> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/categories-and-credits/responsible/4-or-responsible-resource-management.md).

# 4 | Responsible Resource Management

Points: Nil. This is a Minimum Expectation

## <mark style="color:$primary;">Outcome</mark>

Operational waste and resources can be separated and recovered in a safe and efficient manner.

## <mark style="color:$primary;">Criteria</mark>

<mark style="color:$success;">**Minimum Expectation — Nil**</mark>

* [#id-4.0.1-collection-of-waste-streams](#id-4.0.1-collection-of-waste-streams "mention")**:** The building is designed for the collection of separate waste and resource streams.
* [#id-4.0.2-dedicated-waste-storage-area](#id-4.0.2-dedicated-waste-storage-area "mention")**:** The building provides a dedicated and adequately sized waste and resource storage area.
* [#id-4.0.3-signoff-by-waste-specialist-and-or-contractor](#id-4.0.3-signoff-by-waste-specialist-and-or-contractor "mention")**:** The building ensures safe and efficient access to waste and resource storage areas for both occupants and waste and resource collection contractors.

***

## <mark style="color:$primary;">Additional information</mark>

#### Stage implementation

Strategy | Brief | Concept | **Design** | Tender | Construction | **Handover** | **Use**

#### Synergies with other credits

* None

#### Sustainable Development Goals

* **Goal 11:** Sustainable Cities
* **Goal 12:**  Responsible Consumption and Production
* **Goal 13:** Climate Action

***

## <mark style="color:$primary;">Requirements</mark>

### <mark style="color:$success;">Minimum Expectation</mark>

The project must comply with **all three** of the following criteria

* Collection of Waste Streams
* Dedicated Waste Storage Area
* Sign-off by Waste Specialist and/or Contractor

#### 4.0.1 Collection of Waste Streams

The building must provide bins or storage containers to building occupants to enable them to separate their waste. These bins must be labelled and easy to access, and evenly distributed throughout the building. They must also allow for separating the following as a minimum:

* General waste going to landfill
* Recycling streams to be collected by the building's waste collection service, including:
  * paper and cardboard
  * glass
  * plastic
* One additional waste stream identified by the project team. This may include collecting any of the following waste types: organics, e-waste, batteries etc.

Any other single waste stream (except food waste) that is expected to represent more than 5% of total annual operational waste and resources (by volume) must also be included.

Refer guidance section for further information about comingled collection.

#### 4.0.2 Dedicated Waste Storage Area

A dedicated area, or areas, for the storage and collection of the applicable waste streams must be provided. The storage area must be sized to accommodate all bins or containers, for all applicable waste streams, for at least one collection cycle. The calculations used to demonstrate that the area provided is adequately sized to handle the recyclable waste streams specified must be based on:

* Forecasted waste generated by occupants
* Collection frequency for each waste stream

The calculations for waste generation rates must be based on figures outlined within third-party best practice guidelines. See *Guidance* for more information.

The storage area(s) must have efficient and safe access by collection vehicles. This includes driveway access to the building, appropriate height clearances, any onsite roads and loading docks, and the storage areas themselves providing safe and easy access for bins to be emptied into collection vehicles.

#### 4.0.3 Signoff by Waste Specialist and/or Contractor

A waste specialist and/or contractor must sign-off on the designs to confirm they are adequately sized and located for the safe and convenient storage and collection of the waste streams identified.

***

## <mark style="color:$primary;">Alternative pathways</mark>&#x20;

Where there are alternative pathways that a project can follow to achieve the credit, or sector specific alternatives.&#x20;

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Alternative pathways</summary>

</details>

***

## <mark style="color:$primary;">Clarifications</mark>

Where GBCA have clarified any requirements of the credit criteria. This information is additional and it is not complusory to apply.

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Clarifications</summary>

</details>

***

## <mark style="color:$primary;">Submission content</mark>

#### Submissions for this credit must contain:

* **Submission form** through Green Star Online
* **Evidence** to support claims made in the submission

#### Recommended evidence:

* Site Plan and/or architectural plans highlighting the location of relevant waste facility areas, demonstrating:
  * Collection of waste streams
  * Dedicated waste storage area
  * Access to waste storage area
  * Layout of equipment and bin storage
* Calculations used to demonstrate that the dedicated waste storage area provided is adequately sized
* Details on how the dedicated waste collection areas meet best practice guidelines, in line with third-party best practice guidelines

Alternate documentation can also be used by project teams to demonstrate compliance.

Refer to the [Guidance for Submitting for Designed Assessments](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/other-useful-resources/guidance-for-submitting-for-designed-assessments.md) for further information on submitting evidence for the Designed assessment.

The key requirement is that evidence is provided to support each claim made within the Submission form.

***

## <mark style="color:$primary;">Guidance</mark>

**Off-site recycling**\
Where recyclable waste is taken off-site to be sorted and hence equipment for the different recyclable waste streams will not be provided, the building must demonstrate that the waste will be sorted into the streams required by the credit through a contract for the waste to be removed and sorted.

**Third-party best practice guidelines**\
The City of Sydney's Guidelines for Waste Management in New Developments is a recognised third-party best practice guideline that may be used to calculate waste generation rates and justify access arrangements. Alternative guidelines may be used provided they achieve similar or better outcomes.

**Collecting waste streams – comingled recycling**\
Waste streams may be collected in separate bins or in the same bin where commingled recycling is available. Commingled recycling is permissible to the extent that is accepted by the waste collection service. For example, if glass and plastic are collected as commingled recycling, then paper and cardboard are still required to have a separate recycling bin or container.

**Vehicle access**\
Project teams should consider height clearance for vehicle access and operation.

**Fitout scope**\
Project teams may use a Tenancy Fitout Guide, Model Lease Clauses, and supply contract for bins or storage containers to demonstrate compliance for cold shell or excluded tenancy spaces. Any fitout works within the scope of the rating must meet the requirements for Minimum Expectation.

***

## <mark style="color:$primary;">Definitions</mark>

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#general-waste-materials)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#recyclable-reusable-materials)

***

## <mark style="color:$primary;">Supporting information</mark>

The following resources support this credit:

* City of Sydney's Guidelines for Waste Management in New Developments, available at: <https://www.cityofsydney.nsw.gov.au/development-guidelines-policies/guidelines-waste-management-new-developments>


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/categories-and-credits/responsible/4-or-responsible-resource-management.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.