assumed air flow, the result is independent of fan sizing. For hybrid and adiabatic systems, duty fraction captures the wet, evaporative stage; the dry stage rejects the balance without consuming water.

Evaporation is calculated directly from heat rejected. A cooling tower achieves its effect predominantly by evaporating a small portion of circulating water. Therefore, evaporation is a function of heat rejected:

$$
\dot{V}*{evaporation} = (Q*{cooling} \times f\_{duty} / \Delta H\_{vap}) \times 3600/1000
$$

**Where:**

* $$Q\_{\text{cooling}}$$ = Monthly cooling load rejected (kWh thermal)
* $$\Delta H\_{\text{vap}}$$ = Enthalpy of vaporisation of water (kJ/kg), taken as 2,430 kJ/kg as per the AIRAH DA17 value at typical cooling tower design water temperatures of 35°C and 29.5°C (AIRAH DA17 Section 3.6 Waterside design considerations)
* $$f\_{\text{duty}}$$ = Evaporative duty fraction for the heat rejection system type; refer to the Heat rejection section in Appendix A: Calculator data entry requirements of this guide

At $$\Delta H\_{\text{vap}} = 2{,}430$$ kJ/kg, this evaluates to approximately 1% of circulating flow per 5.5 °C of range (AIRAH DA17 Section 3.6 Waterside design considerations).

The latent fraction, the share of heat rejected as latent rather than sensible load, is held implicitly within $$\Delta H\_{\text{vap}}$$ at approximately 1.0 on the basis that the thermodynamic latent share sits at 0.97 to 1.00 across Australian capital cities in all seasons. Seasonal variation is captured by the calculator's monthly resolution, so no separate latent-fraction or derating term is applied.

#### Drift

$$
\dot{V}*{drift} = C*{Drift} \times \dot{V}\_{condenser}
$$

**Where:**

* $$C\_{\text{Drift}}$$ = Drift coefficient
* $$\dot{V}\_{\text{condenser}}$$ = Monthly total condenser water flow (L)

**And:**

$$
\dot{V}*{condenser} = (Q*{cooling} \times 3600) / (C\_{p,water} \times \Delta T\_{condenser})
$$

**Where:**

* $$C\_{p,\text{water}}$$ = Specific heat of water (4.18 kJ/(kg·°C))
* $$\Delta T\_{\text{condenser}}$$ = Condenser water temperature difference (°C)

#### Bleed

$$
\dot{V}*{bleed} = max(0, \dot{V}*{evaporation}/(COC-1) - (\dot{V}*{drift} + \dot{V}*{uncontrolled\ losses}))
$$

**Where:**

* Bleed = Bleed water (kL)
* COC = Number of cycles of concentration

Drift is subtracted from bleed, as per *AIRAH DA17 Section 3.6 Waterside design considerations*, because drift already carries dissolved solids out of the system and contributes to concentration control. The calculation prevents negative bleed in the rare case where drift alone satisfies the concentration-control requirement. For a system designed to minimise uncontrolled water losses as per *AIRAH DA17 Section 3.5.6 Design and risk management*, the calculator assumes $$\dot{V}\_{\text{uncontrolled losses}} = 0$$.

#### Constants

*Table 18: Heat rejection water constants*

| Constant                            | Value           |
| ----------------------------------- | --------------- |
| Enthalpy of vaporisation (ΔH\_vap)  | 2,430 kJ/kg     |
| Specific heat of water (C\_p,water) | 4.18 kJ/(kg·°C) |
| Density of water at 25 °C⁴          | 0.997 kg/L      |

⁴ Density of water at 25 °C is assumed to be 1 kg/L⁴ for the purpose of calculations within the *Water Use calculator*.

### Washdown

The washdown water calculation methodology uses hose flow rate, number of hoses and average daily use to calculate proposed annual water consumption. Annual results are prorated daily to be incorporated into the daily demand calculation.

The calculation used to determine wash down water consumption is:

$$
\dot{V}*{washdown,year} = FlowRate \times #of\ hoses \times Uses*{minutes,daily} \times 365/1000
$$

**Where:**

* $$\dot{V}\_{\text{washdown,year}}$$ = Annual water demand from hoses (kL/year)
* $$\text{FlowRate}$$ = Flow rate of each hose (L/min)
* $$\text{# of hoses}$$ = Number of hoses included within the development for washdown
* $$\text{Uses}\_{\text{minutes,daily}}$$ = Number of minutes the hose is used each day (minutes/day)

### Landscape irrigation

This methodology uses site specific input parameters to determine monthly and annual water demand from irrigation. It simultaneously determines performance of a *Reference building* in the same location.

Calculate irrigation requirement for each month of the year and for each landscaped zone in the site. A zone is a landscaped area with the same soil type, irrigation system, microclimate, plant density and, as far as possible, types of plants.

{% stepper %}
{% step %}

## Calculate monthly irrigation requirement

Calculate irrigation requirement for each zone for each month of the year:

$$
Irrigation\ requirement\_{zone,month} = (Demand\_{plant} - Rainfall) / Efficiency\_{irrigation}
$$

Where:

* $$\text{Demand}\_{\text{plant}}$$ = Plant water demand (mm)
* $$\text{Rainfall}$$ = Rainfall available for plants (mm)
* $$\text{Efficiency}\_{\text{irrigation}}$$ = Application efficiency of the irrigation system (%)

And:

$$
\text{Demand}*{\text{plant}} = \text{Epan}*{\text{month}} \times K\_{C}
$$

Where:

* $$\text{Epan}\_{\text{month}}$$ = Monthly point potential Evapotranspiration (mm)
* $$K\_{C}$$ = Weighted average Crop Coefficient

And:

$$
\text{Rainfall} = \text{Rainfall}*{\text{month}} \times \text{Efficiency}*{\text{rain}} \times (1 - %\_{\text{Undercover}})
$$

Where:

* $$\text{Rainfall}\_{\text{month}}$$ = Monthly rainfall (mm)
* $$\text{Efficiency}\_{\text{rain}}$$ = Application efficiency of rainfall (%)
* $$%\_{\text{Undercover}}$$ = Percentage of zone undercover (%)

A zone's monthly irrigation requirement is calculated by determining how much water plants in the zone require and how much water will be provided naturally by rainfall. The amount to be provided from an irrigation system is determined by taking into account the efficiency of the irrigation system in delivering water to plants.
{% endstep %}

{% step %}

## Calculate annual irrigation requirement

Add irrigation requirements for each month to calculate the total annual irrigation requirement (mm).
{% endstep %}

{% step %}

## Calculate zone irrigation requirement

Multiply annual irrigation requirement in mm by zone area in m² to calculate the zone's annual irrigation requirement (kL/month).
{% endstep %}

{% step %}

## Calculate total monthly demand

Determine the monthly irrigation requirement (kL/month) across all zones. Prorate monthly results daily to incorporate them into the daily demand calculation.
{% endstep %}
{% endstepper %}

Parameters informing landscape irrigation are summarised in the *Landscape irrigation* section in *Appendix A: Calculator data entry requirements* above.

### Swimming pools

Total water demand for swimming pools is calculated using different methodologies depending on whether the project is an aquatic centre or whether a swimming pool is indoors or outdoors. Monthly water consumption is prorated from seasonally dependent monthly water consumption to derive a daily demand for calculation of annual potable water consumption.

The calculation methodology for outdoor and indoor swimming pools is derived from:

* ACT Planning and Land Authority (ACTPLA) design and siting requirements for water efficiency;
* ASHRAE 1997 fundamentals handbook.

#### Aquatic centres pool water use

For aquatic centres, the project must demonstrate monthly water consumption data for a *Reference* and *Proposed building* by undertaking its own modelling. Submit a Technical Question to the GBCA to review the methodology used.

Monthly results disclosed by the project team are prorated daily to be incorporated into the daily demand calculation.

#### Monthly water demand from outdoor swimming pools

The following methodology applies to outdoor swimming pools with and without a pool cover. Monthly results are prorated daily to be incorporated into the daily demand calculation.

**Outdoor swimming pools without a pool cover**

For outdoor swimming pools without a pool cover, calculate monthly average water demand as follows:

$$
Demand\_{outdoor\ pool,month} = (Evaporation\_{month} + Backwash\_{month}) \times Area\_{pool}
$$

Where:

* $$\text{Demand}\_{\text{outdoor pool}}$$ = Monthly average water use of an outdoor pool without a pool cover (L)
* $$\text{Evaporation}\_{\text{month}}$$ = Monthly evaporation consumption (mm)
* $$\text{Backwash}\_{\text{month}}$$ = Monthly apportioned backwash, or filter cleaning, (mm)
* $$\text{Area}\_{\text{pool}}$$ = Surface area of the outdoor pool (m²)

And:

$$
\text{Evaporation}*{\text{month}} = (\text{Evaporation}*{\text{month,pool}} - \text{Rainfall}\_{\text{month}})
$$

Where:

* $$\text{Evaporation}\_{\text{month,pool}}$$ = Average monthly evaporative from swimming pool (mm)
* $$\text{Rainfall}\_{\text{month}}$$ = Average monthly rainfall (mm)

And:

$$
\text{Evaporation}*{\text{month,pool}} = \text{Epan}*{\text{month}} \times K\_{C,\text{pool}} \times \text{Rainfall}\_{\text{month}}
$$

Where:

* $$\text{Epan}\_{\text{month}}$$ = Average monthly point potential evapotranspiration (mm)
* $$K\_{C,\text{pool}}$$ = Evaporation coefficient, assumed to be 0.7

And:

$$
\text{Backwash}*{\text{month}} = (\text{Backwash}*{\text{annual}} \times \text{Days}\_{\text{month}}) / 365
$$

Where:

* $$\text{Backwash}\_{\text{annual}}$$ = Annual backwash demand (mm)

And:

$$
\text{Backwash}*{\text{annual}} = (\text{Demand}*{\text{filter}} / \text{Area}\_{\text{pool}}) \times \text{Frequency}
$$

Where:

* $$\text{Demand}\_{\text{filter}}$$ = Filter cleaning demand (L/clean)
* $$\text{Frequency}$$ = Frequency of filter cleaning operations (cleans/year)

Where either 'Water consumption for filter cleaning (backwash) (L/clean)' or 'Filter cleaning frequency (cleans/year)' are not provided, standard practice water efficiency values of $$\text{Demand}\_{\text{filter}} = 250$$ L/clean and $$\text{Frequency} = 5$$ cleans/year are used.

**Outdoor swimming pools with a pool cover**

For outdoor swimming pools with a pool cover, calculate monthly average water demand in line with the calculations above. However, assume evaporation is negligible from April to October.

**From November to March:**

$$
Demand\_{outdoor\ pool,month} = (Evaporation\_{month} + Backwash\_{month})) \times Area\_{pool}
$$

**From April to October:**

$$
Demand\_{outdoor\ pool,month} = (Backwash\_{month})) \times Area\_{pool}
$$

#### Monthly water demand from indoor swimming pools

The following methodology applies to indoor swimming pools. Monthly results are prorated daily to be incorporated into the daily demand calculation.

$$
Demand\_{indoor\ pool,month} = Evaporation\_{month} + Backwash\_{month}
$$

Where:

* $$\text{Evaporation}\_{\text{month}}$$ = Monthly evaporation consumption (L)
* $$\text{Backwash}\_{\text{month}}$$ = Monthly apportioned backwash, or filter cleaning, (L)

And:

$$
\text{Evaporation}*{\text{month}} = \dot{m}*{\text{exhaust}} \times \omega\_{\text{exhaust}}
$$

Where:

* $$\dot{m}\_{\text{exhaust}}$$ = Average mass of air exhausted from pool hall (kg/month)
* $$\omega\_{\text{exhaust}}$$ = Air moisture content at pool hall temperature (kg water/kg dry air)

And:

$$
\text{Backwash}*{\text{month}} = (\text{Backwash}*{\text{annual}} \times \text{Days}\_{\text{month}}) / 365
$$

Where:

* $$\text{Backwash}\_{\text{annual}}$$ = Annual backwash demand (mm)

And:

$$
\text{Backwash}*{\text{annual}} = (\text{Demand}*{\text{filter}} / \text{Area}\_{\text{pool}}) \times \text{Frequency}
$$

Where:

* $$\text{Demand}\_{\text{filter}}$$ = Filter cleaning demand (L/clean)
* $$\text{Frequency}$$ = Frequency of filter cleaning operations (cleans/year)

Where 'Water consumption for filter cleaning (backwash) (L/clean)' or 'Filter cleaning frequency (cleans/year)' are not provided, standard practice water efficiency values of $$\text{Demand}\_{\text{filter}} = 250$$ L/clean and $$\text{Frequency} = 5$$ cleans/year are used.

### Fire protection systems

Annual consumption is determined by discharge from the fire protection system during testing and the amount captured for reuse. The indicated reuse component is incorporated into calculations to contribute to project water reuse. Annual results are prorated daily to be incorporated into the daily demand calculation.

$$
\dot{V}*{fire\ protection} = Frequency \times V*{discharged} \times (1 / p\_{captured})
$$

Where:

* $$\dot{V}\_{\text{fire protection}}$$ = Annual water use due to fire protection system testing (kL/year)
* $$\text{Frequency}$$ = Testing frequency (tests/year)
* $$V\_{\text{discharged}}$$ = Water discharged per test (kL/test)
* $$p\_{\text{captured}}$$ = Proportion of water captured per test (%)

### Process cooling

Total water demand for process cooling is calculated using different methodologies depending on whether the system is closed loop or open loop. In both cases, annual results are prorated daily to be incorporated into the daily demand calculation.

#### Closed loop systems

Where the system is closed loop, the calculator assumes annual water use will be minimal. Therefore, if the project team indicates that process cooling is provided by closed loop systems, annual water consumption is assumed to be zero.

#### Open loop systems

Where the project team identifies open loop process cooling systems, apply the following calculations to determine annual system demand.

$$
\dot{V}*{process\ cooling} = (Evap + Discharge) \times %*{potable} \times 365
$$

**Where:**

* $$\text{Evap}$$ = Evaporation losses per day (kL/day)
* $$\text{Discharge}$$ = Water discharged to sewer (kL/day)
* $$%\_{\text{potable}}$$ = Proportion of daily demand that is potable water (%)

### Sitewide water systems

Reclaimed water used or contributed by shared water systems is included in reclaimed water available to the project. Any demand for reclaimed water allocated to non-potable water uses or shared water systems is subtracted from reclaimed water available to the project before claiming reductions on site. Monthly results disclosed by the project team are prorated daily to be incorporated into the daily demand calculation.

Refer to the *Reclaimed water* section below for further information about reclaimed water calculation methodology.

### Reclaimed water

The calculator uses the following steps to determine the impact of reclaimed water use on reductions in potable water consumption:

{% stepper %}
{% step %}

## Select reclaimed water systems

Select reclaimed water systems included in the project. Refer to the Reclaimed water section in Appendix A: Calculator data entry requirements for further information about inputs.
{% endstep %}

{% step %}

## Determine reclaimed water demand

Determine how much reclaimed water is used on site to establish water demand that could be met with reclaimed water. The methodology for establishing demand is given in the *Demand for reclaimed water* section.
{% endstep %}

{% step %}

## Determine reclaimed water availability

Determine how much reclaimed water is available to be collected on-site for rainwater, greywater and blackwater. For off-site recycled water supply, define the maximum volume of water available from this source. The methodology for establishing these quantities is given in the *Availability of reclaimed water* section.
{% endstep %}

{% step %}

## Determine reclaimed water utilisation

Determine whether available reclaimed water can be utilised by daily site demands. This involves assessing water balance between available sources and competing demands. Where there is insufficient reclaimed water to meet a demand, assume mains potable water is used instead.
{% endstep %}
{% endstepper %}

#### Demand for reclaimed water

Demand for reclaimed water sets the **upper limit** to reclaimed water use; it is the maximum potential demand. Demand for 'mains water only' is also calculated. This defines the minimum quantity of mains water used. Therefore, regardless of how much reclaimed water is available, if water uses are not connected to the reclaimed water system, reclaimed water will not be used.

Establish demands separately for each of the following water sources:

* Greywater systems
* Blackwater systems
* Rainwater systems
* Stormwater and off-site reclaimed water systems
* Mains water only

Where water uses are supplied from more than one source, assume they are first supplied from any greywater and blackwater systems, followed by rainwater, stormwater and off-site reclaimed water systems. This ensures the maximum potential of greywater and blackwater systems can be claimed within the calculator.

#### Availability of reclaimed water

Establish the quantity of reclaimed water available by requesting project team inputs on:

* Climate data, as provided in the 'Building information' tab
* Rainfall collection areas
* Storage tank sizes
* Percentage of water uses collected on-site for recycling
* Volume of water collected from any non-potable water uses, as disclosed in the 'Site-wide water systems' tab
* Water available from any off-site recycled water supply, as disclosed in the 'Site-wide water systems' tab

#### Utilisation of reclaimed water

The method for calculating reclaimed water utilisation is linked between each water use and reclaimed water source. This allows the *Water Use calculator* to account for water uses that may utilise reclaimed water from more than one source, such as the example in *Figure 10*, where toilets and urinals were served by a combination of rainwater and greywater.

The following section describes the calculator's process for establishing reclaimed water utilised on the project. Inputs entered for reclaimed water demand and availability are used in this section. No additional inputs are required.

**Summary**

Calculate maximum potential demand for reclaimed water for a particular water use, from rainwater; greywater and blackwater; or stormwater and off-site reclaimed water systems, daily using total daily water demands from each water use and percentages of water uses connected to each type of reclaimed water system.

{% stepper %}
{% step %}

## Establish rainwater tank volume

Establish rainwater tank volume at day one.
{% endstep %}

{% step %}

## Establish total reclaimed water demand

Establish total volume of reclaimed water demand, regardless of source, for the first water use.
{% endstep %}

{% step %}

## Establish reclaimed water available

Establish volume of reclaimed water available from each reclaimed water source on day one, after subtracting non-potable water reclaimed water demands: rainwater, established at step 1 for day one; greywater; blackwater; and off-site recycled water.
{% endstep %}

{% step %}

## Establish reclaimed water required

Establish volume of reclaimed water required from each water source to meet demands of the first water use.
{% endstep %}

{% step %}

## Calculate reclaimed water utilised

Calculate volume of reclaimed water utilised from each water source to meet demands of the first water use.
{% endstep %}

{% step %}

## Repeat for each additional water use

Repeat Steps 2 to 5 for each additional water use in the project. Availability of a reclaimed water source subtracts reclaimed water utilised by a previous water use in the sequence.
{% endstep %}

{% step %}

## Establish end-of-day rainwater tank volume

Establish rainwater tank volume at the end of day one. This becomes the volume of the rainwater tank at the beginning of day two after additional rainfall is added to the tank. Treated greywater and blackwater can only be held for 24 hours due to health requirements; where the full volume is not used within a day, it is rejected to sewer.
{% endstep %}
{% endstepper %}

**Calculation methodology**

**Step 1 - Establish rainwater tank volume on day one**

To ensure a fair assessment of rainwater reuse, initialise the tank by undertaking a full year of daily rainwater calculations to determine rainwater tank volume on day one.

Quantity of rainwater available for use depends on rainwater already in the tank from previous days, rain that can be collected on the day in question, and a volume of rainwater that must be diverted from the tank at each rain event to prevent contaminants polluting the tank, referred to as a 'first flush⁵'. The amount of rain that can be collected depends on monthly rainfall and size, pitch and absorbency of the collection area. First flush is always assumed to be 0.5L/m² (*HB 230-2008 Rainwater Tank Design and Installation Handbook*). Apply first flush reductions only on days when rainfall events occur.

Where maximum tank capacity is reached due to one or more heavy rain events, do not add further water to the tank and set remaining volume at the end of the day equal to tank capacity. This ensures undersized tanks do not provide a false indication of rainwater reuse.

The equation used to determine available rainwater is:

$$
Rainwater\_{available} = Rainwater\_{prev} + Rainwater\_{new} - Rainfall\_{FF}
$$

Where:

* $$\text{Rainwater}\_{\text{available}}$$ = Rainwater available for use on day (x) (kL)
* $$\text{Rainwater}\_{\text{prev}}$$ = Rainwater already in tank from previous day's rainfall (kL)
* $$\text{Rainwater}\_{\text{new}}$$ = Rainfall on collection area on day (x) (kL)
* $$\text{Rainfall}\_{\text{FF}}$$ = Rainwater diverted as first flush (kL)

And:

$$
\text{Rainwater}\_{\text{prev}} = 0 \text{ (for day (x)) or, Result from step 7 (previous day)}
$$

And:

$$
\text{Rainwater}*{\text{new}} = \text{Day}*{x} \times A\_{\text{collection}} \times C\_{\text{runoff}}
$$

Where:

* $$\text{Day}\_{x}$$ = 10 year average daily data for each day (mm)
* $$A\_{\text{collection}}$$ = Collection area (m²)
* $$C\_{\text{runoff}}$$ = Runoff coefficient

And:

$$
\text{Rainfall}*{\text{FF}} = 0.5 \times A*{\text{collection}}
$$

⁵ First Flush: The first rainfall event may contain higher than average amounts of accumulated dust, industrial pollutants, bird and animal droppings, leaves and other debris. Rainwater collection systems typically divert this initial rainfall to drain to ensure good quality of collected rainwater.

Step 2 – Establish total volume of reclaimed water demand for the first water use

Step 2 sets maximum reclaimed water demand for each water use. Starting with toilets on 1 January, calculate maximum reclaimed water demand for toilets as follows:

$$
\text{Reclaimed Water Demand}*{\text{toilets max}} = (\text{Demand}*{\text{toilets}} \times (1 - %\_{\text{toilets}}))
$$

Where:

* $$\text{Reclaimed Water Demand}\_{\text{toilets max}}$$ = Maximum potential demand for reclaimed water for toilets on 1 January
* $$%\_{\text{toilets}}$$ = Percentage of toilets served by mains potable water
* $$\text{Demand}\_{\text{toilets}}$$ = Water demand from toilets on 1 January

Step 3 – Establish volume of reclaimed water available from each reclaimed water source on day one

Step 3 calculates reclaimed water available from each reclaimed water source that could be used to meet demand. Rainwater availability is covered in Step 1 and is not repeated here. Greywater and blackwater use a similar method to calculate reclaimed water available for reuse. Calculate greywater available on 1 January for use as follows:

$$
\text{Greywater available} = (\text{Demand}*{\text{toilets}} \times %*{\text{grey toilet}} + \\
\text{Demand}*{\text{urinals}} \times %*{\text{grey urinals}} + \ldots) + \text{Greywater available}*{\text{shared}} - \text{Greywater used}*{\text{shared}}
$$

Where:

* $$\text{Greywater available}$$ = Greywater available on 1 January
* $$\text{Demand}\_{\text{toilets}}$$ = Water demand from toilets on 1 January
* $$%\_{\text{grey toilets}}$$ = Percentage of toilets from which greywater is collected for reuse
* $$\text{Demand}\_{\text{urinals}}$$ = Water demand from urinals on 1 January
* $$%\_{\text{grey toilets}}$$ = Percentage of urinals from which greywater is collected for reuse
* $$\text{Greywater available}\_{\text{shared}}$$ = Greywater contributed by any non potable or shared or site wide water systems
* $$\text{Greywater used}\_{\text{shared}}$$ = Greywater demand from other non potable or shared or site wide water systems

Stormwater and off-site recycled water source availability is calculated differently because values are entered directly as kL/month. For these inputs, prorate the monthly value to daily kL/day available to meet demand.

Step 4 - Establish volume of reclaimed water required from each water source to meet demands

Step 4 considers demand requirements for each reclaimed water source independently. Using this method, where demand for a particular water use could be met by water supplied from more than one source, total reclaimed water demands of each independent source can add up to more than 100% of total reclaimed water demand calculated at Step 2. This is not an error because demand calculated at Step 2 provides a limit for Step 5.

Calculation for each reclaimed water source is similar to the example below for rainwater. Starting with toilets on 1 January, calculate maximum rainwater demand for toilets as follows:

$$
\text{Rainwater Demand}*{\text{toilets max}} = (\text{Demand}*{\text{toilets}} \times %\_{\text{toilet rain max}})
$$

Where:

* $$\text{Rainwater Demand}\_{\text{toilets max}}$$ = Maximum potential demand for rainwater for toilets on 1 January
* $$\text{Demand}\_{\text{toilets}}$$ = Water demand from toilets on 1 January
* $$%\_{\text{toilets rain max}}$$ = Maximum percentage of toilets served by rainwater

Calculate volume of rainwater required for each non-potable, shared or sitewide water use using the same method to determine $$\text{Rainwater Demand}\_{\text{shared max}}$$.

**Step 5 - Calculate volume of reclaimed water utilised from each water source to meet demands**

Undertake daily calculations in a cascading manner. For each water use, check that the nominated reclaimed water source has capacity to service demand before allowing potable water to be substituted with reclaimed water. Where a reclaimed water source has met its capacity limit and no other source is available, assume remaining demand is met by mains potable water.

Assess greywater first, followed by blackwater, rainwater, and then off-site and stormwater sources. The logic flow representing this assessment is demonstrated by the flow chart in *Figure 14*. The example in *Figure 14* is for toilets; apply the same methodology to all non-potable water uses, including non-potable, shared or site-wide systems.

*Figure 14: Flowchart showing the reclaimed water utilisation methodology*

**Step 6 - Repeat Steps 2 to 5 for each additional water use in the project**

Steps 2 to 5 describe how the Water Calculator establishes reclaimed water utilised for the first water use, but do not address subsequent water uses such as urinals, irrigation or heat rejection. Calculations are essentially the same for each ensuing water use, except Step 3 requires reassessment of availability for each reclaimed water source.

For each following water use, reclaimed water available becomes reclaimed water remaining:

$$
Greywater\ remaining = Greywater\ available - Greywater\ utilised\_{toilets+...}
$$

Where:

* $$\text{Greywater remaining}$$ = Greywater available after subtracting greywater utilised by previous water uses
* $$\text{Greywater available}$$ = Greywater available on 1 January
* $$\text{Greywater utilised}\_{\text{toilets}+\ldots}$$ = Greywater utilised by previous water uses

Step 7 – Establish volume of rainwater tank at the end of the day

After repeating Steps 2 to 5 for all water uses, calculate a summary of reclaimed water sources utilised. Reset volumes for the next day of daily calculations. The following equation establishes rainwater tank volume on the next day:

$$
\text{Rainwater}*{\text{available}} = \text{Rainwater}*{\text{prev}} - \text{Rainwater}*{\text{demand},x} + \text{Rainwater}*{\text{new}} - \text{Rainfall}*{\text{FF}} - \text{Rainwater}*{\text{demand,shared}}
$$

Where:

* $$\text{Rainwater}\_{\text{available}}$$ = Rainwater available for use on day (x) (kL)
* $$\text{Rainwater}\_{\text{prev}}$$ = Rainwater in tank at start of previous day (kL)

Rainwater\_demand,x = Rainwater used on previous day (kL)

Rainwater\_new = Rainfall on collection area on day (x) (kL)

Rainfall\_FF = Rainwater diverted as first flush (kL)

Rainwater\_demand,shared = Rainwater demand from other non potable, shared, and site wide uses on day (x) (kL)

In undertaking the above calculation, the *Water Use calculator* also reviews whether the rainwater tank reaches its capacity with any new rainfall added to the tank.

Volume\_day start = MAX \[0 AND MIN of \[Cap\_tank AND Rainwater\_available]]

**Where:**

Cap<sub>tank</sub> = Tank storage capacity (kL)

**Results**

**Total water use**

The 'Total water use' table presents the total water use for each water use system for the *Reference* and *Proposed building* (kL/year), and the reclaimed water provided for the *Proposed building* (kL/year) as calculated in each previous section of the calculator. This table is specific to projects targeting the Reducing Water Use criterion in all performance levels.

The total potable water use for the *Reference* and *Proposed building* (kL/year) is given by the following formula:

$$
\begin{aligned}
\dot{V}*{\text{total,year}} = {} & \dot{V}*{\text{sanitation,year}} + \dot{V}*{\text{whitegoods,year}} + \dot{V}*{\text{heat rejection,year}} + \dot{V}*{\text{washdown,year}} \\
& + \dot{V}*{\text{landscape irrigation,year}} + \dot{V}*{\text{swimming pools,year}} + \dot{V}*{\text{fire protection systems,year}} \\
& + \dot{V}*{\text{process cooling,year}} - \dot{V}*{\text{reclaimed,year}}
\end{aligned}
$$

Where:

* $$\dot{V}\_{\text{total,year}}$$ = Annual potable water demand from all potable water uses (kL/year)
* $$\dot{V}\_{\text{sanitation,year}}$$ = Annual potable water demand from all sanitation fixtures and fittings (kL/year)
* $$\dot{V}\_{\text{whitegoods,year}}$$ = Annual potable water demand from dishwashers and washing machines (kL/year)
* $$\dot{V}\_{\text{heat rejection,year}}$$ = Annual potable water demand from heat rejection systems (kL/year)
* $$\dot{V}\_{\text{washdown,year}}$$ = Annual potable water demand from washdown (kL/year)
* $$\dot{V}\_{\text{landscape irrigation,year}}$$ = Annual potable water demand from landscape irrigation (kL/year)
* $$\dot{V}\_{\text{swimming pools,year}}$$ = Annual potable water demand from swimming pools or aquatic centre water use (kL/year)
* $$\dot{V}\_{\text{fire protection systems,year}}$$ = Annual potable water demand from fire protection systems (kL/year)
* $$\dot{V}\_{\text{process cooling,year}}$$ = Annual potable water demand from process cooling (kL/year)
* $$\dot{V}\_{\text{reclaimed,year}}$$ = Annual reclaimed water use from all non potable water sources and across all systems (kL/year)

And:

$$
\dot{V}*{\text{reclaimed,year}} = \text{Greywater}*{\text{total use,year}} + \text{Blackwater}*{\text{total use,year}} + \text{Rainwater}*{\text{total use,year}} + \text{Stormwater}\_{\text{total use,year}}
$$

Where:

* $$\text{Greywater}\_{\text{total use,year}}$$ = Annual total greywater use across all water systems (kL/year)
* $$\text{Blackwater}\_{\text{total use,year}}$$ = Annual total blackwater use across all water systems (kL/year)
* $$\text{Rainwater}\_{\text{total use,year}}$$ = Annual total rainwater use across all water systems (kL/year)
* $$\text{Stormwater}\_{\text{total use,year}}$$ = Annual total stormwater and off site water use across all water systems (kL/year)

Monthly water use

The 'Monthly water use' table presents the total water use across all system for each month of the year for the Reference and Proposed building (kL/year). This table is specific to projects targeting the Reducing Water Use criterion in all performance levels.

The total potable water use for the Reference and Proposed building (kL/year) is given by the following formula:

$$
\dot{V}*{\text{total,month}} = \sum*{\text{days in month}} \left\[ \dot{V}*{\text{total,day}} - \dot{V}*{\text{reclaimed,day}} \right]
$$

Where:

* $$\dot{V}\_{\text{total,month}}$$ = Potable water demand from all potable water uses for a given month (kL/month)
* $$\dot{V}\_{\text{total,day}}$$ = Potable water demand from all potable water uses for a given day (kL/day)
* $$\dot{V}\_{\text{reclaimed,day}}$$ = Reclaimed water use from all non potable water sources and across all systems for a given day (kL/day)

And:

$$
\begin{aligned}
\dot{V}*{\text{total,day}} = {} & \dot{V}*{\text{sanitation,day}} + \dot{V}*{\text{whitegoods,day}} + \dot{V}*{\text{heat rejection,day}} + \dot{V}*{\text{washdown,day}} \\
& + \dot{V}*{\text{landscape irrigation,day}} + \dot{V}*{\text{swimming pools,day}} + \dot{V}*{\text{fire protection systems,day}} \\
& + \dot{V}\_{\text{process cooling,day}}
\end{aligned}
$$

Where:

* $$\dot{V}\_{\text{sanitation,day}}$$ = Potable water demand from all sanitation fixtures and fittings for a given day (kL/day)
* $$\dot{V}\_{\text{whitegoods,day}}$$ = Potable water demand from dishwashers and washing machines for a given day (kL/day)
* $$\dot{V}\_{\text{heat rejection,day}}$$ = Potable water demand from heat rejection systems for a given day (kL/day)
* $$\dot{V}\_{\text{washdown,day}}$$ = Potable water demand from washdown for a given day (kL/day)
* $$\dot{V}\_{\text{landscape irrigation,day}}$$ = Potable water demand from landscape irrigation for a given day (kL/day)
* $$\dot{V}\_{\text{swimming pools,day}}$$ = Potable water demand from swimming pools or aquatic centre water use for a given day (kL/day)
* $$\dot{V}\_{\text{fire protection systems,day}}$$ = Potable water demand from fire protection systems for a given day (kL/day)
* $$\dot{V}\_{\text{process cooling,day}}$$ = Potable water demand from process cooling for a given day (kL/day)

And:

$$
\dot{V}*{\text{reclaimed,day}} = \text{Greywater}*{\text{total use,day}} + \text{Blackwater}*{\text{total use,day}} + \text{Rainwater}*{\text{total use,day}} + \text{Stormwater}\_{\text{total use,day}}
$$

Where:

* $$\text{Greywater}\_{\text{total use,day}}$$ = Total greywater use across all water systems for a given day (kL/day)
* $$\text{Blackwater}\_{\text{total use,day}}$$ = Total blackwater use across all water systems for a given day (kL/day)
* $$\text{Rainwater}\_{\text{total use,day}}$$ = Total rainwater use across all water systems for a given day (kL/day)
* $$\text{Stormwater}\_{\text{total use,day}}$$ = Total stormwater and off site water use across all water systems for a given day (kL/day)

Reduction in potable water use

The reduction in potable water use is determined by the following formula:

$$
\Delta \dot{V} = 1 - \left( \frac{\dot{V}*{\text{total,proposed}}}{\dot{V}*{\text{total,reference}}} \right)
$$

**Where:**

ΔV̇ = Reduction in potable water use (%)

V̇<sub>total,proposed</sub> = Annual potable water demand from all potable water uses for the *Proposed building* (kL/year)

V̇<sub>total,reference</sub> = Annual potable water demand from all potable water uses for the *Reference building* (kL/year)

**Domestic hot water and the&#x20;*****Energy Use calculator***

The Green Star Buildings v1 *Energy Use calculator* and Green Star Buildings v1.1 *Energy Use – Pathway A Reference building calculator* (referred to as the *Energy Use calculator* from here on) assesses reductions in energy consumption compared to a *Reference building*. More information about these calculators is available on the relevant Energy Use calculation guide on the Green Star resources portal.

The energy consumption associated with water heating for taps, showers, dishwashers and washing machines in the project (domestic hot water) is a required consideration for the modelling completed for the *Energy Use calculator*. The methodology that must be used to determine the energy consumption associated with domestic hot water is included in the *Energy Use calculation guide*. The methodology shows that reductions in energy use can be achieved by installing more efficient fittings and fixtures as well as installing a more efficient hot water system and/or a solar hot water system.

The domestic hot water demand figures that must be used are calculated and displayed in the *Water Use Calculator*. The calculator assumes that 50% of the water used in taps and showers in the *Proposed* and *Reference building* is hot water. The proportion of hot water used in washing machines and dishwashers is defined in accordance with the usage of the whitegoods' "normal" or default cycle which the project team should support with manufacturer's documentation.

The hot water consumption figures are displayed in the 'Results' tab of the *Water Use calculator*.

The domestic hot water use for the *Reference* and *Proposed building* is given by the following methodology:

V̇<sub>DHW,year</sub> = ((V̇<sub>taps,year</sub> + V̇<sub>occupant shower,year</sub> + V̇<sub>sports shower,year</sub>) × 0.5)&#x20;

\+&#x20;

(V̇<sub>WM,year</sub> × p<sub>DHW,WM</sub>) + (V̇<sub>DW,year</sub> × p<sub>DHW,DW</sub>)

**Where:**

V̇<sub>DHW,year</sub> = Annual domestic hot water demand (kL/year)

V̇<sub>taps,year</sub> = Annual water demand from indoor taps (kL/year)

V̇<sub>occupant shower,year</sub> = Annual water demand from occupant showers (kL/year)

V̇<sub>sport shower,year</sub> = Annual water demand from sport showers (kL/year)

V̇<sub>WM,year</sub> = Annual water demand from washing machines (kL/year)

V̇<sub>DW,year</sub> = Annual water demand from dishwashers (kL/year)

p<sub>DHW,WM</sub> = Proportion of water used in the washing machines that is domestic hot water (%)

p<sub>DHW,DW</sub> = Proportion of water used in the dishwashers that is domestic hot water (%)

#### Appendix C: Point potential evapotranspiration example

An example of monthly rainfall and point potential evapotranspiration are given below. This data is for the grid coordinates -37.87 (Latitude) and 145.26 (Longitude).

*Table 19: Sample point potential evapotranspiration data from the BoM for grid coordinates -37.87 (Latitude), 145.26 (Longitude)*

| Month      | Grid-point average data for point potential evapotranspiration (mm) |
| ---------- | ------------------------------------------------------------------- |
| January    | 190                                                                 |
| February   | 160                                                                 |
| March      | 135                                                                 |
| April      | 88                                                                  |
| May        | 47                                                                  |
| June       | 33                                                                  |
| July       | 38                                                                  |
| August     | 56                                                                  |
| September  | 82                                                                  |
| October    | 124                                                                 |
| November   | 147                                                                 |
| December   | 164                                                                 |
| **Annual** | **1264**                                                            |

#### Appendix D: BoM 10-year average rainfall data

*Table 20: BoM 10-year average rainfall data*

| Month     | Adelaide (2011 - 2020) | Brisbane (2011 - 2020) | Canberra (2011 - 2020) | Darwin (2010- 2019) | Hobart (2011 - 2020) | Mackay (2007- 2016) | Melbourne (2010-2019) | Perth (2011 - 2020) | Sydney (2011 - 2020) | Townsville (2010 - 2019) |
| --------- | ---------------------- | ---------------------- | ---------------------- | ------------------- | -------------------- | ------------------- | --------------------- | ------------------- | -------------------- | ------------------------ |
| January   | 21.3                   | 226.6                  | 56.5                   | 492.5               | 38.9                 | 276.5               | 40.2                  | 24.2                | 108.1                | 235.7                    |
| February  | 26.5                   | 180.5                  | 71.1                   | 422.7               | 28.4                 | 429.4               | 47.5                  | 16.1                | 134.9                | 295.9                    |
| March     | 27.3                   | 188.7                  | 72.1                   | 273.4               | 36.1                 | 377.6               | 38.2                  | 16.2                | 182.1                | 308.0                    |
| April     | 34.6                   | 60.8                   | 39.9                   | 113.8               | 35.8                 | 126.8               | 59.5                  | 28.5                | 132.3                | 49.2                     |
| May       | 57.7                   | 55.1                   | 31.0                   | 26.6                | 49.5                 | 85.3                | 51.9                  | 76.2                | 67.3                 | 32.2                     |
| June      | 59.1                   | 89.8                   | 54.6                   | 0.1                 | 44.0                 | 74.8                | 56.7                  | 104.2               | 196.5                | 21.5                     |
| July      | 67.4                   | 28.7                   | 34.1                   | 0.0                 | 38.5                 | 45.9                | 46.3                  | 121.6               | 82.9                 | 20.1                     |
| August    | 58.7                   | 32.3                   | 52.6                   | 0.3                 | 48.5                 | 24.0                | 50.6                  | 129.3               | 75.4                 | 13.4                     |
| September | 43.4                   | 25.7                   | 51.5                   | 16.6                | 40.9                 | 41.1                | 53.4                  | 79.0                | 62.0                 | 12.6                     |
| October   | 26.0                   | 83.4                   | 47.4                   | 75.3                | 45.9                 | 22.6                | 51.9                  | 30.0                | 58.8                 | 21.3                     |
| November  | 19.1                   | 75.4                   | 79.1                   | 167.7               | 48.9                 | 108.9               | 66.7                  | 29.7                | 88.8                 | 47.9                     |
| December  | 22.0                   | 103.6                  | 61.1                   | 236.8               | 51.5                 | 201.8               | 62.3                  | 15.4                | 77.3                 | 108.3                    |

#### Appendix E: Standard occupancy profiles

Standard occupancy profiles for each building class are taken from *National Construction Code (NCC) 2022 Volume One: Specification 35, Table S35C2b – S35C2k* and presented below.

*Table 21: Standard occupancy profiles included in the calculator – Part I*

| Time period                               | <p>Class 1 or 2 residential<br>Peak</p> | <p>Class 1 or 2 residential<br>Off-peak</p> | <p>Class 3 hotel (Table S35C2b)<br>Peak</p> | <p>Class 3 hotel (Table S35C2b)<br>Off-peak</p> | <p>Class 5 building, Class 7 warehouse, Class 8 Laboratory or Class 9a clinic, day surgery or procedure unit (Table S35C2c and S35C2d)<br>Peak</p> | <p>Class 5 building, Class 7 warehouse, Class 8 Laboratory or Class 9a clinic, day surgery or procedure unit (Table S35C2c and S35C2d)<br>Off-peak</p> | <p>Class 6 shop or shopping centre (Table S35C2e)<br>Peak</p> | <p>Class 6 shop or shopping centre (Table S35C2e)<br>Off-peak</p> | <p>Class 6 restaurant or café (Table S35C2f)<br>Peak</p> | <p>Class 6 restaurant or café (Table S35C2f)<br>Off-peak</p> |
| ----------------------------------------- | --------------------------------------- | ------------------------------------------- | ------------------------------------------- | ----------------------------------------------- | -------------------------------------------------------------------------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------ | ------------------------------------------------------------- | ----------------------------------------------------------------- | -------------------------------------------------------- | ------------------------------------------------------------ |
| 12:00am to 1:00am                         | 0%                                      | 0%                                          | 90%                                         | 90%                                             | 0%                                                                                                                                                 | 0%                                                                                                                                                     | 0%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| 1:00am to 2:00am                          | 0%                                      | 0%                                          | 90%                                         | 90%                                             | 0%                                                                                                                                                 | 0%                                                                                                                                                     | 0%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| 2:00am to 3:00am                          | 0%                                      | 0%                                          | 90%                                         | 90%                                             | 0%                                                                                                                                                 | 0%                                                                                                                                                     | 0%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| 3:00am to 4:00am                          | 0%                                      | 0%                                          | 90%                                         | 90%                                             | 0%                                                                                                                                                 | 0%                                                                                                                                                     | 0%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| 4:00am to 5:00am                          | 0%                                      | 0%                                          | 90%                                         | 90%                                             | 0%                                                                                                                                                 | 0%                                                                                                                                                     | 0%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| 5:00am to 6:00am                          | 0%                                      | 0%                                          | 80%                                         | 80%                                             | 0%                                                                                                                                                 | 0%                                                                                                                                                     | 0%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| 6:00am to 7:00am                          | 0%                                      | 0%                                          | 70%                                         | 70%                                             | 5%                                                                                                                                                 | 0%                                                                                                                                                     | 0%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| 7:00am to 8:00am                          | 85%                                     | 0%                                          | 60%                                         | 60%                                             | 5%                                                                                                                                                 | 0%                                                                                                                                                     | 10%                                                           | 0%                                                                | 10%                                                      | 0%                                                           |
| 8:00am to 9:00am                          | 50%                                     | 0%                                          | 60%                                         | 60%                                             | 5%                                                                                                                                                 | 0%                                                                                                                                                     | 20%                                                           | 5%                                                                | 20%                                                      | 0%                                                           |
| 9:00am to 10:00am                         | 20%                                     | 10%                                         | 30%                                         | 30%                                             | 5%                                                                                                                                                 | 0%                                                                                                                                                     | 70%                                                           | 5%                                                                | 20%                                                      | 0%                                                           |
| 10:00am to 11:00am                        | 20%                                     | 10%                                         | 10%                                         | 10%                                             | 20%                                                                                                                                                | 0%                                                                                                                                                     | 70%                                                           | 5%                                                                | 15%                                                      | 0%                                                           |
| 11:00am to 12:00pm                        | 20%                                     | 10%                                         | 10%                                         | 10%                                             | 50%                                                                                                                                                | 0%                                                                                                                                                     | 70%                                                           | 5%                                                                | 25%                                                      | 0%                                                           |
| 12:00pm to 1:00pm                         | 20%                                     | 10%                                         | 10%                                         | 10%                                             | 80%                                                                                                                                                | 0%                                                                                                                                                     | 70%                                                           | 5%                                                                | 25%                                                      | 0%                                                           |
| 1:00pm to 2:00pm                          | 20%                                     | 10%                                         | 10%                                         | 10%                                             | 70%                                                                                                                                                | 0%                                                                                                                                                     | 70%                                                           | 5%                                                                | 15%                                                      | 0%                                                           |
| 2:00pm to 3:00pm                          | 20%                                     | 10%                                         | 10%                                         | 10%                                             | 40%                                                                                                                                                | 0%                                                                                                                                                     | 70%                                                           | 5%                                                                | 15%                                                      | 0%                                                           |
| 3:00pm to 4:00pm                          | 30%                                     | 10%                                         | 10%                                         | 10%                                             | 20%                                                                                                                                                | 0%                                                                                                                                                     | 70%                                                           | 5%                                                                | 15%                                                      | 0%                                                           |
| 4:00pm to 5:00pm                          | 50%                                     | 50%                                         | 20%                                         | 20%                                             | 25%                                                                                                                                                | 0%                                                                                                                                                     | 70%                                                           | 5%                                                                | 15%                                                      | 0%                                                           |
| 5:00pm to 6:00pm                          | 50%                                     | 50%                                         | 30%                                         | 30%                                             | 50%                                                                                                                                                | 0%                                                                                                                                                     | 35%                                                           | 0%                                                                | 5%                                                       | 0%                                                           |
| 6:00pm to 7:00pm                          | 50%                                     | 70%                                         | 40%                                         | 40%                                             | 80%                                                                                                                                                | 0%                                                                                                                                                     | 10%                                                           | 0%                                                                | 5%                                                       | 0%                                                           |
| 7:00pm to 8:00pm                          | 70%                                     | 70%                                         | 50%                                         | 50%                                             | 80%                                                                                                                                                | 0%                                                                                                                                                     | 5%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| 8:00pm to 9:00pm                          | 80%                                     | 80%                                         | 60%                                         | 60%                                             | 80%                                                                                                                                                | 0%                                                                                                                                                     | 5%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| 9:00pm to 10:00pm                         | 80%                                     | 85%                                         | 70%                                         | 70%                                             | 50%                                                                                                                                                | 0%                                                                                                                                                     | 0%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| 10:00pm to 11:00pm                        | 0%                                      | 0%                                          | 70%                                         | 70%                                             | 35%                                                                                                                                                | 0%                                                                                                                                                     | 0%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| 11:00pm to 12:00am                        | 0%                                      | 0%                                          | 90%                                         | 90%                                             | 20%                                                                                                                                                | 0%                                                                                                                                                     | 0%                                                            | 0%                                                                | 0%                                                       | 0%                                                           |
| **Equivalent hours at maximum occupancy** | **6.65**                                | **4.75**                                    | **12.4**                                    | **12.4**                                        | **7.2**                                                                                                                                            | **0**                                                                                                                                                  | **6.45**                                                      | **0.45**                                                          | **1.85**                                                 | **0**                                                        |

*Table 22: Standard occupancy profiles included in the calculator – Part II*

| Time period                               | <p>Class 9a ward area (Table S35C2g)<br>Peak</p> | <p>Class 9a ward area (Table S35C2g)<br>Off-peak</p> | <p>Class 9b theatre or cinema (Table S35C2h)<br>Peak</p> | <p>Class 9b theatre or cinema (Table S35C2h)<br>Peak</p> | <p>Class 9b conference facility (Table S35C2i)<br>Peak</p> | <p>Class 9b conference facility (Table S35C2i)<br>Off-peak</p> | <p>Class 9b school (Table S35C2j)<br>Peak</p> | <p>Class 9b school (Table S35C2j)<br>Off-peak</p> | <p>Class 9c aged care facility (Table S35C2k)<br>Peak</p> | <p>Class 9c aged care facility (Table S35C2k)<br>Off-peak</p> |
| ----------------------------------------- | ------------------------------------------------ | ---------------------------------------------------- | -------------------------------------------------------- | -------------------------------------------------------- | ---------------------------------------------------------- | -------------------------------------------------------------- | --------------------------------------------- | ------------------------------------------------- | --------------------------------------------------------- | ------------------------------------------------------------- |
| 12:00am to 1:00am                         | 70%                                              | 70%                                                  | 0%                                                       | 0%                                                       | 0%                                                         | 0%                                                             | 0%                                            | 0%                                                | 85%                                                       | 85%                                                           |
| 1:00am to 2:00am                          | 70%                                              | 70%                                                  | 0%                                                       | 0%                                                       | 0%                                                         | 0%                                                             | 0%                                            | 0%                                                | 85%                                                       | 85%                                                           |
| 2:00am to 3:00am                          | 70%                                              | 70%                                                  | 0%                                                       | 0%                                                       | 0%                                                         | 0%                                                             | 0%                                            | 0%                                                | 85%                                                       | 85%                                                           |
| 3:00am to 4:00am                          | 70%                                              | 70%                                                  | 0%                                                       | 0%                                                       | 0%                                                         | 0%                                                             | 0%                                            | 0%                                                | 85%                                                       | 85%                                                           |
| 4:00am to 5:00am                          | 70%                                              | 70%                                                  | 0%                                                       | 0%                                                       | 0%                                                         | 0%                                                             | 0%                                            | 0%                                                | 85%                                                       | 85%                                                           |
| 5:00am to 6:00am                          | 70%                                              | 70%                                                  | 0%                                                       | 0%                                                       | 0%                                                         | 0%                                                             | 0%                                            | 0%                                                | 85%                                                       | 85%                                                           |
| 6:00am to 7:00am                          | 70%                                              | 70%                                                  | 0%                                                       | 0%                                                       | 5%                                                         | 5%                                                             | 0%                                            | 0%                                                | 85%                                                       | 85%                                                           |
| 7:00am to 8:00am                          | 70%                                              | 70%                                                  | 0%                                                       | 0%                                                       | 10%                                                        | 10%                                                            | 5%                                            | 0%                                                | 80%                                                       | 85%                                                           |
| 8:00am to 9:00am                          | 70%                                              | 70%                                                  | 0%                                                       | 20%                                                      | 20%                                                        | 20%                                                            | 75%                                           | 0%                                                | 50%                                                       | 50%                                                           |
| 9:00am to 10:00am                         | 70%                                              | 70%                                                  | 0%                                                       | 70%                                                      | 20%                                                        | 20%                                                            | 90%                                           | 0%                                                | 10%                                                       | 50%                                                           |
| 10:00am to 11:00am                        | 70%                                              | 70%                                                  | 0%                                                       | 70%                                                      | 25%                                                        | 25%                                                            | 90%                                           | 0%                                                | 10%                                                       | 20%                                                           |
| 11:00am to 12:00pm                        | 70%                                              | 70%                                                  | 0%                                                       | 70%                                                      | 30%                                                        | 30%                                                            | 90%                                           | 0%                                                | 10%                                                       | 20%                                                           |
| 12:00pm to 1:00pm                         | 70%                                              | 70%                                                  | 20%                                                      | 20%                                                      | 30%                                                        | 30%                                                            | 50%                                           | 0%                                                | 10%                                                       | 20%                                                           |
| 1:00pm to 2:00pm                          | 70%                                              | 70%                                                  | 70%                                                      | 70%                                                      | 35%                                                        | 35%                                                            | 50%                                           | 0%                                                | 10%                                                       | 20%                                                           |
| 2:00pm to 3:00pm                          | 70%                                              | 70%                                                  | 70%                                                      | 70%                                                      | 30%                                                        | 30%                                                            | 90%                                           | 0%                                                | 10%                                                       | 20%                                                           |
| 3:00pm to 4:00pm                          | 70%                                              | 70%                                                  | 70%                                                      | 70%                                                      | 30%                                                        | 30%                                                            | 70%                                           | 0%                                                | 10%                                                       | 30%                                                           |
| 4:00pm to 5:00pm                          | 70%                                              | 70%                                                  | 70%                                                      | 70%                                                      | 35%                                                        | 35%                                                            | 50%                                           | 0%                                                | 50%                                                       | 50%                                                           |
| 5:00pm to 6:00pm                          | 70%                                              | 70%                                                  | 20%                                                      | 20%                                                      | 25%                                                        | 25%                                                            | 20%                                           | 0%                                                | 50%                                                       | 50%                                                           |
| 6:00pm to 7:00pm                          | 70%                                              | 70%                                                  | 20%                                                      | 20%                                                      | 20%                                                        | 20%                                                            | 20%                                           | 0%                                                | 70%                                                       | 50%                                                           |
| 7:00pm to 8:00pm                          | 70%                                              | 70%                                                  | 70%                                                      | 70%                                                      | 15%                                                        | 15%                                                            | 20%                                           | 0%                                                | 70%                                                       | 70%                                                           |
| 8:00pm to 9:00pm                          | 70%                                              | 70%                                                  | 70%                                                      | 70%                                                      | 10%                                                        | 10%                                                            | 10%                                           | 0%                                                | 80%                                                       | 80%                                                           |
| 9:00pm to 10:00pm                         | 70%                                              | 70%                                                  | 70%                                                      | 70%                                                      | 10%                                                        | 10%                                                            | 5%                                            | 0%                                                | 85%                                                       | 80%                                                           |
| 10:00pm to 11:00pm                        | 70%                                              | 70%                                                  | 70%                                                      | 70%                                                      | 10%                                                        | 10%                                                            | 5%                                            | 0%                                                | 85%                                                       | 85%                                                           |
| 11:00pm to 12:00am                        | 70%                                              | 70%                                                  | 10%                                                      | 10%                                                      | 5%                                                         | 5%                                                             | 5%                                            | 0%                                                | 85%                                                       | 85%                                                           |
| **Equivalent hours at maximum occupancy** | **16.8**                                         | **16.8**                                             | **6.3**                                                  | **8.6**                                                  | **3.65**                                                   | **3.65**                                                       | **7.45**                                      | **0**                                             | **13.7**                                                  | **14.6**                                                      |

#### Appendix F: Crop coefficient (Kc)

The crop coefficient is an agronomic multiplier used to determine the water usage requirement for a particular plant type. The **area weighted average** crop coefficient for the zone should be entered into the calculator.

The table below provides crop coefficients based on the general plant type e.g. native trees, exotic trees, native shrubs etc. and the expected water use of that general plant type. Examples of specific plants that belong in the crop coefficient category are also provided. For plants that do not appear on the list, project teams should pick a plant category that most closely matches the plants in the zone, based on the examples provided. Where a crop coefficient cannot be determined, a Technical Clarification may be submitted to the GBCA.

*Table 23: Tree crop coefficient*

| 1. Trees                                              | Crop Coefficient     |
| ----------------------------------------------------- | -------------------- |
| **1.1 Native trees**                                  |                      |
| **1.1.1 Very Low Water Use**                          | **0.1**              |
| Banksia (Silver) (Banksia marginata)                  |                      |
| Eucalypt (Yellow Gum) (Eucalyptus leucoxylon)         |                      |
| Eucalyptus (Sugar Gum) (Eucalyptus cladocalyx)        |                      |
| Eucalyptus (Red Iron Bark) (Eucalyptus tricarpa)      |                      |
| She-Oak (Drooping) (Allocasurina verticillata)        |                      |
| Wattle (Cootamundra) (Acacia baileyana)               |                      |
| Willow leaf Hakea (Hakea salicifolia)                 |                      |
| **1.1.2 Low Water Use**                               | **0.25**             |
| Bottlebrush (Weeping) (Callistemon viminalis)         |                      |
| Melaleuca (Melaleuca stypheliodes)                    |                      |
| Oak (Silky) (Grevillea robusta)                       |                      |
| **1.1.3 Moderate Water Use**                          | **0.5**              |
| Ash (Mountain) (Eucalyptus regnans)                   |                      |
| Fig (Moreton Bay) (Ficus macrophylla)                 |                      |
| Cabbage Tree Palm (Livistonia australis)              |                      |
| Umbrella Tree (Schefflera actinophylla)               |                      |
| Lilly Pilly (Acmena Smithii)                          |                      |
| White Peppermint (Eucalyptus pulchella)               |                      |
| **1.1.4 High Water Use**                              | **0.7**              |
| None                                                  |                      |
| **1.2 Exotic trees**                                  | **Crop Coefficient** |
| **1.2.1 Low Water Use**                               | **0.35**             |
| Pear (Ornamental) (Pyrus calleryana                   |                      |
| Chinese Elm (Ulmus parvifolia)                        |                      |
| Crab Apple (Malus "plena")                            |                      |
| Crepe Myrtle (Lagerstroemia indica)                   |                      |
| Monterey Pine (Pinus radiata)                         |                      |
| **1.2.2 Moderate Water Use**                          | **0.6**              |
| Golden Ash (Fraxinus excelsior "Aurea")               |                      |
| Golden Poplar (Populus x canadensis "Serotina Aurea") |                      |
| Pin Oak (Quercus palustris)                           |                      |
| Pencil Pine (Cypressus sempervirens)                  |                      |
| Magnolia (Magnolia grandiflora)                       |                      |
| Jacaranda (Jacaranda mimosifolia)                     |                      |
| **1.2.3 High Water Use**                              | **0.85**             |
| Douglas Fir (Pseudotsuga menziesii)                   |                      |
| Paperbark Maple (Acer griseum)                        |                      |
| Maple (Japanese) (Acer palmatum)                      |                      |
| Rubber Plant (Ficus elastica)                         |                      |
| Silver birch (Betula pendula)                         |                      |

*Table 24: Shrub crop coefficient*

| 2. Shrubs                                                  | Crop Coefficient |
| ---------------------------------------------------------- | ---------------- |
| **2.1 Native shrubs**                                      |                  |
| **2.1.1 Low Water Use**                                    | **0.25**         |
| Banksia (Heath) (Banksia ericifolia)                       |                  |
| Bottlebrush (Splendens) (Callistemon citrinus "Splendens") |                  |
| Saltbush (Rhagnodia spinescens)                            |                  |
| White Correa (Correa alba)                                 |                  |
| **2.1.2 Moderate Water Use**                               | **0.5**          |
| Banksia (Swamp) (Banksia robur)                            |                  |
| Boronia (Red) (Boronia heterophylla)                       |                  |
| Flame Pea (Chorizema cordatum)                             |                  |
| Snowy Daisy Bush (Olearia lirata)                          |                  |
| Native Heath (Epacris impressa)                            |                  |
| **2.1.3 High Water Use**                                   | **0.7**          |
| Creamy Candles (Stackhousia monogyna)                      |                  |
| Birds Nest Fern (Asplenium australasicum)                  |                  |
| Soft Tree Fern (Dicksonia australis)                       |                  |
| Weeping Fig (Ficus benjamina)                              |                  |
| **2.2 Exotic shrubs**                                      |                  |
| **2.2.1 Low Water Use**                                    | **0.35**         |
| Abelia (Abelia x grandiflora)                              |                  |
| Oleander (Nerium oleander)                                 |                  |
| Euphorbia (Crown of Thorns) (Euphorbia milii)              |                  |
| Lantana (Lantana camara)                                   |                  |
| Sedum (Ice Plant) (Sedum spectabile)                       |                  |
| Yucca (Spanish Dagger) (Yucca gloriosa)                    |                  |
| Hebe                                                       | 0.35             |
| **2.2.2 Moderate Water Use**                               | **0.6**          |
| Camellia (Camellia sasanqua)                               |                  |
| Daphne (Winter) (Daphne odora)                             |                  |
| Japanese Honeysuckle (Lonicera japonica)                   |                  |
| Japanese Wisteria (Wisteria floribunda)                    |                  |
| Dogwood (Buddleia davidii)                                 |                  |
| Pittosporum (Diamond leaf) (Pittosporum rhombifolium)      |                  |
| Viburnum (Viburnum x burkerwoodii)                         |                  |
| Rose (Rosa spp)                                            |                  |
| Azalea                                                     |                  |
| **2.2.3 High Water Use**                                   | **0.85**         |
| Hibiscus (Scarlet Rose-mallow) (Hibiscus coccineus)        |                  |
| Hydrangea (Hydrangea x macrophylla)                        |                  |
| Rhododendron (Rhododendron hybrid)                         |                  |
| Gardenia                                                   |                  |

*Table 25: Climber crop coefficient*

| 3. Climbers                                       | Crop Coefficient |
| ------------------------------------------------- | ---------------- |
| **3.1 Native climbers**                           |                  |
| **3.1.1 Very Low Water Use**                      | **0.1**          |
| Clematis (Small Leaved) (Clematis microphylla)    |                  |
| Kennedia (Kennedia macrophylla)                   |                  |
| Native Sarsparilla (Hardenbergia violacea)        |                  |
| **3.1.2 Low Water Use**                           | **0.25**         |
| Pandorea (Bower of Beauty) (Pandorea jasminoides) |                  |
| **3.1.3 Medium Water Use**                        | **0.5**          |
| **3.2 Exotic climbers**                           |                  |
| **3.2.1 Very Low Water Use**                      | **0.25**         |
| Vine (Glory) (Vitis cultivar)                     |                  |
| **3.2.2 Low Water Use**                           | **0.35**         |
| Ornamental grape (Vitis vinifera)                 |                  |
| Star Jasmine (Trachelospermum jasminoides)        |                  |
| Wisteria (Chinese) (Wisteria sinensis)            |                  |
| **3.2.3 Medium Water Use**                        | **0.6**          |
| Banksia Rose (Rosa banksiae "Lutea")              |                  |
| Carolina Jasmine (Gelsemium sempervirens)         |                  |
| Virginia Creeper (Parthenocissus quinquefolia)    |                  |
| **3.2.4 High Water Use**                          | **0.85**         |
| None                                              |                  |

*Table 26: Grasses and ornamentals crop coefficients*

| 7. Turf                     | Crop Coefficient (Strong growth, Good condition) | Crop Coefficient (Vigorous growth, Lush condition) |
| --------------------------- | ------------------------------------------------ | -------------------------------------------------- |
| **7.1 Warm Season Grasses** | **0.6**                                          | **0.85**                                           |
| couch                       |                                                  |                                                    |
| kikuyu                      |                                                  |                                                    |
| buffalo                     |                                                  |                                                    |
| Zoysia                      |                                                  |                                                    |
| **7.2 Cool Season Grasses** | **0.85**                                         | **1**                                              |
| Kentucky blue               |                                                  |                                                    |
| Ryegrass                    |                                                  |                                                    |
| Tall Fescue                 |                                                  |                                                    |
| Bentgrass                   |                                                  |                                                    |
| **8. Ornamentals**          | **0.8**                                          | **0.95**                                           |

## Version control

| Version | Date       | Description                                                                                                                                              |
| ------- | ---------- | -------------------------------------------------------------------------------------------------------------------------------------------------------- |
| 1       | 31/08/2026 | Initial release for Green Star Buildings. This guidance has been adapted from the *Potable Water Calculator Guide* for *Green Star – Design & As Built*. |


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/calculation-guides/water-use-calculation-guide.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
