> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/water-use-calculation-guide/appendix-a.-calculator-data-entry-requirements.md).

# Appendix A. Calculator data entry requirements

## Building information

This section is used to outline attributes of the building that affect water use calculations including project details, occupancy, and space uses, building type and location.

### Project details

Details about the project and Green Star rating are to be disclosed in the 'Building information' tab. This includes:

* The Green Star project number and project name for the registered project.
* The assessment type and round.
* Indicating whether credit substitution is being applied. Projects registered under Green Star Buildings v1.1 must select 'No'. Projects registered under Green Star Buildings v1 that are applying credit substitution must select 'Yes'. Please refer to the Guidance on credit substitution - Using Green Star Buildings v1.1 in Green Star Buildings v1 for guidance on applying credit substitution.
* The criterion targeted for Minimum Expectation. Please refer to the Using the Water Use calculator section of this document for guidance.

### Occupancy profiles

Occupancy profiles indicate the average occupancy of a building every hour within a day. Projects may use standard or custom occupancy profiles for the purpose of defining the building space uses throughout the project.

The profiles used in the Water Use calculator must correlate with those used in the Energy Use model, except where the project team can demonstrate that periods of occupancy would not result in water use (e.g. sleeping people).

#### Standard occupancy profiles

Standard occupancy profiles for each building class are taken from National Construction Code (NCC) 2022 Volume One: Specification 35, Table S35C2b – S35C2k. Please refer to Appendix E: Standard occupancy profiles. Standard occupancy profiles are selected within the 'Building space uses' table as outlined under the Building space use section of this guide.

#### Custom occupancy profiles

Custom occupancy profiles may be defined where none of the existing profiles are suitable for the space type. Custom occupancy profiles are created by entering peak and off-peak profiles into the 'Custom occupancy profiles' section as outlined in Figure 1. There is space in the spreadsheet to enter up to eight user defined profiles. If more space is required, please submit a 'Fix or modify a calculator/scorecard' request to the GBCA.

{% stepper %}
{% step %}

## Select custom occupancy profiles

Select 'Yes' against the item: 'Does the project use occupancy profiles not included in Specification 35 of NCC 2022?'
{% endstep %}

{% step %}

## Enter an occupancy profile name

Enter a custom name into the 'Occupancy profile name' column of the table. This name will appear in the 'Occupancy profile' dropdown box so that it can be selected for one or more rows.
{% endstep %}

{% step %}

## Add a description

Add a brief description. This is for your own reference and helps communicate the custom profiles to the Certified Assessor(s).
{% endstep %}

{% step %}

## Enter occupancy percentages

Enter the percentage of maximum design occupancy that is typically present for each hour on a typical peak and off-peak day.
{% endstep %}
{% endstepper %}

*Figure 1: How to enter custom occupancy profiles into the Water Use calculator*

### Building space use

The 'Building space uses' table captures information on the project's designed spaces and the time spent by the occupants in those spaces.

The project should be divided into space types with different occupancy levels and patterns. For more information on how to do this, refer to the appendix of the Energy Use Calculation Guide. The following data must be entered for all occupied[^1] space types:

#### Space use description

Name for the purpose of the space.

#### Area

Size of the space, entered in m².

#### Peak days of operation per week

The number of days per week that the space is occupied as described in the relevant 'peak' occupancy profile. The remaining days are assumed to follow the off-peak profile.

#### Occupancy profile

The way the space is occupied must be entered by either:

* Selecting one of the 10 standard occupancy profiles, listed from Specification 35 of the NCC 2022; or
* Selecting a custom occupancy profile as defined by the project.

Please refer to the Occupancy profiles section above for guidance on specifying standard and custom occupancy profiles.

#### Type of use

The type of space to inform the maximum design occupancy, determined by either:

* Selecting one of the standard design occupancies as per Table D2D18 of the NCC 2022; or
* Entering the maximum design occupancy manually by selecting 'Other' and completing the 'Custom area per person (m²/person) column.

#### Area per person

The maximum design occupancy, determined by either:

* The 'Type of use' where one of the default design occupancies as per Table D2D18 of the NCC 2022 has been selected; or
* Entering the maximum design occupancy manually into the 'Custom area per person' column where 'Other' has been selected in the 'Type of use' column. Evidence must be provided to support any custom inputs.

#### Users continually occupying the space for periods greater than an hour

The percentage of occupants who occupy the space continuously for periods longer than one hour.

This figure needs to be determined by the design team. It is used to estimate the number of occupants in the project, a parameter required to calculate the water demand from showers (it is assumed that only continuous project users will use the shower facilities). Where multiple spaces are provided for the same project users, only one space should be considered as continually occupied to avoid double counting occupant water consumption as they move about the project.

The percentage should be the number of building occupants who might have access to the showers, not use them. For example, in the case of residential occupants, it would be 100% and 100% will use them. In the case of a retail space, the 'long-term' occupant population (rather than visitors) might be 5% of the maximum population density, but the number that use cyclist facilities might then be 15% of that 5% (because the cyclist facilities are limited to that many users).

The maximum population with access to the showers is calculated from inputs in I16:I25. It is essential to capture the change in water demand from showers for projects where the cyclist facilities may be increased/decreased from the census average within the Movement and Place calculator.

#### Example

A project has 100m² each of residential, commercial and café area.

The residential space would be 100% for both standard practice and reference shower demands.

The commercial and café reference shower demand would be equivalent to the reference in the Movement and Place Calculator. In this example, Adelaide's CBD rate of 3.3% is assumed.

The proposed shower demand for the commercial and cafe areas reflect the percentage of the occupant population that has access to cyclist facilities within the building (15% for this example). To enter this into the calculator, an average of the percentages across the areas would be required as follows:

$$\text{Reference shower demand} = \frac{100,\text{m}^2 \times 100% + 200,\text{m}^2 \times 3.3%}{300,\text{m}^2} = 35.5%$$

$$\text{Proposed shower demand} = \frac{100,\text{m}^2 \times 100% + 200,\text{m}^2 \times 15%}{300,\text{m}^2} = 43.3%$$

### Building type and location

Details of the building are used to determine benchmarks and location-based characteristics of water use. This includes:

* Building type
* Climate zone
* Site elevation (m)
* Bureau of Meteorology (BoM) 10-year average rainfall data location
* Daily rainfall (mm)
* Monthly evapotranspiration, point potential (mm)

#### Building type

The building type selected should reflect the single NCC usage classification as follows:

* Residential – All Class 2 or 3 projects fall under the 'Residential' type.
* Non-residential – All other building classes fall under the 'Non-residential' type.

A mixed use project or building is deemed to be a building in which no single NCC usage classification accounts for more than 80% of the building gross floor area (GFA), excluding car parks, etc. Project teams must select the project type depending on the type applicable to the project. For further guidance on mixed use buildings, refer to the Mixed use projects section of the guide.

#### Climate zone

The climate zone selected should match the NCC climate zone for the project, selected from the following options:

* Climate zone 1, 2, and 5
* Climate zone 3, 4, 6, and 7
* Climate zone 8

#### Site elevation (m above sea level)

This is the site elevation above sea level in metres (m). This is used to derive the local atmospheric pressure for the purpose of calculating water use for indoor swimming pools.

#### Bureau of Meteorology (BoM) 10-year average rainfall data location

Projects may select the relevant BoM 10-year average rainfall data location where relevant to the project. Please refer to Table 20 in Appendix D: BoM 10-year average rainfall data for the available locations and default data. For projects not included in the default BoM 10-year average rainfall data location or looking to enter custom data, 'User input' must be selected.

#### Rainfall

Where the BoM 10-year average rainfall data location is specified, the monthly and daily average rainfall is automatically populated in the 'Monthly Rainfall (mm)' and 'Daily Rainfall (mm)' columns respectively.

For projects not included in the default BoM 10-year average rainfall data location or looking to enter custom data, the 'User Input Daily Rainfall (mm)' column must be completed in line with the Obtaining data from the Australian Bureau of Meteorology (BoM) guidance below. The 'Monthly Rainfall (mm)' table will be automatically populated based on the daily rainfall data provided.

#### Evapotranspiration, point potential

The monthly average point potential evapotranspiration data must be obtained from the Australian Bureau of Meteorology (BoM) in line with the Obtaining data from the Australian Bureau of Meteorology (BoM) guidance below. It should be noted that 'evapotranspiration' and 'evaporation' are not the same. 'Point potential' evapotranspiration data should be used.

#### Obtaining data from the Australian Bureau of Meteorology (BoM)

The monthly average rainfall and point potential evapotranspiration data must be obtained from the Australian Bureau of Meteorology (BoM). The highest resolution grid point extractions from base climatological data sets are required. For rainfall, the highest resolution currently available is based on a 2.5km grid. For point potential evapotranspiration, the highest resolution currently available is based on a 10km grid. Once the project team has extracted the data in the necessary format, it should be entered into the calculator.

{% hint style="warning" %}
For the purposes of Green Star it is necessary to obtain data specific to the project site using the methodology outlined above. It is not acceptable to rely on the publicly available data on the BoM web site, as this is not verifiable data, and does not have the resolution necessary to obtain accurate results from the calculator. The data sets purchased from the BoM must form part of the projects Green Star submission documentation.
{% endhint %}

An example of monthly rainfall and point potential evapotranspiration is provided in Table 19 in Appendix C: Point potential evapotranspiration example.

The climate data can be obtained from the BoM for a nominal fee. More information about this data can be obtained from the Climate Maps section of the BoM website. To purchase this data, please contact the BoM, National Climate Centre. Email: <webclim@bom.gov.au> Phone: (03) 9669 4082, FAX: (03) 9669 4515. To obtain the necessary data, the BoM will require the following:

* Latitude and longitude grid points (coordinates) of the project in decimal degrees. These coordinates can be obtained from good quality maps, or from web based maps/images including Google Earth;
* The type of grid (meteorological element) you require - rainfall and evapotranspiration (point potential);
* The period – average monthly data;
* The output format that you require – Excel.

## Sanitation

Data about the fixtures and fittings included in the project should be entered into the 'Sanitation' section. The following information is required for each type of toilet, urinal, tap and shower being installed in the project:

### Sanitation total water use

The 'Sanitation total water use' section asks a series of yes/no questions to determine the inputs required within the 'Sanitation' tab. This information is also used to help determine the boundaries of the Reference building water consumption. All questions must be answered. Table 8 briefly elaborates on the questions asked within this section.

*Table 8: Water system questions for the purpose of completing the 'Sanitation total water use' section of the 'Sanitation' tab.*

| Fixtures and Fittings                                           | Water system question                                                                                      | Comments                                                                                                                                                                                                                                                                                                            |
| --------------------------------------------------------------- | ---------------------------------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| <p>Toilets<br>Urinals<br>Indoor taps<br>Showers – occupants</p> | Are fixtures and fittings provided for project occupant sanitation?                                        | Select 'yes' where the project includes any toilets, urinals, taps or showers.                                                                                                                                                                                                                                      |
| Showers – sports facilities                                     | Does the project provide for sports activities? Have showers been installed for post/pre activity use?     | Select 'yes' where the project includes a sporting facility as a part of the rated project, and where additional shower and/or change room facilities have been installed to support the installation of the sports facility. For example, the project might include a swimming pool, a gym, or a basketball court. |
| Other fixtures and fittings                                     | Is the project a public building where there are water consumption loads associated with public water use? | Select 'yes' where the project is a public building such as railway stations or aquatic centres where there are water consumption loads associated with public water use.                                                                                                                                           |

### Description

Enter a description of each fixture or fitting. This may include a product name and/or reference number.

### Water efficiency rating

Inputs used to determine water efficiency of the fitting. This can be entered by either of the following:

* Selecting the WELS Star Rating from the drop-down menu. In this case, the corresponding water efficiency is automatically generated. A WELS star rating is awarded when the efficiency of a fixture is between a defined maximum and minimum water efficiency for that star rating. The efficiency with the highest water usage allowed for that particular WELS star rating is generated by the calculator in the 'Flow rate' column. Project teams are advised to manually input the flow rate if it is different from the assumed flow rate for that star rating.
* Manually entering the actual water efficiency, if known. To enter the water efficiency, 'Manufacturer data' is to be selected in the 'Water efficiency rating' column and the 'Custom flow rate' column completed.

### Flow rate

The water efficiency of the fitting in L/min or L/flush.

* Where the WELS Star Rating has been specified in the 'Water efficiency rating' column, the corresponding water efficiency is automatically generated in the 'Flow rate' column.
* Where the actual water efficiency is to be entered, 'Manufacturer data' is to be selected in the 'Water efficiency rating' column and the 'Custom flow rate' column completed. This value will be populated in the 'Flow rate' column. Evidence must be provided to support any custom inputs. The 'Custom flow rate' for showers is limited to a minimum of 6L/min as per AS/NZS 3500.1:2025 Plumbing and drainage Table 3.2.1 – Minimum flow rates and loading units.

### Distribution

The percentage of fittings of this type that are to be installed with this water efficiency.

### Additional information required for urinals

Where urinals are to be installed in the project, the following additional information is required:

* Whether urinals would normally be installed in the building type. This will inform the total water use for toilets and urinals in the Reference building. For projects where the project team does not consider the provision of urinals to form part of the standard practice project design the project team should select "No" from the drop-down menu against the question "Would urinals normally be installed in the project type?" The project team must include justification for this selection in their submission template.
* Whether urinals are on an autotimer. For urinals on autotimer, the following information is required (if no urinals on autotimer are being installed, leave these sections blank):
  * Number of urinals on an automatic timer being installed in the project.
  * Average flow rate (L/flush). This is the average water efficiency of urinals on an automatic timer being installed on the project.

### Additional information required for occupant showers

Where showers for occupant use are included in the project, the following additional information is required:

* Shower demand by occupants (Reference)
* Shower demand by occupants (Proposed)

For residential projects, this should be 100% for both the Reference and Proposed building.

For non-residential projects, this should align with assumptions in the Movement and Place credit. This includes the number of showers required in the Changing Facilities criterion in Minimum Expectation and/or the mode share corresponding to cyclists in the project's Sustainable Transport Plan in the Sustainable Transport criterion in the Credit Achievement. The same value for both the Reference and Proposed building into the Water Use calculator should be used.

### Additional information required for sport showers

Where the project provides for sports activities and showers have been installed for post/pre activity use, the following additional information is required:

* Average expected patronage by sports participants per day. An average based on weekly figures may be used if required.
* Expected number of days per year that sporting facilities are open for use.

### Other fixtures water use

Where there are water consumption loads not able to be captured in the designated tables (such as for public buildings where there are water consumption loads associated with public water use), the following information is to be entered:

* Enter a description of each fixture or fitting.
* The type of fixture (toilets, urinals, indoor taps, or showers).
* Total annual Reference (kL/year) and Proposed (kL/year) water consumption figure.

The total annual Reference (kL/year) and Proposed (kL/year) water consumption figures are added to the sanitation total water use results for each fixture type.

## Whitegoods

Data about the whitegoods included in the project should be entered into the 'Whitegoods' section. The following information is required for each type of clothes washing machine and dishwasher being installed in the project:

### Whitegoods total water use

The 'Whitegoods total water use' section asks a series of yes/no questions to determine the inputs required within the 'Whitegoods' tab. This information is also used to help determine the boundaries of the Reference building water consumption. All questions must be answered. Table 9 briefly elaborates on the questions asked within this section.

*Table 9: Water system questions for the purpose of completing the 'Whitegoods total water use' section of the 'Whitegoods' tab.*

<table><thead><tr><th width="210.5">Whitegoods</th><th width="234.25">Water system question</th><th>Comments</th></tr></thead><tbody><tr><td>Washing machines</td><td>Does the project include any clothes washing machines?</td><td>Select 'yes' where the project will include the specification and installation of clothes washing machines. This includes both domestic and commercial applications.</td></tr><tr><td>Dishwashers</td><td>Does the project include any dishwashers?</td><td>Select 'yes' where the project will include the specification and installation of dishwashers. This includes both domestic and commercial applications.</td></tr></tbody></table>

### Description

Enter a description of each washing machine or dishwasher. This may include a product name and/or reference number.

### Water efficiency rating

Inputs used to determine water efficiency of the whitegoods. This can be entered by either of the following:

* Selecting the WELS Star Rating from the drop-down menu. In this case, the corresponding water efficiency is automatically generated. A WELS star rating is awarded when the efficiency of a fixture is between a defined maximum and minimum water efficiency for that star rating; the efficiency with the highest water usage allowed for that particular WELS star rating is generated by the calculator in the 'Flow rate' column. The flow rate generated where the WELS star rating has been specified is dependent on the machine capacity (place settings) for dishwashers.
* Manually entering the actual water efficiency, if known. To enter the water efficiency, 'Manufacturer data' is to be selected in the 'Water efficiency rating' column and the 'Custom flow rate' column completed.

### Flow rate

The water efficiency of the washing machine or dishwasher in L/kg or L/cycle.

* Where the WELS Star Rating has been specified in the 'Water efficiency rating' column, the corresponding water efficiency is automatically generated in the 'Flow rate' column.
* Where the actual water efficiency is to be entered, 'Manufacturer data' is to be selected in the 'Water efficiency rating' column and the 'Custom flow rate' column completed. Evidence must be provided to support any custom inputs. This value will be populated in the 'Flow rate' column.

### Machine capacity

The capacity of the whitegoods, in either the nominal kg/load capacity of the clothes washing machine or the number of place settings for the dishwasher.

### Quantity

The number of each type of washing machine or dishwasher included in the project.

### Cycles per year

The number of cycles per year for each type of washing machine or dishwasher. Where unknown, an assumed value of 365 is to be entered.

### Proportion of DHW per cycle

Proportion of water used in the washing machines and dishwashers that is domestic hot water (DHW). The proportion of hot water used in washing machines and dishwashers is defined in accordance with the usage of the whitegoods' "normal" or default cycle which the project team should support with manufacturer's documentation. Refer to the Domestic hot water and the Energy Use calculator section of this document for further information about the calculations for domestic hot water use.

## Heat rejection

Data about heat rejection is entered into the 'Heat rejection' section of the calculator. The following information is required for the heat rejection systems present in the project:

### Proposed heat rejection system type

Select the proposed heat rejection system type from the drop-down menu. The available options are summarised in Table 10. Where one of the available options is selected, the deemed evaporative duty fraction (f<sub>duty</sub>) is determined by the calculator. The selected system must be consistent with inputs to the Energy Use calculator.

Projects seeking to specify a 'Custom duty fraction (%)' for the Proposed building may select 'Other (custom value)'.

### Duty fraction

The duty fraction (f<sub>duty</sub>) is the proportion of the system's heat-rejection duty met evaporatively, and therefore consuming water; the remainder is rejected by dry (sensible) means. The project may specify the duty fraction using either of the following methods:

* Where the 'Proposed heat rejection system type' has been selected from the available options, the deemed duty fraction is selected by the calculator as per Table 10. Where this is the case, no inputs are required in 'Custom duty fraction (%)'. Additional systems may be added to the calculator in future updates.
* Where the project team has manufacturer selection data or modelled water-consumption output for the specific unit and climate, 'Other (custom value)' is to be selected within 'Proposed heat rejection system type' and the 'Custom duty fraction (%)' completed. This value will be populated in 'Duty fraction (%)' by the calculator. Evidence must be provided to support any custom inputs.

In either case, the selected system must be consistent with inputs to the Energy Use calculator.

*Table 10: Deemed duty fraction for specified heat rejection systems*

| Heat rejection system type | Evaporative duty fraction ($f\_{duty}$) (%) |
| -------------------------- | ------------------------------------------- |
| Conventional cooling tower | 1.0                                         |
| Evaporative cooler         | 1.0                                         |
| Air-cooled (no water)      | 0                                           |

### Reference building type

Select the project type from the drop-down menu. The available options are summarised in Table 3 within the Heat rejection section in the Reference building assumptions above. The selected building type must be consistent with inputs to the Energy Use calculator.

Projects seeking to specify a 'Custom HVAC system' for the Reference building may select 'Other (custom value)'.

### Assumed HVAC system

The assumed HVAC system is specified as either of the following options, depending on the Reference building type as outlined within the Heat rejection section in the Reference building assumptions above:

* Air-cooled (no water) – The Reference building is assumed to install no water-cooled systems with f<sub>duty</sub> = 0.
* Water-cooled (evaporative) – The Reference building is assumed to install water-cooled systems with f<sub>duty</sub> = 1.0.

The assumed HVAC system may be specified using either of the following methods:

* Where the 'Reference building type' has been selected from the available options, the assumed HVAC system is selected by the calculator as per Table 3 within the Heat rejection section in the Reference building assumptions above. Where this is the case, no inputs are required in 'Custom HVAC system'.
* Where the project is proposing an alternative HVAC system within the Reference building, 'Other (custom value)' is to be selected within 'Reference building type' and the 'Custom HVAC system' completed. This value will be populated in 'Assumed HVAC system' by the calculator.

In either case, the selected system type must be consistent with inputs to the Energy Use calculator.

### Evaporation (monthly cooling load)

The thermal cooling load (kWh thermal/month) for each month in the Proposed and Reference building should be entered. The thermal cooling load for each month must be determined by the energy modelling required as part of the Energy Use calculator.

Where the 'Proposed heat rejection system type' for the Proposed building is 'Air-cooled (no water)', the 'Proposed cooling load (kWh/month)' does not need to be completed. Where the 'Assumed HVAC system' for the Reference building is 'Air-cooled (no water)', the 'Reference cooling load (kWh/month)' does not need to be completed.

### Condenser water (ΔT in °C)

A predicted average Condenser Water Temperature Difference ΔT should be entered in °C.

Where the 'Proposed heat rejection system type' for the Proposed building is 'Air-cooled (no water)', the 'Proposed' value for 'Condenser water Δt (°C)' does not need to be completed.

### Drift coefficient (%)

The predicted drift coefficient should be entered in %. A default value of 0.002% is given. This is based on the requirement in Section 4.4 of AS/NZS 3666.1 Air-handling and water systems of buildings—Microbial control. If a value different from the default value is to be used; the drift coefficient must be determined as per AS 4180.1 Drift loss from cooling towers - Laboratory measurement.

Where the 'Proposed heat rejection system type' for the Proposed building is 'Air-cooled (no water)', the 'Proposed' value for 'Drift coefficient (%)' does not need to be completed.

### Cycles of concentration

The ratio of Total Dissolved Solids (TDS), or conductivity, in the circulating water to that in the make-up water. Per AIRAH DA17 Section 3.6.5 Cycles of concentration, the cycles of concentration is selected by the designer or water-treatment provider and the bleed is adjusted to achieve it.

## Washdown

The following information is to be provided to determine washdown water use:

### Description

Enter a description of each washdown water system.

### Hose flow rate (L/min)

Flow rate for each hose expressed in litres per minute (L/min).

### Number of hoses

Number of hoses included within the development for washdown.

### Average use (minutes/day)

Number of minutes the hose is used each day (minutes per day).

## Landscape irrigation

All landscaped areas in the project that are to receive water via irrigation should be divided into zones. Each zone should have the same soil type, irrigation system, microclimate, plant density and as far as possible, types of plants.

The following data is required to be entered for each zone:

* Climate data (monthly rainfall data, monthly evapotranspiration data)
* Zone name and description.
* Area of zone (in m²).
* Percentage of zone undercover.
* Weighted average Crop Coefficient in the zone.
* Application Efficiency of irrigation system.

### Climate data

Climate data including monthly rainfall data and monthly evapotranspiration data must be provided in the 'Building information' tab. Refer to the Building type and location section above in Appendix A: Calculator data entry requirements for further guidance.

### Name and description

Each zone should be named and described in enough detail for the Green Star Certified Assessor(s) to locate it on drawings.

### Area (m²)

The area of each zone should be entered in m².

### Area undercover (%)

This refers to the total percentage of each zone that will receive very little or no rainfall, as a result of being undercover. This applies to areas which are completely covered e.g. by roofs, significantly covered e.g. under awnings, or under dense vegetation such as trees with thick foliage.

### Weighted average crop coefficient (Kc)

The crop coefficient is an agronomic multiplier used to determine the water usage requirement for a particular plant type. The area weighted average crop coefficient for the zone should be entered into the calculator. Crop Coefficients (Kc) for various plant types are available in Appendix F: Crop coefficient (Kc).

### Irrigation system

The irrigation system used in each zone should be selected from a drop-down menu in the calculator. A list of irrigation systems that may be selected is included in Table 11. Where the irrigation system is selected using the drop-down menu, the water application efficiency (%) is automatically populated.

Where the irrigation system is not included in this list or where the irrigation efficiency is different from the standard values in Table 11, 'User input' should be selected and the available irrigation efficiency entered manually into the 'Custom water application efficiency (%)' column.

### Water application efficiency (%)

Many factors impact the application efficiency of an irrigation method including uniformity, runoff, wind drift, and evapotranspiration. For example, sprays have fixed application of water and generally cover short distances, sprinklers have rotating streams and cover larger distances, and underground drip systems are less affected by wind than above ground systems. The average values in Table 11 reflect the differences between various irrigation system types.

*Table 11: Application efficiencies of common irrigation systems*

<table data-search="false"><thead><tr><th>Irrigation method</th><th>Average application efficiency</th></tr></thead><tbody><tr><td>Sprinklers – Day</td><td>65%</td></tr><tr><td>Sprinklers – Night</td><td>75%</td></tr><tr><td>Sprays – Day</td><td>65%</td></tr><tr><td>Sprays – Night</td><td>70%</td></tr><tr><td>Micro sprays – Day</td><td>60%</td></tr><tr><td>Micro sprays - Night</td><td>65%</td></tr><tr><td>Drip – Bare soil</td><td>80%</td></tr><tr><td>Drip – Under mulch</td><td>85%</td></tr><tr><td>Subsurface drip (SDI)</td><td>90%</td></tr><tr><td>Hand watering</td><td>50%</td></tr></tbody></table>

Where the irrigation efficiency is different from any of the standard values in Table 11, 'User input' may be selected in the 'Irrigation system' column and the available irrigation efficiency can be entered manually into the 'Custom water application efficiency (%) column'. Where a user determined application efficiency figure is used, additional compliance documentation is required to prove that such efficiency can be achieved. The application efficiency of rainfall is assumed to be 60%.

## Swimming pools

Data about the swimming pools included in the project should be entered into the 'Swimming pools' section. Where the project is an aquatic centre, refer to the Aquatic centres section below for guidance on the inputs required. Where the project is not an aquatic centre but includes an outdoor or indoor swimming pool, refer to the Outdoor pools or Indoor pools sections below for further guidance.

### Swimming pools total water use

The 'Swimming pools total water use' section asks a series of yes/no questions to determine the inputs required within the 'Swimming pools' tab. This information is also used to help determine the boundaries of the Reference building water consumption. All questions must be answered. Table 12 briefly elaborates on the questions asked within this section.

*Table 12: Water system questions for the purpose of completing the 'Swimming pools total water use' section of the 'Swimming pools' tab.*

| Swimming pools | Water system question                                                                         | Comments                                                                                               |
| -------------- | --------------------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------ |
| Swimming pools | For projects that are not an aquatic centre, are there any swimming pools within the project? | Select 'yes' where the project is not an aquatic centre but includes indoor or outdoor swimming pools. |
| Aquatic centre | Is the project an aquatic centre?                                                             | Select 'yes' where the project is an aquatic centre.                                                   |

{% hint style="info" %}
A project cannot be classified to have both swimming pools and be an aquatic centre for the purposes of the calculator. If project teams have separately modelled the monthly water consumption of all swimming pools in their project, the aquatic centre classification is recommended.
{% endhint %}

### Aquatic centres

#### Reference and Proposed water use (kL)

Monthly water consumption in kL for a Reference and Proposed building as modelled by the project team. A Technical Question must be submitted to the GBCA to review the modelling assumptions and methodology used. A copy of the GBCA Technical Question response, along with any additional requirements outlined in the response, must be included in the submission.

### Outdoor pools

#### Is the swimming pool outdoor or indoor?

The project must specify whether the swimming pool is 'Indoor' or 'Outdoor' using the drop-down list.

#### Volume (m³)

The volume of the swimming pool in cubic metres (m³).

#### Surface area (m²)

The surface area of the swimming pool (m²).

#### Water consumption for filter cleaning (backwash) (L/clean)

The amount of water used by backwash (filter cleaning) in litres per cleaning cycle (L/clean). Where the 'Water consumption for filter cleaning (backwash) (L/clean)' is not provided by the project team, the standard practice water efficiency value of 250 L/clean is used (refer to Swimming pools section in the Reference building assumptions above for further details).

#### Filter cleaning frequency (cleans/year)

The frequency that filter cleaning is undertaken each year (cleans/year). Where the 'Filter cleaning frequency (cleans/year)' is not provided by the project team, the standard practice water efficiency value of 5 cleans/year is used (refer to Swimming pools section in the Reference building assumptions above for further details).

#### Is a pool cover provided?

The project must specify whether the pool has a cover.

#### Climate data

Climate data including monthly rainfall data and monthly evapotranspiration data must be provided in the 'Building information' tab. Refer to the Building type and location section above in Appendix A: Calculator data entry requirements for further guidance.

### Indoor pools

#### Is the swimming pool outdoor or indoor?

The project must specify whether the swimming pool is 'Indoor' or 'Outdoor' using the drop-down list.

#### Volume (m³)

The volume of the swimming pool in cubic metres (m³).

#### Surface area (m²)

The surface area of the swimming pool (m²).

#### Water consumption for filter cleaning (backwash) (L/clean)

The amount of water used by backwash (filter cleaning) in litres per cleaning cycle (L/clean). Where the 'Water consumption for filter cleaning (backwash) (L/clean)' is not provided by the project team, the standard practice water efficiency value of 250 L/clean is used (refer to Swimming pools section in the Reference building assumptions above for further details).

#### Filter cleaning frequency (cleans/year)

The frequency that filter cleaning is undertaken each year (cleans/year). Where the 'Filter cleaning frequency (cleans/year)' is not provided by the project team, the standard practice water efficiency value of 5 cleans/year is used (refer to Swimming pools section in the Reference building assumptions above for further details).

#### Minimum pool hall exhaust air volume based on the requirements of AS1668.2 (m³/year)

The minimum exhaust rate from the pool hall, as required by AS 1668.2:2024 The use of ventilation and airconditioning in buildings.

#### Proposed design pool hall exhaust air volume (m³/year)

The proposed project exhaust rate from the pool hall per year (m³/year).

#### Average pool hall temperature while pool exhaust is operating (°C)

The average internal air dry-bulb temperature (°C) within the pool hall.

#### Site elevation (m above sea level)

The site elevation above sea level in metres (m) must be provided in the 'Building information' tab. Please refer to the Building type and location section within Appendix A: Calculator data entry requirements.

## Fire protection systems

Data about the fire protection system should be entered in the 'Fire protection systems' section. The following information is required for fire protection systems being installed in the project:

### Does the building's sprinkler system discharge water during testing?

Whether the project discharges any water for fire protection system testing. Where "No" is selected, it is assumed that no water is used for fire protection systems testing, and no further inputs are required.

### Testing frequency (tests/year)

The number of tests per year. Where there is more than one type of fire test per year with differing volumes of water, an average across all fire tests should be determined and included in the calculator. Details of this calculation should be included in the project's submission.

### Water discharged (kL/test)

The quantity of water discharged per test in kL.

### Proportion of water captured per test (%)

Confirmation of the percentage of discharged water that is captured for reuse.

## Process cooling

Data about the process cooling systems should be entered in the 'Process cooling' section. The following information is required for process cooling systems being installed in the project:

### Is all water-based process cooling provided by closed loop systems?

The project must disclose whether all water-based process cooling is provided by closed loop systems. Where "Yes" is selected, the project is assumed to have zero water use due to process cooling, and no further inputs are required.

### Evaporation losses (kL/day)

The daily evaporation losses from the system.

### Water discharged to sewer (kL/day)

The daily discharge to sewer by the system.

### Proportion of daily demand that is potable water

The percentage of the open loop process cooling water demand that is sourced from potable water (%).

## Sitewide water systems

Projects must include the use of the following sitewide or shared water systems that are completely or partially sourced by reclaimed water:

* Demands for reclaimed water that have not already been included in the calculator. The calculator assumes that water demands from any 'non-potable water' uses are met before the 'potable water' water uses.
* Shared rainwater, greywater, or blackwater systems for projects approved for the MBSR Approach or Site-Wide Credit Approach. Sitewide or shared water use systems that do not contribute to or use reclaimed water are excluded from the Water Use calculator.

Data about the sitewide or shared systems should be entered in the 'Sitewide water systems' section. Additional data entry requirements specific to non-potable water systems, and shared rainwater systems, and shared greywater or blackwater systems are summarised in the Reclaimed water section below.

### Description

A description of the sitewide or shared water use system.

### Shared systems water use (kL)

The monthly water demand for reclaimed water (kL/month) for each sitewide non-potable water use or shared water use system. Refer to the Shared Rainwater Collection and Reuse and Shared Greywater or Blackwater Collection and Reuse sections below for further information about the data entry requirements for the relevant systems present on site.

### Other uses of reclaimed water

The demand for reclaimed water from other uses is calculated by the project team on a monthly basis. The total monthly water demand is entered directly into the calculator rather than being determined by the Water Use calculator. The following procedure to calculate the reclaimed water use requirements is to be followed:

* To establish the reclaimed water demand, the monthly water demand (kL/month) for each non-potable water use (wash down, etc.) is to be entered as shown in Figure 2. This table only needs to be filled in if reclaimed water is used to meet the demands of these end uses. If reclaimed water is not used for these end uses, leave these cells blank. When reclaimed water is used, enter the total demand for each month regardless of whether it is fully or partially met by the reclaimed water supply.
* The percentage of each non-potable water use connected to an on-site rainwater system, greywater system, blackwater system, stormwater or off-site supply of recycled water, or mains water, is to be entered into the 'Distribution of reclaimed water use' table within the 'Reclaimed water' tab as shown in Figure 3. Please refer to the Reclaimed water use section below for further guidance.

*Figure 2: Monthly demand of non-potable water uses connected to reclaimed water sources in the 'Sitewide water systems' tab*

*Figure 3: Percentage of non-potable water uses connected to reclaimed water sources in the 'Reclaimed water' tab*

### Shared Rainwater Collection and Reuse

Projects that have multiple buildings sharing a central rainwater tank must use the following procedure for calculating the amount of rainwater available for the rated project site:

{% stepper %}
{% step %}

## Enter central tank information

Enter the total rainfall collection area (m²) and total storage capacity (kL) for the central rainwater tank into the 'Reclaimed water' section of the calculator. Refer to Figure 4 and the Rainwater section of this document for further guidance.

*Figure 4: Inputs for shared rainwater systems in the 'Reclaimed water tab*
{% endstep %}

{% step %}

## Calculate overall rainwater demand

The project team are required to undertake separate calculations that cover all projects served by the central rainwater system. These calculations are used to calculate the overall demand for rainwater based on the demand from all projects and ancillary services (such as landscaping) being served, given the collection area and storage tank capacity.
{% endstep %}

{% step %}

## Enter demand from other projects

Enter the monthly rainwater demand (kL) from the other projects that will utilise the central rainwater tank into the 'Shared systems water use' table within the 'Sitewide water systems' tab. Refer to Figure 5 for an example demonstrating how this table is to be completed.

*Figure 5: Monthly demand of shared rainwater systems in the 'Sitewide water systems' tab*
{% endstep %}

{% step %}

## Set the rainwater distribution

In the 'Distribution of reclaimed water use' table within the 'Reclaimed water' tab, indicate that 100% of the non-potable water will be met by rainwater. The Water Use calculator will assume that these demands are met first before allocating remaining rainwater to the uses nominated within the rated project site. Refer to Figure 6 and the Reclaimed water use section below for further guidance.

*Figure 6: Percentage of non-potable water uses connected to shared rainwater systems in the 'Reclaimed water' tab*
{% endstep %}
{% endstepper %}

### Shared Greywater or Blackwater Collection and Reuse

Projects that have multiple buildings or fitouts sharing a central greywater or blackwater treatment plant must follow the following procedure for calculating the amount of greywater or blackwater available for the rated project site. As the procedures are essentially the same for both these water sources, the example focuses on greywater but can also be used for blackwater.

The project team are required to undertake separate calculations that cover all projects served by the central greywater system. These calculations are used to calculate the overall demand for greywater based on the demand from all projects and ancillary services (such as landscaping) being served, given the collection sources utilised. The amount of greywater that is contributed to and used by the shared systems are to be entered into the 'Shared systems water use' as separate columns, as outlined below and demonstrated in Figure 7.

Where the central greywater treatment system collects from additional sources outside of the rated project site:

* The additional water collected (kL/month) can be entered into the 'Shared systems water use' table within the 'Sitewide water systems' tab. Refer to the 'Shared water system 1 (kL)' column within Figure 7 for an example demonstrating how this table is to be completed.
* In the 'Greywater collection' table within the 'Reclaimed water' tab, indicate that 100% of the discharge water from the shared greywater collection source will be collected. Refer to Figure 8 and the Reclaimed water use section below for further guidance.

*Figure 7: Monthly contribution of shared greywater systems in the 'Sitewide water systems' tab*

Where the central greywater treatment system is used to meet additional demands outside of the rated project site:

* These demands should be entered into the 'Shared systems water use' table within the 'Sitewide water systems' tab. This should include the monthly greywater demand (kL) from the other projects that will utilise the central greywater treatment plant. Refer to the 'Shared water system 2 (kL)' column within Figure 7 for an example demonstrating how this table is to be completed.
* In the 'Distribution of reclaimed water use' table within the 'Reclaimed water' tab, indicate that 100% of the non-potable water will be met by greywater. The Water Use calculator will assume that these demands are met first before allocating remaining greywater to the uses nominated within the rated project site. Refer to Figure 9 and the Reclaimed water use section below for further guidance.

*Figure 8: Percentage of greywater collection for shared greywater collection systems in the 'Reclaimed water' tab*

*Figure 9: Percentage of non-potable water uses connected to shared greywater systems in the 'Reclaimed water' tab*

## Reclaimed water

### Reclaimed water systems

The 'Reclaimed water systems' section asks a series of yes/no questions to determine the inputs required within the 'Reclaimed water' tab. Table 13 briefly elaborates on the questions asked within this section.

*Table 13: Reclaimed water system questions for the purpose of completing the 'Reclaimed water systems' section of the 'Reclaimed water' tab.*

<table><thead><tr><th width="229.25">Reclaimed water system</th><th width="278">Water system question</th><th>Comments</th></tr></thead><tbody><tr><td>Greywater</td><td>Does the project include greywater capture, treatment and reuse systems?</td><td>Select 'yes' where the project includes greywater collection and treatment for reuse on site.</td></tr><tr><td>Blackwater</td><td>Does the project include blackwater capture, treatment and reuse systems?</td><td>Select 'yes' where the project includes blackwater collection and treatment for reuse on site.</td></tr><tr><td>Rainwater</td><td>Does the project include rainwater capture and reuse systems?</td><td>Select 'yes' where the project includes a rainwater tank for the capture and reuse of rainwater on site.</td></tr><tr><td>Stormwater &#x26; off-site</td><td>Does the project include other stormwater reuse or an off-site supply of non-potable water?</td><td>Select 'yes' where either stormwater is captured for reuse, or a recycled water supply is available for use within the project.</td></tr></tbody></table>

### Reclaimed water use

#### Distribution of reclaimed water use (%)

To establish the potable water reclaimed water demand:

* Enter the percentage of each potable water use connected to an on-site rainwater system, greywater system, blackwater system, or off-site supply of recycled water;
* Enter the percentage of each potable water use connected to mains water only.

Where a water use has only a limited portion of fixtures connected to a reclaimed water system, it is possible to enter a percentage between 0% and 100% to account for this. For example, a refurbished project where only 80% of urinals were able to be plumbed into a recycled water system. The balance must be entered under the 'Mains water supply (%)' input column. This scenario is illustrated in Figure 10.

It is possible to enter more than one source of reclaimed water for each of the water uses. This is shown in the included example in Figure 10, where both toilets and urinals are served by rainwater and greywater sources.

*Figure 10: Percentage of water uses connected to reclaimed water sources*

Following this methodology, where the demand from a particular water use can be met by water supplied from more than one source, the total reclaimed water demands can add up to more than 100% of the actual demand. This is not an error as the 'Mains water supply (%)' demand is also calculated, which limits the reduction in potable water demand from reclaimed systems. Therefore, regardless of how much reclaimed water is available, if the water uses are not connected to the reclaimed water system, the reclaimed water will not be used.

The daily demand for reclaimed water from non-potable water uses is calculated in the same way as for potable water uses. Refer to Other uses of reclaimed water section above for further details.

### Greywater and blackwater

The quantity of greywater and blackwater collected, treated and used on site is established by determining the percentage of water uses that are collected on-site for reuse, in addition to any non-potable water uses that are collected. The calculations for both greywater and blackwater availability are performed on a daily basis, taking into account the varying demand for this water seasonally.

To establish the maximum amount of greywater and/or blackwater available daily, the following inputs are required:

* The percentage of discharge from toilets, urinals, taps, showers, whitegoods, heat rejection bleed, swimming pool backwash, fire sprinkler test water and process cooling discharge that is collected and treated for reuse on site. A percentage between 0 and 100 should be entered for all uses.
* The percentage of discharge collection and treated for re-use from other sources such as chiller condensate, cooling tower wash down or sewer mining etc. These are to be entered into the 'Greywater collection' and 'Blackwater collection' tables in Figure 11 below. For guidance on inputs for shared water systems, please refer to the Shared Greywater or Blackwater Collection and Reuse section in Sitewide water systems above.

### Reclaimed water

The Reference building does not include any water re-use systems therefore any use of reclaimed water in the Proposed building will be an improvement over standard practice.

The following reclaimed water sources may contribute to reducing the Proposed building's potable water use:

* Greywater
* Blackwater
* Rainwater
* Stormwater
* Off-site reclaimed water
* Shared rainwater, greywater or blackwater systems

To include the use of reclaimed water, refer to the Reclaimed water section in Appendix A: Calculator data entry requirements.

### Sitewide water systems

Where reclaimed water systems are sitewide or shared, project teams are to declare any other uses of the project's on-site reclaimed water sources. This may include where there a specific uses not already included in the calculator that use the building's reclaimed water systems or where this is a centralised reclaimed water source that the project shares with multiple buildings.

Projects that have multiple buildings sharing a centralised reclaimed water source can only claim the use of this water source if the project is approved for a Multiple Building Single Rating (MBSR) Approach, Site-Wide Credits Approach or has an approved Technical Question from the GBCA. Please refer to the Multiple Building Single Rating (MBSR) Support Document for Green Star Buildings and Site-Wide Credits Approach Support Document for Green Star Buildings available via the Green Star resources portal for guidance on the above approaches.

Refer to the Sitewide water systems section in Appendix A: Calculator data entry requirements for further details on how this should be reflected in the Water Use calculator.

*Figure 11: Percentage of water uses collected for greywater and blackwater recycling*

### Rainwater

The quantity of rainwater collected on site depends on the quantity of rainfall available for collection, the size of the rainwater storage tank and the collection area. The calculations for rainwater availability are done on a daily basis to account for daily variations in rainfall, and the seasonal variation in demand for rainwater, (for example where rainwater is used for cooling systems or irrigation) as well as the ability of the rainwater tank to store water where supply exceeds demand from one day to the next.

To establish the maximum amount of rainwater collected the following inputs are required:

#### Rainfall collection area (m²)

The area where rainwater is collected should be entered in square metres (m²).

#### Roof type

The type of roof should be selected from the drop-down list provided. The available options are summarised in Table 14.

#### Run-off coefficient

The calculator selects the associated run-off coefficient based on the 'Roof type' selected. The run-off coefficients for the available roof types are summarised in Table 14.

*Table 14: Run-off coefficients for different roof types. Source: BSI British Standards (2009), Rainwater Harvesting Systems – Code of Practice.*

<table data-search="false"><thead><tr><th>Roof type</th><th>Run-off coefficient</th></tr></thead><tbody><tr><td>Pitched roof with profiled metal sheeting</td><td>0.9</td></tr><tr><td>Pitched roof with tiles</td><td>0.8</td></tr><tr><td>Flat roof without gravel</td><td>0.8</td></tr><tr><td>Flat roof with gravel</td><td>0.65</td></tr><tr><td>Green roof, intensive</td><td>0.5</td></tr><tr><td>Green roof, extensive</td><td>0.7</td></tr><tr><td>Permeable pavement – Granular media</td><td>0.7</td></tr><tr><td>Permeable pavement – Plastic crates</td><td>0.8</td></tr></tbody></table>

#### Storage capacity

The size of the total storage capacity for rainwater should be entered in kilolitres (kL).

#### Rainwater tank reliability

An indicator for the efficiency of the rainwater tank as a water supply for the project. A low percentage efficiency indicates a tank that is continually unable to satisfy rainwater demand (for example, the project location has very dry summers and wet winters).

*Figure 12: Inputs for rainwater collection systems*

### Stormwater or off-site recycled water source

Using stormwater (collected either on or off-site) or an off-site recycled water source is an acceptable way to achieve reductions in potable water consumption in Green Star provided that it can be demonstrated that the relevant local authority has given approval for its use. Any reclaimed water system must be operational at the time of practical completion of the project.

Both stormwater and any off-site recycled water source should be entered in kilolitres for each month (kL/month). For stormwater, the calculation methodology in the Waterway Protection credit should be followed. For any off-site water supply, the monthly volumes entered into the calculator require validation by the water supply authority.

*Figure 13: Monthly volume of stormwater or off-site reclaimed water source available*

*Table 15: Landscape irrigation definitions*

| Parameter                                       | Description                                                                                                                    |
| ----------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------ |
| Application efficiency of irrigation system (%) | The percentage of water applied via an irrigation system which is taken up by the plants.                                      |
| Application efficiency of rainfall (%)          | The percentage of rainfall that is assumed to be taken up by the plants.                                                       |
| Crop Coefficient                                | The crop coefficient is an agronomic multiplier used to determine the water usage requirement for a particular plant type.     |
| Monthly point potential Evapotranspiration (mm) | Point potential evapotranspiration data from the Bureau of Meteorology.                                                        |
| Monthly rainfall (mm)                           | Rainfall data from the Bureau of Meteorology.                                                                                  |
| Percentage of zone undercover (%)               | This refers to the total percentage of the zone that will receive very little or no rainfall, as a result of being undercover. |

## Results

The results for the purpose of the Sanitary Fixture and Appliance Efficiency, Recycled Water Infrastructure, and Reducing Water Use criteria are presented in the 'Results' tab. This section of the Water Use calculator:

* Allows the project team to indicate the water use systems included within the project.
* Presents the total water use for each water use system for the Reference and Proposed building (kL/year).
* Presents the total reclaimed water provided for the Proposed building (kL/year).
* Presents the total potable water use for the Reference and Proposed building (kL/year).
* Presents the total monthly water use across all systems for the Reference and Proposed building (kL/month).
* Determines reduction in potable water use for the Reference building compared to the Proposed building (%).
* Presents the outcome of the Sanitary Fixture and Applicant Efficiency or Reducing Water Use in Minimum Expectation[^2].
* Determines the points to be awarded for Reducing Water Use in Credit Achievement and Exceptional Performance[^2].
* Calculates the domestic hot water use to be included in the Energy Use calculator.

### Total water use

The 'Total water use' of the calculator includes a project checklist allowing the project to nominate all systems included within the project. The project checklist asks a series of yes/no questions to determine the inputs required throughout the remainder of the calculator. This information is also used to help determine the boundaries of the Reference building's water consumption. All questions must be answered. Table 16 below briefly elaborates on the questions asked within the Water Use calculator.

*Table 16: Water system questions for the purpose of completing the 'Total water use' section of the 'Results' tab.*

<table data-search="false"><thead><tr><th width="174.25">Water use system</th><th width="233.5">Water systems questions</th><th>Comments</th></tr></thead><tbody><tr><td>Sanitation</td><td>Are fixtures and fittings provided for project occupant sanitation?</td><td>Select 'yes' where the project includes any toilets, urinals, taps or showers.</td></tr><tr><td>Whitegoods</td><td>Does the project include any dishwashers or clothes washing machines?</td><td>Select 'yes' where the project will include the specification and installation of dishwashers or clothes washing machines. This includes both domestic and commercial applications of these two items.</td></tr><tr><td>Heat rejection</td><td>Does the project utilise water-based heat rejection (Project cooling)?</td><td>Select 'yes' where the project is utilising water-based heat rejection equipment. This includes conventional cooling towers, in addition to hybrid air/water cooled equipment. Select 'no' if the project will utilise an air-based heat rejection system.</td></tr><tr><td>Washdown</td><td>Does the project include washdown areas?</td><td>Select 'yes' where the project includes a washdown area.</td></tr><tr><td>Landscape irrigation</td><td>Are there any landscaped areas within the project?</td><td>Select 'yes' where landscaped areas have been included in the project.</td></tr><tr><td>Swimming pools</td><td>Are there any swimming pools within the project?</td><td>Select 'yes' where any swimming pools or spas are included within the project, including if the project is an aquatic centre.</td></tr><tr><td>Fire protection systems</td><td>Does the project include a fire protection system?</td><td>Select 'yes' where the project includes a water-based fire protection system, even where this is just a partial water-based solution.</td></tr><tr><td>Process cooling</td><td>Does the project include any water-based process cooling?</td><td>Select 'yes' where the project includes equipment that requires water for process cooling.</td></tr><tr><td>Reclaimed water</td><td>Does any water collection, reclamation and/or reuse occur on the project site?</td><td>Select 'yes' where any form of reclaimed water capture or use is present on the project.</td></tr></tbody></table>

[^1]: Occupied spaces include all spaces in the project except for those with no or low/transient occupancy such as stairwells, corridors and storage rooms.

[^2]: Please note that the final decision to award points and the Minimum Expectation is at the discretion of the Certified Assessor(s) at the time of assessment.


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/water-use-calculation-guide/appendix-a.-calculator-data-entry-requirements.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
