> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/categories-and-credits/nature/39-or-waterway-protection.md).

# 39 | Waterway Protection

## <mark style="color:$primary;">Outcome</mark>

Local waterways are protected, and the impacts of flooding and drought are reduced.

## <mark style="color:$primary;">Criteria</mark>

<mark style="color:$success;">**Credit Achievement — 2 points**</mark>

* [#id-39.1.1-stormwater-volume](#id-39.1.1-stormwater-volume "mention"): The project demonstrates a reduction in average annual stormwater discharge (ML/yr) of 40% across the whole site.
* [#id-39.1.2-pollution-reduction-targets](#id-39.1.2-pollution-reduction-targets "mention"): Specified pollution reduction targets are met.

<mark style="color:$success;">**Exceptional Performance — 2 points**</mark>

In conjunction with the Credit Achievement:

* [#id-39.2.1-stormwater-volume](#id-39.2.1-stormwater-volume "mention"): The project demonstrates a reduction in average annual stormwater discharge (ML/yr) of 80% across the whole site.
* [#id-39.2.2-pollution-reduction-targets](#id-39.2.2-pollution-reduction-targets "mention"): Specified pollution reduction targets are met.

***

## <mark style="color:$primary;">Additional information</mark>

#### Stage implementation

Strategy | Brief | **Concept** | **Design** | Tender | **Construction** | **Handover** | Use

#### Synergies with other credits

* Nature Connectivity
* Biodiversity Enhancement
* Water Use
* Climate Change Resilience
* Operations Resilience

#### Sustainable Development Goals

* **Goal 13:** Climate Action
* **Goal 14:** Life Below Water

#### Relevant reporting initiatives

* GRESB

***

## <mark style="color:$primary;">Requirements</mark>

### <mark style="color:$success;">Credit Achievement</mark>

The project must comply with **both** of the following criteria:

* Stormwater Volume
* Pollution Reduction Targets

#### 39.1.1 Stormwater Volume

The project must demonstrate a reduction in average annual stormwater discharge (ML/yr) of 40% across the whole site.

The project team must provide a plan documenting how appropriate evaluation, monitoring, and maintenance of stormwater control measures (and associated reporting of their condition) will be undertaken to enhance their design stormwater treatment function.

#### 39.1.2 Pollution Reduction Targets

All stormwater discharged from site meets specified pollution reduction targets listed in the table below.

<table><thead><tr><th width="179.5">Pollutant</th><th>Reduction Target (% of the post development annual average load)</th></tr></thead><tbody><tr><td>Total Suspended Solids (TSS)¹</td><td>85%</td></tr><tr><td>Gross Pollutants</td><td>90%</td></tr><tr><td>Total Nitrogen (TN)²</td><td>45%</td></tr><tr><td>Total Phosphorus (TP)²</td><td>65%</td></tr><tr><td>Environmental Management</td><td><p>Minimise the risk of chemical pollutants and other toxicants entering the stormwater system, including by, but not limited to:</p><ul><li>Chemical storage, loading, refuelling or work areas must install bunding, with any spills draining to trade waste or appropriate treatment devices. These areas must have an awning or roofing to separately divert rainfall into the stormwater system.</li><li>If a site has more than 200m² of uncovered areas where vehicles are likely to transit and/or park, then hydrocarbon treatment devices must be installed, specified to remove at least 98% of hydrocarbons, sized to treat a 1-in-3 month ARI (4EY) flow. Electric vehicle only parking areas do not count towards the total.</li></ul></td></tr></tbody></table>

\*\*Load based on the following particulate size distribution (by mass): 20% <20 μm; 20% 20-60 μm; 20% 60-150 μm; 20% 150-400 μm; 20% 400-2000 μm.

\*\*\*Load includes particulate and dissolved fraction.

### <mark style="color:$success;">Exceptional Performance</mark>

In conjunction with the *Credit Achievement*, the project must comply with **both** of the following criteria:

* Stormwater Volume
* Pollution Reduction Targets

#### 39.2.1 Stormwater Volume

The project must demonstrate a reduction in average annual stormwater discharge (ML/yr) of 80% across the whole site.

See *Credit Achievement* requirements for further information.

#### 39.2.2 Pollution Reduction Targets

All stormwater discharged from site meets specified pollution reduction targets listed in the table below.

<table><thead><tr><th width="295">Pollutant</th><th>Reduction Target (% of the post development annual average load)</th></tr></thead><tbody><tr><td>Total Suspended Solids (TSS)**</td><td>90%</td></tr><tr><td>Gross Pollutants</td><td>95%</td></tr><tr><td>Total Nitrogen (TN)***</td><td>60%</td></tr><tr><td>Total Phosphorus (TP)***</td><td>70%</td></tr><tr><td>Environmental Management</td><td>See <em>Credit Achievement</em> requirements for further information.</td></tr></tbody></table>

\*\*Load based on the following particulate size distribution (by mass): 20% <20 μm; 20% 20-60 μm; 20% 60-150 μm; 20% 150-400 μm; 20% 400-2000 μm.

\*\*\*Load includes particulate and dissolved fraction.

***

## <mark style="color:$primary;">Alternative pathways</mark>&#x20;

Where there are alternative pathways that a project can follow to achieve the credit, or sector specific alternatives.&#x20;

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Alternative pathways</summary>

Existing FAQs are currently located [*here*](https://www.gbca.org.au/greenstar-manager/faqs/). GBCA are working on bringing them across to this site. New FAQs will be published here under the relevant credit and type.

</details>

***

## <mark style="color:$primary;">Clarifications</mark>

Where GBCA have clarified any requirements of the credit criteria. This information is additional and it is not complusory to apply.

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Clarifications</summary>

Existing FAQs are currently located [*here*](https://www.gbca.org.au/greenstar-manager/faqs/). GBCA are working on bringing them across to this site. New FAQs will be published here under the relevant credit and type.

</details>

***

## <mark style="color:$primary;">Submission content</mark>

#### Submissions for this credit must contain:

* **Submission form** through Green Star Online
* **Evidence** to support claims made in the submission

#### Recommended evidence:

**Stormwater volume**

* Calculation/Modelling Report by a suitably qualified professional. The report should describe:
  * Civil and Landscape drawings showing the stormwater collection, storage and treatment facilities and detailing their functional elements
  * Hydraulics drawings showing all the capture, storage, re-use piping and discharge route
  * Site plans showing the total areas of uncovered areas where vehicles are likely to transit and/or park (e.g., roads, loading docks, refuelling bays, and car parking, etc)

**Pollution Reduction Targets**

* Civil/Hydraulics/Landscape drawings showing the stormwater collection, storage, infiltration, and treatment facilities and detailing their functional elements
* Independently verified performance certification for each manufactured stormwater treatment device, proving its ability to achieve the pollution reduction targets.

Alternate documentation can also be used by project teams to demonstrate compliance.

Refer to the [Guidance for Submitting for Designed Assessments](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/other-useful-resources/guidance-for-submitting-for-designed-assessments.md) for further information on submitting evidence for the Designed assessment.

The key requirement is that evidence is provided to support each claim made within the Submission form.

***

## <mark style="color:$primary;">Guidance</mark>

**On-site detention (OSD) and flood control**\
This credit focuses on protecting downstream ecosystems. The aim of the volume reduction is to reduce hydrologic and flooding impacts on downstream ecosystems.

The drainage system design must also consider flood control considerations including minor (nuisance) and major (catastrophic overland flow) systems.

For some sites, local drainage authorities may require limitation of post-development peak event discharge from the site. This is commonly called On Site Detention (OSD). OSD is not an integrated water management solution for Green Star purposes, but relevant local requirements should also be integrated and included in the design and submission documentation for consistency and buildability.

**Typical urban annual load**\
Typical urban annual load reductions can be estimated using continuous simulation modelling software such as MUSIC, SWMM, XPSWMM, or InSite. Where available, relevant guideline values for pollutant concentrations for the catchment land use and surface type should be used. In areas where there are no specific guidelines, reference can be made to sources such as Australian Runoff Quality (ARQ, 2006).

**Water sensitive urban design**\
Water-sensitive urban design (WSUD) is a land planning and engineering design approach which integrates the urban water cycle, including stormwater, groundwater and wastewater management and water supply, into urban design to minimise environmental degradation and improve aesthetic and recreational appeal. This is also sometimes called Integrated Water Management (IWM).

**Pre-determined infrastructure**\
It is noted that some local governments may provide pre-determined infrastructure solutions that are 'deemed to comply' with the aim of this credit criterion. Some sites may also be 'not applicable' for the volume control target if for example they are in an area of downstream stormwater harvesting and wish to maximise stormwater from the site. If this is the case the project team should submit a Technical Question to have this approach approved.

**Climate scenarios**\
If the project is targeting the Climate Change Resilience credit, the Risk Assessment included in this credit submission should be used to determine the appropriate climate change scenario. If the project is not targeting the Climate change resilience credit, the project may refer to local council flood level guidance.

**Modelling**\
Pollutant export modelling using computer programs such as MUSIC, STORM etc. predict the discharge pollutant loads for the total site area. The results of the simulation must show a comparison against the relevant reduction targets for offsite reductions.

**Reduction in average annual stormwater discharge**\
A reduction in average annual stormwater discharge refers to the average annual reduction in stormwater volume discharged from the development, with treatment, compared with the stormwater volume that would be discharged without treatment.

The volume reduction must be achieved through a combination of evaporation, transpiration, harvesting and retention, pervious paving, and other Water Sensitive Urban Design practices.

**Reduction in average annual stormwater pollutant loads**\
A reduction in average annual stormwater pollutant loads refers to the average annual reduction in stormwater pollutant loads discharged from the development, with treatment, compared with the stormwater pollutant loads that would be discharged without treatment.

The pollutant reduction must be achieved through appropriate Water Sensitive Urban Design practices.

***

## <mark style="color:$primary;">Supporting information</mark>

The following resource(s) are referenced in this credit:

* Australian Rainfall & Runoff, Engineers Australia (2019), Commonwealth of Australia (Geoscience Australia) 2019
* Australian Runoff Quality (ARQ, 2006)
* Model for Urban Stormwater Improvement Conceptualisation (MUSIC) model (CRCCH, 2005)
* STORM computer modelling program
* WSUD Engineering Procedures – Stormwater (CSIRO, 2005)
* EPA Victoria: Draft urban stormwater management guidance (Publication 1739, October 2020)


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/categories-and-credits/nature/39-or-waterway-protection.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.