> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/categories-and-credits/resilient/16-or-climate-change-resilience.md).

# 16 | Climate Change Resilience

Points: 1

## <mark style="color:$primary;">Outcome</mark>

The building has been built to respond to the direct and indirect impacts of climate change.

## <mark style="color:$primary;">Criteria</mark>

<mark style="color:$success;">**Minimum Expectation — Nil**</mark>

* [#id-16.0.1-climate-change-pre-screening-checklist](#id-16.0.1-climate-change-pre-screening-checklist "mention"): The project team completes the climate change pre-screening checklist. The project team communicates the building's exposure to climate change risks to the applicant.

<mark style="color:$success;">**Credit Achievement — 1 point**</mark>

In addition to the *Minimum Expectation*:

* [#id-16.1.1-climate-change-risk-and-adaptation-assessment](#id-16.1.1-climate-change-risk-and-adaptation-assessment "mention"): The project team develops a project-specific climate change risk and adaptation assessment for the building.
* [#id-16.1.2-managing-risks](#id-16.1.2-managing-risks "mention"): Extreme and high risks are addressed.

***

## <mark style="color:$primary;">Additional information</mark>

#### Stage implementation

**Strategy** | **Brief** | **Concept** | **Design** | Tender | Construction | Handover | Use

#### Synergies with other credits

* Energy Use
* Lifecycle Impacts
* Operations Resilience
* Community Resilience
* Contribution to Place
* Impacts to Nature

#### Sustainable Development Goals

* **Goal 11:** Sustainable Cities
* **Goal 13:** Climate Action

#### Relevant reporting initiatives

* GRESB
* Task Force on Climate-related Financial Disclosures **(TCFD)**

***

## <mark style="color:$primary;">Requirements</mark>

### <mark style="color:$success;">Minimum Expectation</mark>

The project must comply with the following criteria:

* Climate Change Pre-screening Checklist

#### 16.0.1 Climate Change Pre-screening Checklist

Project team members must consider potential impacts from climate change when completing the checklist in the submission form including, but not limited to:

* Direct damage or failure of project components
* Accelerated deterioration of project components or reduced design life
* Reduced operating capacity
* Climate hazard impacts to surrounding areas (e.g., impacting access and egress)
* Impacts to the health and wellbeing of building occupants and other relevant stakeholders
* Indirect risks from impacts to other interdependent systems and services (e.g., transport networks, power, water, telecommunications)

Both historic and future data must be used when completing the checklist. All sections must be completed. The Minimum Expectation is achieved on completion of the checklist and doesn't require identified risks to be treated.

The checklist must be signed off by a member of the project leadership team and shared with key project stakeholders, including the client/building owner.

If the *Credit Achievement* for this credit is met, requirements of this assessment are considered to have been met.

### <mark style="color:$success;">Credit Achievement</mark>

In addition to the *Minimum Expectation*, the project must comply with **both** of the following criteria:

* Climate Change Risk and Adaptation Assessment
* Managing Risks

#### 16.1.1 Climate Change Risk and Adaptation Assessment

A suitably qualified professional must undertake a climate change risk and adaptation assessment and author a report. The suitably qualified professional must:

* Perform the assessment using the information from the Intergovernmental Panel on Climate Change (IPCC) Fifth Assessment Report Representative Concentration Pathway 8.5 (RCP 8.5) or most recently published version
* Perform the assessment using two timescales that are relevant to the project's anticipated lifespan: one medium-term timescale between 2040 to 2050 one long-term timescale between 2070 to 2090
* Identify the primary and secondary climate change variables from Table 2 in AS5334:2013 Climate change adaptation for settlements and infrastructure relevant to the project and each risk
* Define and include the consequence and likelihood tables and risk matrix used to assess climate risks
* Assess risks in consultation with multidisciplinary representatives from within the project team and a selection of relevant external stakeholders
* Develop a register of risks to the building and surrounding infrastructure, and provide treatment options for risks identified as 'extreme' or 'high'
* Communicate the results of the assessment to the leads of all design disciplines

The author must ensure the assessment:

* Aligns with the Australian Standard AS 5334:2013 Climate change adaptation for settlements and infrastructure
* Follows the principles of risk management outlined in the Australian and New Zealand Standard AS/NZ ISO 31000:2009 Risk Management.

#### 16.1.2 Managing Risks

The project team must ensure risks are addressed as follows:

* All risks rated as 'Extreme' must be addressed through specific design responses
* All risks rated as 'High' must be addressed through design or future operational responses
* Regardless of risk rating, at least two risks identified in the assessment must be addressed by specific design responses.

***

## <mark style="color:$primary;">Alternative pathways</mark>&#x20;

Where there are alternative pathways that a project can follow to achieve the credit, or sector specific alternatives.&#x20;

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Alternative pathways</summary>

Existing FAQs are currently located [*here*](https://www.gbca.org.au/greenstar-manager/faqs/). GBCA are working on bringing them across to this site. New FAQs will be published here under the relevant credit and type.

</details>

***

## <mark style="color:$primary;">Clarifications</mark>

Where GBCA have clarified any requirements of the credit criteria. This information is additional and it is not complusory to apply.

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Clarifications</summary>

Existing FAQs are currently located [*here*](https://www.gbca.org.au/greenstar-manager/faqs/). GBCA are working on bringing them across to this site. New FAQs will be published here under the relevant credit and type.

</details>

***

## <mark style="color:$primary;">Submission content</mark>

#### Submissions for this credit must contain:

* **Submission form** through Green Star Online
* **Evidence** to support claims made in the submission

#### Recommended evidence:

* Climate change risk assessment
* Risk assessment criteria, including the likelihood and consequence tables, risk matrix, RCP and timescale, and any assumptions significant in the development of the assessment
* Details of the adaptation responses
* Evidence the assessment was communicated to design leads
* Project risk register, highlighting the 'high' or 'extreme' identified climate change risks

Alternate documentation can also be used by project teams to demonstrate compliance.

Refer to the [Guidance for Submitting for Designed Assessments](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/other-useful-resources/guidance-for-submitting-for-designed-assessments.md) for further information on submitting evidence for the Designed assessment.

The key requirement is that evidence is provided to support each claim made within the Submission form.

***

## <mark style="color:$primary;">Guidance</mark>

**Staging**\
The Climate Change Resilience risk assessment should be undertaken as early during the project's design phase as possible, such as in the concept or schematic design phase, to allow maximum benefit and opportunity to inform design decisions and implement appropriate and meaningful adaptation responses.

**Risk assessment**\
Priority should be given to corporate enterprise risk management or project-specific risk assessment criteria to enable climate change risks to be incorporated into the project's broader risk management processes.

**Relevant external stakeholders**\
Examples of relevant external stakeholders include known tenants, government officials, emergency services, and utilities, or as determined by the Suitably Qualified Professional.

**Internal consistency**\
Care should be taken when adapting multiple variables in the climate change risk assessment to ensure the scenarios are internally consistent, and not necessarily looking at the worst-case individual climate variables and simply combining them together. Some combinations of variables may not be simulated by climate models (e.g., a higher temperature scenario may always be associated with being wetter for a location, so designing to a worst case (highest) temperature with worst case (lowest) rainfall would be inconsistent as it represents an improbable future).

The [climatechangeinaustralia.gov.au](https://climatechangeinaustralia.gov.au/en/) website has publicly accessible tools to check for consistency and regional prediction data.

**Base building vs tenant scope**\
By undertaking the climate change risk and adaptation assessment during project design, opportunities to incorporate adaptation responses in the base building can be maximised, thereby improving the resilience of the building for tenant use. Additional non-physical adaptation responses, including emergency management plans and information on how to cope during extreme climate events, should be communicated to tenants and used to inform relevant tenant agreements (e.g., agreements with tenants to mandate use of blinds and shading to reduce thermal load, reduce energy consumption and reuse water to reduce reliance on mains supply).

**Review process**\
The assessment should be reviewed and updated whenever the climate change science that informs the scenarios for assessment is updated.

***

## <mark style="color:$primary;">Definitions</mark>

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#suitably-qualified-professional)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#climate-change-variable)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#assessment)

***

## <mark style="color:$primary;">Supporting information</mark>

The following resources support this credit:

* AS 5334:2013 Climate change adaptation for settlements and infrastructure
* AS/NZ ISO 31000:2009 Risk Management
* IPCC Fifth Assessment Report (AR5)
* Climate Change Checklist


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/categories-and-credits/resilient/16-or-climate-change-resilience.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.