> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/categories-and-credits/healthy/10-or-clean-air.md).

# 10 | Clean Air

Points: 2

## <mark style="color:$primary;">Outcome</mark>

Pollutants entering the building are minimised, and a high level of outdoor air is provided to ensure levels of indoor pollutants are maintained at acceptable levels.

## <mark style="color:$primary;">Criteria</mark>

<mark style="color:$success;">**Minimum Expectation — Nil**</mark>

* [#id-10.0.1-ventilation-system-attributes](#id-10.0.1-ventilation-system-attributes "mention"): Levels of indoor pollutants are maintained at acceptable levels.
* [#id-10.0.2-provision-of-outdoor-air](#id-10.0.2-provision-of-outdoor-air "mention"): A high level of outdoor air is provided.
* [#id-10.0.3-exhaust-or-elimination-of-pollutants](#id-10.0.3-exhaust-or-elimination-of-pollutants "mention"): Pollutants entering the building are minimised.

<mark style="color:$success;">**Credit Achievement — 2 points**</mark>

In addition to the *Minimum Expectation*:

* [#id-10.1.1-ventilation-system-attributes](#id-10.1.1-ventilation-system-attributes "mention"): The building's ventilation systems allow for easy maintenance.
* [#id-10.1.2-provision-of-outdoor-air](#id-10.1.2-provision-of-outdoor-air "mention"): A high level of outdoor air is provided.

***

## <mark style="color:$primary;">Additional information</mark>

#### Stage implementation

Strategy | Brief | Concept | **Design** | **Tender** | **Construction** | **Handover** | **Use**

#### Synergies with other credits

* Amenity and Comfort
* Verification and Handover

#### Sustainable Development Goals

* **Goal 3:** Good Health and Wellbeing

#### Regularly occupied areas

This credit applies to all regularly occupied areas in the building – those continuously occupied or occupied for more than two hours (previously known as 'primary' and 'secondary' spaces) including living and sleeping areas in Class 2 and Class 3 units. Areas that are either transient or accessed intermittently such as corridors, storage, back of house or plant rooms can be excluded. Spaces can also be excluded if the use of the space (for example, a laboratory) justifies specific ventilation conditions – a Technical Question must be submitted to the GBCA for confirmation. Compliance is required to be demonstrated across at least 95% of the regularly occupied areas for this credit to be achieved.

***

## <mark style="color:$primary;">Requirements</mark>

### <mark style="color:$success;">Minimum Expectation</mark>

The project must comply with **all three** of the following criteria:

* Ventilation System Attributes
* Provision of Outdoor Air
* Exhaust or Elimination of Pollutants

#### 10.0.1 Ventilation System Attributes

#### *Separation from pollutants*

Non-residential building ventilation systems must be designed to comply with ASHRAE Standard 62.1:2013 or AS 1668:2012 (whichever is greater) regarding minimum separation distances between pollution sources and outdoor air intakes.

If using ASHRAE Standard 62.1:2013, compliance is to be demonstrated in accordance with the distances specified in Table 5.5.1 of the Standard. Analytical solutions are also acceptable by following the example provided within Appendix F of ASHRAE Standard 62.1: 2013.

Class 2 and Class 3 building ventilation systems must be designed to comply with the separation distances as outlined in the table below. The table below is based on the Australian Standards 1668.2:2012 (table 3.4) and applied in the same way.

<table data-search="false"><thead><tr><th>Airflow rate within the minimum distance (L/s)</th><th>Minimum separation distance from discharges to intakes, or natural ventilation opening of adjacent Sole Occupancy Unit, or site boundary (m)</th><th>Minimum separation distances from discharges to intakes, or natural ventilation opening within Sole Occupancy Unit (m)</th></tr></thead><tbody><tr><td>&#x3C;100 L/s</td><td>1</td><td>N/A</td></tr><tr><td>&#x3C;200 L/s</td><td>2</td><td>1</td></tr><tr><td>&#x3C;400 L/s</td><td>3</td><td>2</td></tr><tr><td>&#x3C;600 L/s</td><td>4</td><td>3</td></tr><tr><td>&#x3C;800 L/s</td><td>5</td><td>4</td></tr><tr><td>&#x3C;1000 L/s</td><td>6</td><td>5</td></tr><tr><td>≥1000 L/s</td><td>7</td><td>6</td></tr></tbody></table>

Diversity factors cannot be applied in meeting this credit.

#### *Cleaning ductwork*

All new and existing ductwork that serves the building must be cleaned prior to occupation in accordance with a recognised Standard. This includes all ductwork in the base building that serves the building from the air handling unit(s) to the supply vents. If no ductwork exists, these requirements are deemed to be met.

See *Guidance* for recognised Standards.

#### 10.0.2 Provision of Outdoor Air

There are three pathways projects can pursue to demonstrate compliance, as described below:

{% tabs %}
{% tab title="Comparison - non-residential buildings" %}

#### Comparison to Industry Standards – non-residential buildings

The building must provide a 50% improvement of outdoor air required by AS 1668.2:2012 to each space in the regularly occupied areas.\
\
To demonstrate compliance, the HVAC system must be clearly sized to accommodate the increased outdoor air rates. The project must use the design occupancy, where known, rather than the default occupancy when calculating the required rates.\
\
The default occupancy is to be determined by the project team – any assumptions made must be justified within the Submission. Where the occupant density is unknown, projects must utilise the occupancy rates prescribed within Table A1 Appendix A of AS 1668.2:2012.\
\
Demand controlled ventilation is acceptable for energy efficiency performance.
{% endtab %}

{% tab title="Comparison - Class 2 and Class 3 buildings" %}

#### Comparison to Industry Standards – Class 2 and Class 3 buildings

The regularly occupied areas must be provided with good access to outdoor air, appropriate for the activities and conditions by using one of the following options:

* Where ventilation is by mechanical means, the building must provide outdoor air as per AS1668.2:2012 for the default occupancy.
* Where ventilation is by natural means, the building must meet natural ventilation requirements as per AS1668.4:2012.
  {% endtab %}

{% tab title="Performance based approach" %}

#### Performance based approach

For this option, the system must be capable of providing enough outdoor air to maintain carbon dioxide (CO₂) levels at or less than 800ppm within each space in the regularly occupied areas at all times in the default occupancy period.\
\
The system must continuously measure the concentration of CO₂ within the breathing zone of each space during occupancy hours. The system must then adjust the amount of outdoor air to each space (up to the maximum design outdoor air quantity) to ensure that CO₂ levels are maintained below the stipulated ppm threshold.

\
**Zoning the system**\
CO₂ sensors shall be located so that they provide accurate representative readings of the CO₂ concentrations in occupied spaces. Project teams must provide detailed drawings and justification for the chosen locations of the CO₂ monitoring systems. CO₂ sensors must be located in each individually controlled supply air zone so that they provide accurate representative readings of the CO₂ concentrations in occupied spaces.

\
**Modifying the air quality threshold**\
If appropriate, the project may nominate alternative thresholds from ASHRAE 62.1:2013. The justification must be accompanied with documentation from a recognised Standard or peer reviewed research.
{% endtab %}
{% endtabs %}

#### 10.0.3 Exhaust or Elimination of Pollutants

It must be demonstrated that pollutants from printing and photocopying equipment, cooking processes and equipment are limited from the regularly occupied areas by either:

* Removing the source of pollutants
* Exhausting the pollutants directly to the outside.

For the first option, sources of pollutants, such as printing or photocopy equipment, kitchen stoves or vehicles, must be compliant with minimum emissions standards or not be present within the regularly occupied areas.

For the second option, specified sources of pollutants shall be exhausted directly to the outside of the project in accordance with a recognised Standard, and/or physically separated from occupants.

Project teams are required to justify how provision for Cold Shell spaces has been provided based on building class and anticipated use.

See *Guidance* for relevant Standards.

### <mark style="color:$success;">Credit Achievement</mark>

In addition to the *Minimum Expectation*, the project must comply with **both** of the following criteria:

* Ventilation Systems Attributes
* Provision of Outdoor Air

#### 10.1.1 Ventilation System Attributes

Any mechanical ventilation system within the building, whether existing or new, must provide adequate access to both sides of all moisture and debris-catching components for maintenance within the air distribution system.

Where it can be demonstrated that it is not possible to provide adequate access for cleaning and maintenance purposes \[for example, ducted split system fan coil units (DX split/VRF/VRV)], the following requirements apply:

* Design teams may provide access to the upstream side of fan coil units where the coils are protected by a filter rated at MERV 8 or higher and:
  * Provide heating only
  * Provide cooling only with the coil assembly no more than 4 rows deep
  * Provide dual heating/cooling with the coil assembly no more than 4 rows deep
* For fan coil units or air handling units located within a ceiling void, in addition to the above criteria, the project team must fully demonstrate safe access for cleaning and maintenance. This may include:
  * Access panels in unit / ductwork is in close proximity to the coil to be cleaned
  * Access panels in the ceiling below the unit is in close proximity to the unit / ductwork access panel
  * The upstream surface of the coil must be accessible within 1m of the ceiling panel

#### 10.1.2 Provision of Outdoor Air

{% tabs %}
{% tab title="Comparison – non-residential buildings" %}

#### Comparison to Industry Standards – non-residential buildings

The building must provide a 100% improvement of outdoor air required by AS 1668.2:2012 to each space in the regularly occupied areas.\
\
To demonstrate compliance, the HVAC system must be clearly sized to accommodate the increased outdoor air rates. The project must use the design occupancy, where known, rather than the default occupancy when calculating the required rates.\
\
The default occupancy is to be determined by the project team – any assumptions made must be justified within the Submission. Where the occupant density is unknown, projects must utilise the occupancy rates prescribed within Table A1 Appendix A of AS 1668.2:2012.\
\
Demand controlled ventilation is acceptable for energy efficiency performance.
{% endtab %}

{% tab title="Comparison - Class 2 and Class 3 buildings" %}

#### Comparison to Industry Standards – Class 2 and Class 3 buildings

The regularly occupied areas must be provided with good access to outdoor air, appropriate for the activities and conditions by using one of the following options:

* Where ventilation is by mechanical means, the building must provide a 50% improvement of outdoor air over AS1668.2:2012 for the default occupancy.
* Where ventilation is by natural means, an engineered natural ventilation system with a minimum equivalent ventilator area per bedroom and living space of at least 15,000mm², with a minimum total ventilator area of 40,000mm² per dwelling. Ventilators must be independent of any mechanical extract fans. Ventilators must be located at either:
  * Minimum of 1750mm above finished floor level where the dwelling has multiple exposed facades or less than 70% of equivalent area is located on the one façade
  * At both high (min 1750mm above finished floor level) and low (maximum 750mm below finished floor level) location where the dwelling has single exposed façade or more than 70% of equivalent area is located on the one façade
    {% endtab %}

{% tab title="Performance based approach" %}

#### Performance based approach

For this option, the system must be capable of providing enough outdoor air to maintain carbon dioxide (CO₂) levels at or less than 700ppm within each space in the regularly occupied areas at all times in the default occupancy period.\
\
The system must continuously measure the concentration of CO₂ within the breathing zone of each space during occupancy hours. The system must then adjust the amount of outdoor air to each space (up to the maximum design outdoor air quantity) to ensure that CO₂ levels are maintained below the stipulated ppm threshold.\
\
**Zoning the system**\
CO₂ sensors shall be located so that they provide accurate representative readings of the CO₂ concentrations in occupied spaces. Project teams must provide detailed drawings and justification for the chosen locations of the CO₂ monitoring systems. CO₂ sensors must be located in each individually controlled supply air zone so that they provide accurate representative readings of the CO₂ concentrations in occupied spaces.\
\
**Modifying the air quality threshold**\
If appropriate, the project may nominate alternative thresholds from ASHRAE 62.1:2013. The justification must be accompanied with documentation from a recognised Standard or peer reviewed research.
{% endtab %}
{% endtabs %}

***

## <mark style="color:$primary;">Alternative pathways</mark>&#x20;

Where there are alternative pathways that a project can follow to achieve the credit, or sector specific alternatives.&#x20;

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Alternative pathways</summary>

#### <mark style="color:$primary;">**Green Star Buildings - Apartments Pathway**</mark>

{% hint style="info" %}
Please note that if this pathway is chosen, all credits that have an Apartments pathway must be followed. For more detail on what this includes, please navigate to<mark style="color:$success;">:</mark> [Apartments Pathway](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/categories-and-credits/apartments-pathway.md)
{% endhint %}

**Minimum Expectation — Nil:** Residential-specific criteria across each unit and at least 95% of regularly occupied areas:

* **Ventilation system attributes** — separation distances (AS 1668.2:2012 Table 3.4, no diversity factors), ductwork cleaned before occupation, and wet areas exhausted outside.
* **Provision of outdoor air** — via a 50% improvement on AS 1668.2:2012, compliance with AS 1668.2/1668.4 for Class 2/3 buildings, or a performance approach holding CO₂ at or below 800 ppm.
* **Exhaust or elimination of pollutants** — cooking and bathroom pollutants exhausted directly outside or physically separated from occupants.

Full requirements: [A10 | Clean Air](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/categories-and-credits/apartments-pathway/categories-and-credits/healthy/a10-or-clean-air.md)

</details>

***

## <mark style="color:$primary;">Clarifications</mark>

Where GBCA have clarified any requirements of the credit criteria. This information is additional and it is not complusory to apply.

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Clarifications</summary>

Existing FAQs are currently located [*here*](https://www.gbca.org.au/greenstar-manager/faqs/). GBCA are working on bringing them across to this site. New FAQs will be published here under the relevant credit and type.

</details>

***

## <mark style="color:$primary;">Submission content</mark>

#### Submissions for this credit must contain:

* **Submission form** through Green Star Online
* **Evidence** to support claims made in the submission

#### Recommended evidence:

* Mechanical drawings for each ventilated space
* For naturally ventilated buildings, provide drawings of openings and opening schedule.
* Extract from the ventilation system specification for each system
* Extracts from the Environmental Management Plan that specify ventilation cleaning
* Extract from the Commissioning Report demonstrating that the HVAC and CO₂ monitoring systems are operating as intended. For naturally ventilated areas, this is only relevant where automation systems and the like are included.

Alternate documentation can also be used by project teams to demonstrate compliance.

Refer to the [Guidance for Submitting for Designed Assessments](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/other-useful-resources/guidance-for-submitting-for-designed-assessments.md) for further information on submitting evidence for the Designed assessment.

The key requirement is that evidence is provided to support each claim made within the Submission form.

***

## <mark style="color:$primary;">Guidance</mark>

**Engineered natural ventilation solution**\
Project teams wanting to use alternative engineered natural ventilation solutions such as MVHR systems to demonstrate compliance with the Comparison to Industry Standards – Class 2 and Class 3 buildings Credit Achievement pathway should submit a Technical Question.

**Outdoor air intakes**\
All openable windows, doors, openings, vents, grilles, and skylights are considered outdoor air intakes for purposes of this credit and must be considered in the demonstration of compliance.

**Relevant standards**\
Standards for the 'Ventilation System Attributes' criterion include:

* AIRAH HVAC 2010 Hygiene Best Practice Guideline.
* ASHRAE Standard 62.1:2013, Section 5.
* ACR 2006 Assessment, Cleaning and Restoration of HVAC Systems.
* SMACNA IAQ Guidelines for Occupied Buildings under Construction.

Standards for the 'Provision of Outdoor Air' criterion include:

* AS1668.2:2012 The use of ventilation and air-conditioning in buildings - Mechanical Ventilation in buildings.
* AS1668.4:2012 The use of ventilation and air-conditioning in buildings - Natural Ventilation of buildings.
* ASHRAE 62.1:2013 Ventilation for Acceptable Indoor Air Quality.

Standards for the 'Exhaust or Elimination of Pollutants' criterion include:

* AS1668.2:2012 The use of ventilation and air-conditioning in buildings – Mechanical Ventilation in buildings.
* AS1668.4:2012 The use of ventilation and air-conditioning in buildings - Natural Ventilation of buildings.
* RAL UZ 171:2012 Basic Criteria for Award of The Environmental Label - Office Equipment with Printing Functions (Printers, Copiers, Multifunction Devices).
* ECMA-328 Determination of Chemical Emission Rates from Electronic Equipment.
* GGPS.003 Greenguard Indoor air Quality (IAQ) Standard for Office Equipment (Hardcopy Devices).

**Separation from pollutants for Class 2 and Class 3 buildings**\
The separation from pollutants for Class 2 and Class 3 buildings table is an increase above the Australian Standard, AS 1668.2:2012 (Table 3.4). The ASHRAE 62.1-2013 (Table 5.5.1) standard is considered too stringent, and thus not appropriate for local Class 2 and Class 3 building context. The minimum separation distances requirements for Class 2 and Class 3 buildings provides appropriate targets between Australian Standards and ASHRAE.

**Tenant spaces – Ventilation System Attributes**\
Tenant Supplementary Systems, such as water cooled package units serving meeting rooms or communications rooms, where the design, maintenance and ownership are determined and controlled by the Tenant can be excluded. For further guidance regarding tenant supplemental units, refer to the NABERS protocol for determining base building and tenant allocation. Where NABERS assesses a system as a tenant load, these systems can be excluded from the credit, where NABERS assesses a system as base building, these systems must be shown to be compliant for the credit to be awarded. Systems which are excluded for the purposes of a NABERS base building rating may also be excluded for this credit. Refer to Section 6.1.5.2 of the NABERS Energy & Water for Offices Rules Version 3.2 – October 2018. These rules can be applied for building types other than Class 3. All base building systems installed must comply with credit criteria 9.1.3.

In addition, where the expected base building design, as described in the Building User Guide or Tenancy Fitout Guide requires the installation of moisture or debris generating components (for example chilled beams, fan coil units or heating coils within VAV boxes) this credit cannot be claimed.

**Tenant spaces – Provision of Outdoor air**\
Project teams to demonstrate compliance with credit based on intended occupancy rate. Where the occupancy rate is different to Part D of the BCA, the design team shall demonstrate the basis for the occupancy rate.

**Tenant spaces – Exhaust or Elimination of Pollutants**\
Project teams are required to demonstrate provision for Cold Shell spaces has been provided based on building class.

***

## <mark style="color:$primary;">Supporting information</mark>

The following resources supporting this credit:

* AS 1668.2:2012
* ASHRAE Standard 62.1:2013
* AIRAH HVAC 2010 Hygiene Best Practice Guideline
* SMACNA IAQ Guidelines for Occupied Buildings under Construction.


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/categories-and-credits/healthy/10-or-clean-air.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.