> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/water-use-calculation-guide/appendix-b.-calculation-methodologies.md).

# Appendix B. Calculation methodologies

## Building space use

The concept of person-hours is used in this calculation methodology. A person-hour means that one person has spent one hour in the space. The number of person-hours per month for each space is calculated as follows:

$$Hours\_{person} = \frac{A\_{space}}{Occupancy\_{design}} \times Hours\_{Equivalent}$$

**Where:**

* $$Hours\_{person}$$ = Person hours per month
* $$A\_{space}$$ = Area of space
* $$Occupancy\_{design}$$ = Maximum design occupancy of $$A\_{space}$$
* $$Hours\_{Equivalent}$$ = Equivalent hours at max occupancy in month

**And:**

$$Hours\_{Equivalent} = (Hours\_{Equivalent,peak} \times Days\_{peak}) + (Hours\_{Equivalent,offpeak} \times Days\_{offpeak})$$

**Where:**

* $$Hours\_{Equivalent,peak}$$ = Equivalent hours at maximum occupancy in a peak day (hours)
* $$Days\_{peak}$$ = Number of peak days per month
* $$Hours\_{Equivalent,offpeak}$$ = Equivalent hours at maximum occupancy in an offpeak day (hours)
* $$Days\_{offpeak}$$ = Number of offpeak days per month

The equivalent hours at maximum occupancy in a peak or off-peak day is calculated by summing the percentages in the relevant occupancy profile. This figure represents the equivalent number of hours that the space is occupied at maximum design occupancy. For example, the occupancy profile for a Class 5 building shown in Table 21 in Appendix E: Standard occupancy profiles (the NCC 2022 Table S35C2c 'peak day' profile) describes a space that is occupied from 7am until 9pm. The occupancy in this space varies from 15% at 7am, up to 100% at 9am down to 5% at 8pm. By summing the percentages, we calculate that the equivalent hours at maximum occupancy is 9.5 hours on a 'peak' day for this space type.

The number of occupants present at peak and off-peak times during the day is needed to estimate the water demand from occupant showers. The following calculation is for a peak day, the same is undertaken in the Calculator for off-peak days:

$$Staff\_{peak} = \frac{A\_{space}}{Occupancy\_{design}} \times %*{occupancy} \times %*{Staff}$$

**Where:**

* $$Staff\_{peak}$$ = Number of staff present on a peak day
* $$A\_{space}$$ = area of space
* $$Occupancy\_{design}$$ = maximum design occupancy of $$A\_{space}$$
* $$%\_{occupancy}$$ = Maximum percentage of design occupancy present during peak day
* $$%\_{Staff}$$ = Percentage of occupants who are staff (that use the space as their primary place of work)

The exception to the above is the showers installed for sports facilities, where the water demand is more closely related to patronage engaging in sporting activities. The daily patronage of occupants engaging in sports activities is multiplied with the number of days the facility operates to estimate the annual water consumption associated with shower amenities installed for sports participants. The monthly water consumption is then determined by dividing the annual water consumption by the number of days in a year and multiplying the result by the number of days for each month.

## Sanitation

The total annual water demand from fixtures and fittings for occupant sanitation is calculated as the sum of the water demand from toilets, urinals, taps and showers:

$$\dot{V}*{sanitation,year} = \dot{V}*{toilets,year} + \dot{V}*{urinals,year} + \dot{V}*{taps,year} + \dot{V}*{occupant\ shower,year} + \dot{V}*{sports\ shower,year} + \dot{V}\_{other,year}$$

**Where:**

* $$\dot{V}\_{sanitation,year}$$ = Annual water demand from all sanitation fixtures and fittings (kL/year)
* $$\dot{V}\_{toilets,year}$$ = Annual water demand from toilets (kL/year)
* $$\dot{V}\_{urinals,year}$$ = Annual water demand from urinals (kL/year)
* $$\dot{V}\_{taps,year}$$ = Annual water demand from indoor taps (kL/year)
* $$\dot{V}\_{occupant\ shower,year}$$ = Annual water demand from occupant showers (kL/year)
* $$\dot{V}\_{sport\ shower,year}$$ = Annual water demand from sport showers (kL/year)

### Annual water demand from toilets, urinals and taps

The following calculations are for a fixture or fitting and apply to toilets, urinals and taps. This is used to calculate $$\dot{V}*{toilets,year}$$, $$\dot{V}*{urinals,year}$$ and $$\dot{V}\_{taps,year}$$ above. The annual results described by the following methodology are prorated daily to be incorporated into the daily demand calculation.

$$\dot{V}*{fixture\ or\ fitting,year} = Uses*{fixture\ or\ fitting,year} \times Efficiency\_{fixture\ or\ fitting} \times 0.001$$

**Where:**

* $$\dot{V}\_{fixture\ or\ fitting,year}$$ = Annual water demand from fixture or fitting (kL/year)
* $$Uses\_{fixture\ or\ fitting,year}$$ = Number of fixture or fitting uses per year
* $$Efficiency\_{fixture\ or\ fitting}$$ = Average flow rate of all fixtures or fittings of a given type (L/flush or L/min)

**And:**

$$Uses\_{fixture\ or\ fitting,year} = Hours\_{person} \times Usage\_{fixture\ or\ fitting}$$

**Where:**

* $$Hours\_{person}$$ = Number of person hours per year
* $$Usage\_{fixture\ or\ fitting}$$ = Usage rate (as per )

**And:**

$$Efficiency\_{fixture\ or\ fitting} = (%\_a \times Efficiency\_a) + (%\_b \times Efficiency\_b) + \ldots$$

**Where:**

* $$%\_x$$ = Distribution (%) of each fixture or fitting (x)
* $$Efficiency\_x$$ = Flow rate (L/flush or L/min) of each fixture or fitting (x)

*Table 17: Assumed usage rates of toilets, urinals and taps*

| **Fixtures and Fittings** | **Number of uses per person per day (based on data for 9.5 hour** [**workday**](#user-content-fn-1)[^1]**)** | **Uses per person-hour** |
| ------------------------- | ------------------------------------------------------------------------------------------------------------ | ------------------------ |
| Toilets without urinals   | 2.3                                                                                                          | 0.24                     |
| Toilets with urinals      | 1.3                                                                                                          | 0.14                     |
| Urinal                    | 1                                                                                                            | 0.11                     |
| Taps                      | 2.5                                                                                                          | 0.26                     |

### Annual water demand from showers – occupants

The following calculations are for showers for project occupant use. The annual results described by the following methodology are prorated daily to be incorporated into the daily demand calculation.

$$\dot{V}*{occupant\ shower,year} = Uses*{occupant\ shower,year} \times Efficiency\_{occupant\ shower} \times Length\_{occupant\ shower}$$

**Where:**

* $$\dot{V}\_{occupant\ shower,year}$$ = Annual water demand from occupant showers (L/year)
* $$Uses\_{occupant\ shower,year}$$ = Number of occupant shower uses per year
* $$Efficiency\_{occupant\ shower}$$ = Average of all occupant showers water efficiency (L/min)
* $$Length\_{occupant\ shower}$$ = Average length of occupant shower (minutes)

**And:**

$$Uses\_{occupant\ shower,year} = \left( (Occupant\_{peak} \times %*{occupant,shower} \times Days*{peak}) + (Occupant\_{off\ peak} \times %*{occupant,shower} \times Days*{off\ peak}) \right) \times \frac{365}{7}$$

**Where:**

* $$Occupant\_{peak}$$ = Number of uses on peak or off peak days per week
* $$%\_{occupants,shower}$$ = Percentage of occupants who shower (as described below)
* $$Days\_{peak}$$ = Number of peak or off peak days per week

**And:**

$$Efficiency\_{occupant\ shower} = (%\_a \times Efficiency\_a) + (%\_b \times Efficiency\_b) + \cdots$$

**Where:**

* $$%\_x$$ = Distribution (%) of each occupant shower (x)
* $$Efficiency\_x$$ = Flow rate (L/min) of each occupant shower (x)

**And:**

$$Length\_{occupant\ shower} = 5min$$

### Annual water demand from showers – sports facilities

Where a project's purpose is to cater for sporting activities, where the users will need and use shower facilities (e.g. swimming pool), the project team are required to provide an estimation of the number of users per day and the number of days per year the project operates in this capacity. The annual results described by the following methodology are prorated daily to be incorporated into the daily demand calculation.

$$\dot{V}*{sport\ shower,year} = Uses*{sport\ shower,year} \times Efficiency\_{sport\ shower} \times Length\_{sport\ shower}$$

**Where:**

* $$\dot{V}\_{sport\ shower,year}$$ = Annual water demand from sport showers (L/year)
* $$Uses\_{sport\ shower,year}$$ = Number of sport shower uses per year
* $$Efficiency\_{sport\ shower}$$ = Average of all sport showers water efficiency (L/min)
* $$Length\_{sport\ shower}$$ = Average length of sport shower (minutes)

**And:**

$$Uses\_{sport\ shower,year} = Days\_{open,year} \times Patronage\_{average,day}$$

**Where:**

* $$Days\_{open,year}$$ = Number of days sporting facilities used per year (days/year)
* $$Patronage\_{average,day}$$ = Expected participation in sporting activities (people/day)

An average based on weekly figures may be used if required to determine $$Patronage\_{average,day}$$.

**And:**

$$Efficiency\_{sport\ shower} = (%\_a \times Efficiency\_a) + (%\_b \times Efficiency\_b) + \ldots$$

**Where:**

* $$%\_x$$ = Distribution (%) of each sport shower (x)
* $$Efficiency\_x$$ = Flow rate (L/min) of each sports shower (x)

**And:**

$$Length\_{sport\ shower} = 5min$$

### Other fixture use

Where there are water consumption loads not able to be captured in the designated tables (such as for public buildings where there are water consumption loads associated with public water use), a total annual *Reference* (kL/year) and *Proposed* (kL/year) water consumption figure can be entered. This is added to the 'Sanitation total water use' for the relevant 'Fixture Type'. The annual results are prorated daily to be incorporated into the daily demand calculation.

## Whitegoods

The total water demand for whitegoods is calculated as the sum of the water demand from washing machines and dishwaters.

$$\dot{V}*{whitegoods,year} = \dot{V}*{WM,year} + \dot{V}\_{DW,year}$$

**Where:**

* $$\dot{V}\_{whitegoods,year}$$ = Annual water demand from washing machines and dishwasher (kL/year)
* $$\dot{V}\_{WM,year}$$ = Annual water demand from washing machines (kL/year)
* $$\dot{V}\_{DW,year}$$ = Annual water demand from dishwashers (kL/year)

The water demand from washing machines and dishwashers is calculated annually and prorated daily as outlined below.

### Annual water demand from washing machines

The following calculations are for annual water demand due to washing machines.

$$\dot{V}*{WM,year} = V*{WM,a} + V\_{WM,b} + \cdots$$

**Where:**

* $$V\_{WM,x}$$ = Annual water demand (kL/year) from each washing machine (x)

**And:**

$$V\_{WM,x} = Efficiency\_{WM,x} \times Capacity\_{WM,x} \times Quantity\_{WM,x} \times Cycles\_{WM,x} \times 0.001$$

**Where:**

* $$Efficiency\_{WM,x}$$ = Machine flow rate (L/kg)
* $$Capacity\_{WM,x}$$ = Machine capacity (kg/cycle)
* $$Quantity\_{WM,x}$$ = Number of machines (units)
* $$Cycles\_{WM,x}$$ = Number of cycles per year (cycles/year)

Where unknown, the number of cycles per year is to be assumed to be $$Cycles\_{WM,x} = 365$$.

### Annual water demand from dishwashers

The following calculations are for annual water demand due to dishwashers.

$$\dot{V}*{DW,year} = V*{DW,a} + V\_{DW,b} + \cdots$$

**Where:**

* $$V\_{DW,x}$$ = Annual water demand (kL/year) from each dishwasher (x)

**And:**

$$V\_{DW,annual} = Efficiency\_{DW,x} \times Cycles\_{DW,x} \times Quantity\_{DW,x} \times 0.001$$

**Where:**

* $$Efficiency\_{DW,x}$$ = Machine flow rate (L/cycle)
* $$Cycles\_{DW,x}$$ = Number of cycles per year (cycles/year)
* $$Quantity\_{DW,x}$$ = Number of machines (units)

## Heat rejection

The calculation methodology used for heat rejection is based on:

* AIRAH DA17 (2025): Cooling Towers
* AS/NZS 3666.1:2011 - Air-handling and water systems of buildings - Microbial control
* AS 4180.1:2008 - Measurement of drift loss from cooling towers

### Heat rejection total water use

The annual water demand is the sum of the monthly heat-rejection water demand across the year. The monthly total is then prorated daily to align with the calculator's time step.

Monthly make-up water follows the *AIRAH DA17 Section 3.6.6 System water balance*:

$$\dot{V}*{make\ up} = \dot{V}*{evaporation} + \dot{V}*{drift} + \dot{V}*{bleed} + \dot{V}\_{uncontrolled\ losses}$$

**Where:**

* $$\dot{V}\_{make\ up}$$ = monthly volume of make up water (kL)
* $$\dot{V}\_{evaporation}$$ = monthly volume of evaporated water (kL)
* $$\dot{V}\_{drift}$$ = monthly volume of drift water (kL)
* $$\dot{V}\_{bleed}$$ = monthly volume of bleed water (kL)
* $$\dot{V}\_{uncontrolled\ losses}$$ = other monthly uncontrolled losses (splash out, windage, leaks, overflow, pump gland leakage) (kL)

For a system designed to minimise uncontrolled water losses as per *AIRAH DA17 Section 3.5.6 Design and risk management*, the calculator assumes $$\dot{V}\_{uncontrolled\ losses} = 0$$.

### Evaporation (latent-heat method)

Evaporation is the heat rejected divided by the enthalpy of vaporisation, multiplied by the system's evaporative duty fraction. Because it is anchored to the heat duty rather than an assumed air flow, the result is independent of fan sizing. For hybrid and adiabatic systems, the duty fraction captures the wet (evaporative) stage; the dry stage rejects the balance without consuming water.

Evaporation is calculated directly from the heat rejected. A cooling tower achieves its effect predominantly by evaporating a small portion of the circulating water. Therefore, evaporation is a function of the heat rejected:

$$\dot{V}*{evaporation} = \frac{Q*{cooling} \times f\_{duty}}{\Delta H\_{vap}} \times \frac{3600}{1000}$$

**Where:**

* $$Q\_{cooling}$$ = monthly cooling load rejected (kWh thermal)
* $$\Delta H\_{vap}$$ = enthalpy of vaporisation of water (kJ/kg), taken as 2,430 kJ/kg as per the *AIRAH DA17* value at typical cooling tower design water temperatures of 35°C and 29.5°C (*AIRAH DA17 Section 3.6 Waterside design considerations*)
* $$f\_{duty}$$ = evaporative duty fraction for the heat rejection system type, refer to the *Heat rejection* section in *Appendix A: Calculator data entry requirements* of this guide

At $$\Delta H\_{vap} = 2,430\ kJ/kg$$, this evaluates to approximately 1% of circulating flow per 5.5 °C of range (*AIRAH DA17 Section 3.6 Waterside design considerations*).

The latent fraction (the share of heat rejected as latent rather than sensible load) is held implicitly within $$\Delta H\_{vap}$$ at approximately 1.0 on the basis that the thermodynamic latent share sits at 0.97 to 1.00 across the Australian capital cities in all seasons. Seasonal variation is captured by the calculator's monthly resolution, so no separate latent-fraction or derating term is applied.

### Drift

$$\dot{V}*{drift} = C*{Drift} \times \dot{V}\_{condenser}$$

**Where:**

* $$C\_{Drift}$$ = Drift coefficient
* $$\dot{V}\_{condenser}$$ = monthly total condenser water flow (L)

**And:**

$$\dot{V}*{condenser} = \frac{Q*{cooling} \times 3600}{C\_{p,water} \times \Delta T\_{condenser}}$$

**Where:**

* $$C\_{p,water}$$ = Specific heat of water (4.18 kJ/(kg.°C))
* $$\Delta T\_{condenser}$$ = Condenser water temperature difference (°C)

### Bleed

$$\dot{V}*{bleed} = \max\left(0, \frac{\dot{V}*{evaporation}}{COC-1} - (\dot{V}*{drift} + \dot{V}*{uncontrolled\ losses})\right)$$

**Where:**

* $$Bleed$$ = Bleed water (kL)
* $$COC$$ = Number of cycles of concentration

Drift is subtracted from bleed, as per *AIRAH DA17 Section 3.6 Waterside design considerations*, on the basis that drift already carries dissolved solids out of the system and so contributes to concentration control. The calculation prevents a negative bleed in the rare case where drift alone satisfies the concentration-control requirement. For a system designed to minimise uncontrolled water losses as per *AIRAH DA17 Section 3.5.6 Design and risk management*, the calculator assumes $$\dot{V}\_{uncontrolled\ losses} = 0$$.

### Constants

The following constants are used:

*Table 18: Heat rejection water constants*

| Constant                                       | Value           |
| ---------------------------------------------- | --------------- |
| Enthalpy of vaporisation ($$\Delta H\_{vap}$$) | 2,430 kJ/kg     |
| Specific heat of water ($$C\_{p,water}$$)      | 4.18 kJ/(kg·°C) |
| Density of water at 25 °C[^2]                  | 0.997 kg/L      |

## Washdown

The washdown water calculation methodology uses a simple calculation that assesses the hose flow rate, number of hoses, and the average daily use to calculate the proposed annual water consumption. The annual results described by the following methodology are prorated daily to be incorporated into the daily demand calculation.

The calculation used to determine the water consumption of wash down is:

$$\dot{V}*{washdown,year} = FlowRate \times #of\ hoses \times Uses*{minutes,daily} \times \frac{365}{1000}$$

**Where:**

* $$\dot{V}\_{washdown,year}$$ = Annual water demand from hoses (kL/year)
* $$FlowRate$$ = Flow rate of each hose (L/min)
* $$#of\ hoses$$ = Number of hoses included within the development for washdown
* $$Uses\_{minutes,daily}$$ = Number of minutes the hose is used each day (minutes/day)

## Landscape irrigation

This methodology uses site specific input parameters to determine the monthly and annual volume of water demand from irrigation. It simultaneously determines the performance of a *Reference building* in the same location.

The irrigation requirement for the site is calculated for each month of the year, for each landscaped 'zone' in the site (a zone being a landscaped area that has the same soil type, irrigation system, microclimate, plant density and, as far as possible, types of plants). The irrigation requirement for each zone is calculated in three steps as described below:

{% stepper %}
{% step %}

### Calculate each zone's monthly irrigation requirement

$$Irrigation\ requirement\_{zone,month} = \frac{Demand\_{plant} - Rainfall}{Efficiency\_{irrigation}}$$

**Where:**

* $$Demand\_{plant}$$ = Plant water demand (mm)
* $$Rainfall$$ = Rainfall available for plants (mm)
* $$Efficiency\_{irrigation}$$ = Application efficiency of the irrigation system (%)

**And:**

$$Demand\_{plant} = Epan\_{month} \times K\_C$$

**Where:**

* $$Epan\_{month}$$ = Monthly point potential Evapotranspiration (mm)
* $$K\_C$$ = Weighted average Crop Coefficient

**And:**

$$Rainfall = Rainfall\_{month} \times Efficiency\_{rain} \times (1 - %\_{Undercover})$$

**Where:**

* $$Rainfall\_{month}$$ = Monthly rainfall (mm)
* $$Efficiency\_{rain}$$ = Application efficiency of rainfall (%)
* $$%\_{Undercover}$$ = Percentage of zone undercover (%)

A zone's monthly irrigation requirement is calculated by determining how much water the plants in the zone require and how much water will be provided naturally by rainfall. Therefore, how much water must be provided from an irrigation system is determined, taking into account how efficient the particular irrigation system is at delivering water to the plants.
{% endstep %}

{% step %}

### Calculate the total annual irrigation requirement

Add the irrigation requirements for each month together to calculate the total annual irrigation requirement (mm).
{% endstep %}

{% step %}

### Calculate each zone's annual irrigation requirement

Multiply the annual irrigation requirement, in mm, by the area of the zone, in m², to calculate the zone's annual irrigation requirement (kL/month).
{% endstep %}

{% step %}

### Determine monthly irrigation requirement across all zones

Determine the monthly irrigation requirement (kL/month) across all zones. The monthly results are prorated daily to be incorporated into the daily demand calculation.
{% endstep %}
{% endstepper %}

The parameters that inform landscape irrigation are summarised in *Landscape irrigation* section in *Appendix A: Calculator data entry requirements* above.

## Swimming pools

The total water demand for swimming pools is calculated using different methodologies dependent on whether the project is an aquatic centre or whether a swimming pool is located indoors or outdoors. The monthly water consumption is prorated from the seasonally dependent monthly water consumption to derive a daily demand for calculation of the annual potable water consumption.

The calculation methodology for outdoor and indoor swimming pools is derived from the following:

* ACT Planning and Land Authority (ACTPLA) design and siting requirements for water efficiency;
* ASHRAE 1997 fundamentals handbook.

### Aquatic centres pool water use

For aquatic centres, the project is required to demonstrate monthly water consumption data for a *Reference* and *Proposed building* by undertaking its own modelling. Please submit a Technical Question to the GBCA to review the methodology used.

The monthly results disclosed by the project team are prorated daily to be incorporated into the daily demand calculation.

### Monthly water demand from outdoor swimming pools

The following methodology is applicable to outdoor swimming pools with and without a pool cover. The monthly results described by the following methodology are prorated daily to be incorporated into the daily demand calculation.

#### Outdoor swimming pools without a pool cover

For outdoor swimming pools without a pool cover, the monthly average water demand is calculated as follows:

$$Demand\_{outdoor\ pool,month} = (Evaporation\_{month} + Backwash\_{month}) \times Area\_{pool}$$

**Where:**

* $$Demand\_{outdoor\ pool}$$ = Monthly average water use of an outdoor pool without a pool cover (L)
* $$Evaporation\_{month}$$ = Monthly evaporation consumption (mm)
* $$Backwash\_{month}$$ = Monthly apportioned backwash (filter cleaning)(mm)
* $$Area\_{pool}$$ = Surface area of the outdoor pool (m²)

**And:**

$$Evaporation\_{month} = (Evaporation\_{month,pool} - Rainfall\_{month})$$

**Where:**

* $$Evaporation\_{month,pool}$$ = Average monthly evaporative from swimming pool (mm)
* $$Rainfall\_{month}$$ = Average monthly rainfall (mm)

**And:**

$$Evaporation\_{month,pool} = Epan\_{month} \times K\_{C,pool} \times Rainfall\_{month}$$

**Where:**

* $$Epan\_{month}$$ = Average monthly point potential evapotranspiration (mm)
* $$K\_{C,pool}$$ = Evaporation coefficient, assumed to be 0.7

**And:**

$$Backwash\_{month} = \frac{Backwash\_{annual} \times Days\_{month}}{365}$$

**Where:**

* $$Backwash\_{annual}$$ = Annual backwash demand (mm)

**And:**

$$Backwash\_{annual} = \frac{Demand\_{filter}}{Area\_{pool}} \times Frequency$$

**Where:**

* $$Demand\_{filter}$$ = Filter cleaning demand (L/clean)
* $$Frequency$$ = Frequency of filter cleaning operations (cleans/year)

Where either 'Water consumption for filter cleaning (backwash) (L/clean)' or 'Filter cleaning frequency (cleans/year)' are not provided by the project team, the standard practice water efficiency values of $$Demand\_{filter} = 250\ L/clean$$ and $$Frequency = 5\ cleans/year$$ are used.

#### Outdoor swimming pools with a pool cover

For outdoor swimming pools with a pool cover, the monthly average water demand is calculated in line with the calculations above, however, evaporation is assumed to be negligible from April to October. That is:

**From November to March:**

$$Demand\_{outdoor\ pool,month} = (Evaporation\_{month} + Backwash\_{month})) \times Area\_{pool}$$

**And, from April to October:**

$$Demand\_{outdoor\ pool,month} = (Backwash\_{month})) \times Area\_{pool}$$

### Monthly water demand from indoor swimming pools

The following methodology is applicable to indoor swimming pools. The monthly results described by the following methodology are prorated daily to be incorporated into the daily demand calculation.

$$Demand\_{indoor\ pool,month} = Evaporation\_{month} + Backwash\_{month}$$

**Where:**

* $$Evaporation\_{month}$$ = Monthly evaporation consumption (L)
* $$Backwash\_{month}$$ = Monthly apportioned backwash (filter cleaning)(L)

**And:**

$$Evaporation\_{month} = \dot{m}*{exhaust} \times \omega*{exhaust}$$

**Where:**

* $$\dot{m}\_{exhaust}$$ = Average mass of air exhausted from pool hall (kg/month)
* $$\omega\_{exhaust}$$ = Air moisture content at pool hall temperature (kg water/kg dry air)

**And:**

$$Backwash\_{month} = \frac{Backwash\_{annual} \times Days\_{month}}{365}$$

**Where:**

* $$Backwash\_{annual}$$ = Annual backwash demand (mm)

**And:**

$$Backwash\_{annual} = \frac{Demand\_{filter}}{Area\_{pool}} \times Frequency$$

**Where:**

* $$Demand\_{filter}$$ = Filter cleaning demand (L/clean)
* $$Frequency$$ = Frequency of filter cleaning operations (cleans/year)

Where 'Water consumption for filter cleaning (backwash) (L/clean)' or 'Filter cleaning frequency (cleans/year)' are not provided by the project team, the standard practice water efficiency values of $$Demand\_{filter} = 250\ L/clean$$ and $$Frequency = 5\ cleans/year$$ are used.

## Fire protection systems

The annual consumption is determined by the discharge from the fire protection system during testing and the amount that is captured for reuse. The indicated reuse component is then incorporated into the calculations to contribute to the project's water reuse. The annual results described by the following methodology are prorated daily to be incorporated into the daily demand calculation.

$$\dot{V}*{fire\ protection} = Frequency \times V*{discharged} \times \frac{1}{p\_{captured}}$$

**Where:**

* $$\dot{V}\_{fire\ protection}$$ = Annual water use due to fire protection system testing (kL/year)
* $$Frequency$$ = Testing frequency (tests/year)
* $$V\_{discharged}$$ = Water discharged per test (kL/test)
* $$p\_{captured}$$ = Proportion of water captured per test (%)

## Process cooling

The total water demand for process cooling is calculated using different methodologies depending on whether the system is closed loop or open loop. In both cases, the annual results are prorated daily to be incorporated into the daily demand calculation.

### Closed loop systems

Where the system is closed loop, the calculator assumes that annual water use will be minimal. Therefore, if the project team indicates that process cooling is provided by closed loop systems, the annual water consumption will be assumed to be zero.

### Open loop systems

Where the project team identifies open loop process cooling systems in the project, the following calculations are applied to determine the annual system demand.

$$\dot{V}*{process\ cooling} = (Evap + Discharge) \times %*{potable} \times 365$$

**Where:**

* $$Evap$$ = Evaporation losses per day (kL/day)
* $$Discharge$$ = Water discharged to sewer (kL/day)
* $$%\_{potable}$$ = Proportion of daily demand that is potable water (%)

## Sitewide water systems

Reclaimed water used or contributed by shared water systems are included in the reclaimed water available to the project. Any demand for reclaimed water allocated to non-potable water uses or shared water systems is subtracted from the reclaimed water available to the project before claiming any reductions on site. The monthly results disclosed by the project team are prorated daily to be incorporated into the daily demand calculation.

Refer to the *Reclaimed water* section below for further information about the reclaimed water calculation methodology.

## Reclaimed water

The calculator uses the following steps to determine the impact of any reclaimed water use on the reduction in potable water consumption:

{% stepper %}
{% step %}

### Select reclaimed water systems

The project selects the reclaimed water systems included in the project. Refer to the Reclaimed water section in Appendix A: Calculator data entry requirements for further information on the inputs.
{% endstep %}

{% step %}

### Determine reclaimed water demand

The calculator determines how much reclaimed water is used on site is to establish the water demand that could be met with reclaimed water. The methodology used to establish the demands is given in the *Demand for reclaimed water* section.
{% endstep %}

{% step %}

### Determine reclaimed water availability

The calculator determines how much reclaimed water is available to be collected on-site, in the case of rainwater, greywater, and blackwater. For the off-site supply of recycled water, this involves defining the maximum volume of water available from this source. The methodology used to establish these quantities is given in the *Availability of reclaimed water* section.
{% endstep %}

{% step %}

### Determine whether reclaimed water can be utilised

The calculator determines whether the available reclaimed water can be utilised by the daily demands on site. This involves looking at the water balance between the available sources and their competing demands. Where there is not enough reclaimed water to meet a demand, it is assumed that mains potable water will be used instead.
{% endstep %}
{% endstepper %}

### Demand for reclaimed water

The demand for reclaimed water sets the **upper limit** to reclaimed water use; it is the maximum potential demand. The demand for 'mains water only' is also calculated. This defines the minimum quantity of mains water used. Therefore, regardless of how much reclaimed water is available, if the water uses are not connected to the reclaimed water system, reclaimed water will not be used.

The demands are established separately for each of the following water sources:

* Greywater systems
* Blackwater systems
* Rainwater systems
* Stormwater and off-site reclaimed water systems
* Mains water only

Where water uses are supplied with water from more than one source, it is assumed that they are first supplied with water from any greywater and blackwater systems, followed by rainwater, stormwater and off-site reclaimed water systems. This is to ensure the maximum potential of and greywater and blackwater systems can be claimed within the calculator.

### Availability of reclaimed water

The quantity of reclaimed water available is established by requesting inputs from the project team on:

* Climate data, as provided in the 'Building information' tab
* Rainfall collection areas
* Storage tank sizes
* Percentage of water uses that are collected on-site for recycling
* Volume of water collected from any non-potable water uses, as disclosed in the 'Site-wide water systems' tab
* Water that is available from any off-site recycled water supply, as disclosed in the 'Site-wide water systems' tab

### Utilisation of reclaimed water

The method for calculating the utilisation of reclaimed water has been linked between each of the water uses and reclaimed water sources. This is to allow the *Water Use calculator* to account for water uses that might be utilising reclaimed water from more than one source, such as the example originally given in *Figure 10*, where toilets and urinals were served by a combination of rainwater and greywater.

The following section describes the calculator's process for establishing the reclaimed water utilised on the project. The inputs entered for reclaimed water demand and availability are used in this section. No additional inputs are required.

#### Summary

The maximum potential demand for reclaimed water for a particular water use (be it from rainwater; greywater and blackwater; or stormwater and off-site reclaimed water systems) is calculated on a daily basis using the total daily water demands from each water use, and the percentages of the water uses connected to each type of reclaimed water system.

The calculation methodology follows a number of steps for each day of the year as follows:

{% stepper %}
{% step %}

### Establish rainwater tank volume at day one

Establish rainwater tank volume at day one.
{% endstep %}

{% step %}

### Establish reclaimed water demand for the first water use

Establish the total volume of reclaimed water demand (regardless of source) for the first water use.
{% endstep %}

{% step %}

### Establish available reclaimed water

Establish the volume of reclaimed water available from each reclaimed water source on day one, after subtracting the non-potable water reclaimed water demands – rainwater (established at step 1 for day one), greywater, blackwater, off-site recycled water.
{% endstep %}

{% step %}

### Establish source volumes required

Establish the volume of reclaimed water required from each water source to meet the demands of the first water use.
{% endstep %}

{% step %}

### Calculate reclaimed water utilised

Calculate the volume of reclaimed water utilised from each water source to meet the demands of the first water use.
{% endstep %}

{% step %}

### Repeat for each additional water use

Repeat Steps 2 to 5 for each additional water use in the project. The availability of a reclaimed water source will subtract any reclaimed water utilised by a previous water use in the sequence.
{% endstep %}

{% step %}

### Establish rainwater tank volume at the end of day one

Establish the volume of the rainwater tank at the end of day one. This then becomes the volume of the rainwater tank at the beginning of day two after any additional rainfall has been added to the tank. It has been assumed that treated greywater and blackwater can only be held for 24 hours due to health requirements, therefore where the full volume is not used within a day it is rejected to sewer.
{% endstep %}
{% endstepper %}

#### Calculation methodology

{% stepper %}
{% step %}

### Establish rainwater tank volume on day one

To ensure that a fair assessment of rainwater reuse is undertaken, the tank is first initialised by undertaking a full year of daily rainwater calculations to determine the volume of the rainwater tank on day one.

The quantity of rainwater available for use depends on the amount of rainwater that is already in the tank left over from previous days, the rain that can be collected in the day in question minus a certain volume of rainwater that must be diverted from the tank at each rain event to prevent contaminants polluting the tank (referred to as a 'first flush[^3]'). The amount of rain that can be collected depends on the monthly rainfall and the size, pitch and absorbency of the collection area. The first flush is always assumed to be 0.5L/m² (*HB 230-2008 Rainwater Tank Design and Installation Handbook*). First flush reductions are only ever applied on days when rainfall events occur.

In the event that the maximum capacity of the tank is reached as a result of one or more heavy rain events, no further water will be added to the tank and at the end of the day the remaining volume will be equal to the tank capacity. This ensures that undersized tanks do not provide a false indication of rainwater reuse.

The equation used to determine the rainwater available is:

$$Rainwater\_{available} = Rainwater\_{prev} + Rainwater\_{new} - Rainfall\_{FF}$$

**Where:**

* $$Rainwater\_{available}$$ = Rainwater available for use on day (x) (kL)
* $$Rainwater\_{prev}$$ = Rainwater already in tank from previous day's rainfall (kL)
* $$Rainwater\_{new}$$ = Rainfall on collection area on day (x) (kL)
* $$Rainfall\_{FF}$$ = Rainwater diverted as first flush (kL)

**And:**

$$Rainwater\_{prev} = 0$$ (for day (x))or, Result from step 7 (previous day)

**And:**

$$Rainwater\_{new} = Day\_x \times A\_{collection} \times C\_{runoff}$$

**Where:**

* $$Day\_x$$ = 10 year average daily data for each day (mm)
* $$A\_{collection}$$ = Collection area (m²)
* $$C\_{runoff}$$ = Runoff coefficient

**And:**

$$Rainfall\_{FF} = 0.5 \times A\_{collection}$$
{% endstep %}

{% step %}

### Establish the total volume of reclaimed water demand for the first water use

Step 2 sets maximum reclaimed water demand for each water use. Starting with toilets on the 1st of January, the maximum demand for reclaimed water for toilets is calculated as follows:

$$Reclaimed\ Water\ Demand\_{toilets\ max} = (Demand\_{toilets} \times (1 - %\_{toilets}))$$

**Where:**

* $$Reclaimed\ Water\ Demand\_{toilets\ max}$$ = Maximum potential demand for reclaimed water for toilets on 1st of January
* $$%\_{toilets}$$ = Percentage of toilets served by mains potable water
* $$Demand\_{toilets}$$ = Water demand from toilets on 1st of January
  {% endstep %}

{% step %}

### Establish the volume of reclaimed water available from each reclaimed water source on day one

Step 3 calculates the reclaimed water available from each of the reclaimed water sources that could be used to meet the demand. The calculation of rainwater availability is covered under Step 1 and so will not be repeated here. Greywater and blackwater use a similar method to calculate the reclaimed water available for reuse. The greywater available on the 1st of January for use is calculated as follows:

$$Greywater\ available = (Demand\_{toilets} \times %*{grey\ toilet} + Demand*{urinals} \times %*{grey\ urinals} + \cdots) + Greywater\ available*{shared} - Greywater\ used\_{shared}$$

**Where:**

* $$Greywater\ available$$ = Greywater available on 1st of January
* $$Demand\_{toilets}$$ = Water demand from toilets on 1st of January
* $$%\_{grey\ toilets}$$ = Percentage of toilets from which greywater is collected for reuse
* $$Demand\_{urinals}$$ = Water demand from urinals on 1st of January
* $$%\_{grey\ toilets}$$ = Percentage of urinals from which greywater is collected for reuse
* $$Greywater\ available\_{shared}$$ = Greywater contributed by any non potable or shared or site wide water systems
* $$Greywater\ used\_{shared}$$ = Greywater demand from other non potable or shared or site wide water systems

Stormwater and off-site recycled water source availability is calculated differently as values are entered directly as a kL/month value. For these two inputs the monthly value is prorated to a daily kL/day available to meet demand.
{% endstep %}

{% step %}

### Establish the volume of reclaimed water required from each water source to meet the demands

Step 4 looks at the demand requirements for each of the reclaimed water sources independently. Using this method, where the demand for a particular water use could be met by water supplied from more than one source, the total reclaimed water demands of each independent source can add up to more than 100% of the total reclaimed water demand calculated at Step 2. This is not an error, as the demand calculated at Step 2 then provides a limit for Step 5 of the calculation.

The calculation for each of the reclaimed water sources is similar to the example given below for rainwater. Starting with toilets on the 1st of January, the maximum demand for rainwater for toilets is calculated as follows:

$$Rainwater\ Demand\_{toilets\ max} = (Demand\_{toilets} \times %\_{toilet\ rain\ max})$$

**Where:**

* $$Rainwater\ Demand\_{toilets\ max}$$ = Maximum potential demand for rainwater for toilets on 1st of January
* $$Demand\_{toilets}$$ = Water demand from toilets on 1st of January
* $$%\_{toilets\ rain\ max}$$ = Maximum percentage of toilets served by rainwater

The volume of rainwater required for each non-potable or shared or sitewide water use is calculated using the same method to determine $$Rainwater\ Demand\_{shared\ max}$$.
{% endstep %}

{% step %}

### Calculate the volume of reclaimed water utilised from each water source to meet the demands

The daily calculations are undertaken in a cascading manner, checking that for each water use the nominated reclaimed water source has capacity to service the demand before allowing potable water to be substituted with reclaimed water. Where a reclaimed water source has met the limit of its capacity and no other source is available, the remaining demand is assumed to be met by mains potable water.

Greywater water is the first reclaimed water source assessed, followed by blackwater, rainwater, and then off-site and stormwater sources. The logic flow representing this assessment is best demonstrated by the flow chart in *Figure 14*. The example in *Figure 14* is for toilets, however, the same methodology is applied to all uses of non-potable water including any non-potable or shared or site-wide systems.

<figure><img src="https://749968417-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FRL05MQuVhZhkDMQBuGrI%2Fuploads%2FNzYsvuA2SHQqj1rTHMgo%2Ffigure-14-reclaimed-water-utilisation.png?alt=media&amp;token=8f98cc76-ecc0-4cae-8cb8-3c2ee5f70566" alt=""><figcaption></figcaption></figure>

*Figure 14: Flowchart showing the reclaimed water utilisation methodology*
{% endstep %}

{% step %}

### Repeat Steps 2 to 5 for each additional water use in the project

The calculations described in Steps 2 to 5 describe how the Water Calculator establishes the reclaimed water utilised for the first water use, but does not address any of the other subsequent water uses such as urinals, irrigation, or heat rejection etc. The calculations are essentially the same for each ensuing water use, with the exception of Step 3 where the availability of each of the reclaimed water sources is reassessed.

For each of the following water uses, the reclaimed water available becomes the reclaimed water remaining:

$$Greywater\ remaining = Greywater\ available - Greywater\ utilised\_{toilets+\cdots}$$

**Where:**

* $$Greywater\ remaining$$ = Greywater available after subtracting greywater utilised by previous water uses
* $$Greywater\ available$$ = Greywater available on 1st of January
* $$Greywater\ utilised\_{toilets+\cdots}$$ = Greywater utilised by previous water uses
  {% endstep %}

{% step %}

### Establish the volume of the rainwater tank at the end of the day

After repeating Steps 2 to 5 for all water uses, a summary of the reclaimed water sources utilised is calculated. The volumes must then reset again for the next day of the daily calculations. The following equation establishes the volume of the rainwater tank on the next day:

$$Rainwater\_{available} = Rainwater\_{prev} - Rainwater\_{demand,x} + Rainwater\_{new} - Rainfall\_{FF} - Rainwater\_{demand,shared}$$

**Where:**

* $$Rainwater\_{available}$$ = Rainwater available for use on day (x) (kL)
* $$Rainwater\_{prev}$$ = Rainwater in tank at start of previous day (kL)
* $$Rainwater\_{demand,x}$$ = Rainwater used on previous day (kL)
* $$Rainwater\_{new}$$ = Rainfall on collection area on day (x) (kL)
* $$Rainfall\_{FF}$$ = Rainwater diverted as first flush (kL)
* $$Rainwater\_{demand,shared}$$ = Rainwater demand from other non potable, shared, and site wide uses on day (x) (kL)

In undertaking the above calculation, the *Water Use calculator* also reviews whether the rainwater tank reaches its capacity with any new rainfall added to the tank.

$$Volume\_{day\ start} = MAX\ \[0\ AND\ MIN\ of\ \[Cap\_{tank}\ AND\ Rainwater\_{available}]]$$

**Where:**

* $$Cap\_{tank}$$ = Tank storage capacity (kL)
  {% endstep %}
  {% endstepper %}

## Results

### Total water use

The 'Total water use' table presents the total water use for each water use system for the *Reference* and *Proposed building* (kL/year), and the reclaimed water provided for the *Proposed building* (kL/year) as calculated in each previous section of the calculator. This table is specific to projects targeting the Reducing Water Use criterion in all performance levels.

The total potable water use for the *Reference* and *Proposed building* (kL/year) is given by the following formula:

$$\dot{V}*{total,year} = \dot{V}*{sanitation,year} + \dot{V}*{whitegoods,year} + \dot{V}*{heat\ rejection,year} + \dot{V}*{washdown,year} + \dot{V}*{landscape\ irrigation,year} + \dot{V}*{swimming\ pools,year} + \dot{V}*{fire\ protection\ systems,year} + \dot{V}*{process\ cooling,year} - \dot{V}*{reclaimed,year}$$

**Where:**

* $$\dot{V}\_{total,year}$$ = Annual potable water demand from all potable water uses (kL/year)
* $$\dot{V}\_{sanitation,year}$$ = Annual potable water demand from all sanitation fixtures and fittings (kL/year)
* $$\dot{V}\_{whitegoods,year}$$ = Annual potable water demand from dishwashers and washing machines (kL/year)
* $$\dot{V}\_{heat\ rejection,year}$$ = Annual potable water demand from heat rejection systems (kL/year)
* $$\dot{V}\_{washdown,year}$$ = Annual potable water demand from washdown (kL/year)
* $$\dot{V}\_{landscape\ irrigation,year}$$ = Annual potable water demand from landscape irrigation (kL/year)
* $$\dot{V}\_{swimming\ pools,year}$$ = Annual potable water demand from swimming pools or aquatic centre water use (kL/year)
* $$\dot{V}\_{fire\ protection\ systems,year}$$ = Annual potable water demand from fire protection systems (kL/year)
* $$\dot{V}\_{process\ cooling,year}$$ = Annual potable water demand from process cooling (kL/year)
* $$\dot{V}\_{reclaimed,year}$$ = Annual reclaimed water use from all non potable water sources and across all systems (kL/year)

**And:**

$$\dot{V}*{reclaimed,year} = Greywater*{total\ use,year} + Blackwater\_{total\ use,year} + Rainwater\_{total\ use,year} + Stormwater\_{total\ use,year}$$

**Where:**

* $$Greywater\_{total\ use,year}$$ = Annual total greywater use across all water systems (kL/year)
* $$Blackwater\_{total\ use,year}$$ = Annual total blackwater use across all water systems (kL/year)
* $$Rainwater\_{total\ use,year}$$ = Annual total rainwater use across all water systems (kL/year)
* $$Stormwater\_{total\ use,year}$$ = Annual total stormwater and off site water use across all water systems (kL/year)

### Monthly water use

The 'Monthly water use' table presents the total water use across all system for each month of the year for the *Reference* and *Proposed building* (kL/year). This table is specific to projects targeting the Reducing Water Use criterion in all performance levels.

The total potable water use for the *Reference* and *Proposed building* (kL/year) is given by the following formula:

$$\dot{V}*{total,month} = \sum*{days\ in\ month} \dot{V}*{total,day} - \dot{V}*{reclaimed,day}$$

**Where:**

* $$\dot{V}\_{total,month}$$ = Potable water demand from all potable water uses for a given month (kL/month)
* $$\dot{V}\_{total,day}$$ = Potable water demand from all potable water uses for a given day (kL/day)
* $$\dot{V}\_{reclaimed,day}$$ = Reclaimed water use from all non potable water sources and across all systems for a given day (kL/day)

**And:**

$$\dot{V}*{total,day} = \dot{V}*{sanitation,day} + \dot{V}*{whitegoods,day} + \dot{V}*{heat\ rejection,day} + \dot{V}*{washdown,day} + \dot{V}*{landscape\ irrigation,day} + \dot{V}*{swimming\ pools,day} + \dot{V}*{fire\ protection\ systems,day} + \dot{V}\_{process\ cooling,day}$$

**Where:**

* $$\dot{V}\_{sanitation,day}$$ = Potable water demand from all sanitation fixtures and fittings for a given day (kL/day)
* $$\dot{V}\_{whitegoods,day}$$ = Potable water demand from dishwashers and washing machines for a given day (kL/day)
* $$\dot{V}\_{heat\ rejection,day}$$ = Potable water demand from heat rejection systems for a given day (kL/day)
* $$\dot{V}\_{washdown,day}$$ = Potable water demand from washdown for a given day (kL/day)
* $$\dot{V}\_{landscape\ irrigation,day}$$ = Potable water demand from landscape irrigation for a given day (kL/day)
* $$\dot{V}\_{swimming\ pools,day}$$ = Potable water demand from swimming pools or aquatic centre water use for a given day (kL/day)
* $$\dot{V}\_{fire\ protection\ systems,day}$$ = Potable water demand from fire protection systems for a given day (kL/day)
* $$\dot{V}\_{process\ cooling,day}$$ = Potable water demand from process cooling for a given day (kL/day)

**And:**

$$\dot{V}*{reclaimed,day} = Greywater*{total\ use,day} + Blackwater\_{total\ use,day} + Rainwater\_{total\ use,day} + Stormwater\_{total\ use,day}$$

**Where:**

* $$Greywater\_{total\ use,day}$$ = Total greywater use across all water systems for a given day (kL/day)
* $$Blackwater\_{total\ use,day}$$ = Total blackwater use across all water systems for a given day (kL/day)
* $$Rainwater\_{total\ use,day}$$ = Total rainwater use across all water systems for a given day (kL/day)
* $$Stormwater\_{total\ use,day}$$ = Total stormwater and off site water use across all water systems for a given day (kL/day)

### Reduction in potable water use

The reduction in potable water use is determined by the following formula:

$$\Delta\dot{V} = 1 - \frac{\dot{V}*{total,proposed}}{\dot{V}*{total,reference}}$$

**Where:**

* $$\Delta\dot{V}$$ = Reduction in potable water use (%)
* $$\dot{V}\_{total,proposed}$$ = Annual potable water demand from all potable water uses for the *Proposed building* (kL/year)
* $$\dot{V}\_{total,reference}$$ = Annual potable water demand from all potable water uses for the *Reference building* (kL/year)

## Domestic hot water and the *Energy Use calculator*

The Green Star Buildings v1 *Energy Use calculator* and Green Star Buildings v1.1 *Energy Use – Pathway A Reference building calculator* (referred to as the *Energy Use calculator* from here on) assesses reductions in energy consumption compared to a *Reference building*. More information about these calculators is available on the relevant Energy Use calculation guide on the [Green Star resources portal](https://www.gbca.org.au/greenstar-manager/resources/).

The energy consumption associated with water heating for taps, showers, dishwashers and washing machines in the project (domestic hot water) is a required consideration for the modelling completed for the *Energy Use calculator*. The methodology that must be used to determine the energy consumption associated with domestic hot water is included in the *Energy Use calculation guide*. The methodology shows that reductions in energy use can be achieved by installing more efficient fittings and fixtures as well as installing a more efficient hot water system and/or a solar hot water system.

The domestic hot water demand figures that must be used are calculated and displayed in the *Water Use Calculator*. The calculator assumes that 50% of the water used in taps and showers in the *Proposed* and *Reference building* is hot water. The proportion of hot water used in washing machines and dishwashers is defined in accordance with the usage of the whitegoods' "normal" or default cycle which the project team should support with manufacturer's documentation.

The hot water consumption figures are displayed in the 'Results' tab of the *Water Use calculator*.

The domestic hot water use for the *Reference* and *Proposed building* is given by the following methodology:

$$\dot{V}*{DHW,year} = \left( (\dot{V}*{taps,year} + \dot{V}*{occupant\ shower,year} + \dot{V}*{sports\ shower,year}) \times 0.5 \right) + (\dot{V}*{WM,year} \times p*{DHW,WM}) + (\dot{V}*{DW,year} \times p*{DHW,DW})$$

**Where:**

* $$\dot{V}\_{DHW,year}$$ = Annual domestic hot water demand (kL/year)
* $$\dot{V}\_{taps,year}$$ = Annual water demand from indoor taps (kL/year)
* $$\dot{V}\_{occupant\ shower,year}$$ = Annual water demand from occupant showers (kL/year)
* $$\dot{V}\_{sport\ shower,year}$$ = Annual water demand from sport showers (kL/year)
* $$\dot{V}\_{WM,year}$$ = Annual water demand from washing machines (kL/year)
* $$\dot{V}\_{DW,year}$$ = Annual water demand from dishwashers (kL/year)
* $$p\_{DHW,WM}$$ = Proportion of water used in the washing machines that is domestic hot water (%)
* $$p\_{DHW,DW}$$ = Proportion of water used in the dishwashers that is domestic hot water (%)

[^1]: **This is the equivalent hours at maximum occupancy for an office space as defined in NCC 2022 Table S35C2c Weekday occupancy and operation profiles of a Class 5 building, a Class 7 warehouse, a Class 8 Laboratory or a Class 9a clinic, day surgery or procedure unit.**

[^2]: Density of water at 25 °C is assumed to be 1 kg/L for the purpose of the calculations within the *Water Use calculator*.

[^3]: **First Flush**: The first rainfall event may contain higher than average amounts of accumulated dust, industrial pollutants, bird and animal droppings, leaves and other debris. Rainwater collection systems typically divert this initial rainfall to drain to ensure the good quality of collected rainwater.


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/water-use-calculation-guide/appendix-b.-calculation-methodologies.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.