> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2/38-or-impacts-to-nature.md).

# 38 | Impacts to Nature

Points: 2

## <mark style="color:$primary;">Outcome</mark>

Ecological value is conserved and protected.

### <mark style="color:$primary;">Nature Positive Pathway</mark>

<table><thead><tr><th width="274">Registration</th><th>Star rating</th><th>Requirement</th></tr></thead><tbody><tr><td rowspan="3"><strong>Registering from 2028 onwards</strong></td><td>4 Star</td><td>Meets <em>Minimum Expectation</em></td></tr><tr><td>5 Star</td><td rowspan="2">Meets <em>Credit Achievement</em></td></tr><tr><td>6 Star</td></tr><tr><td rowspan="3"><strong>Registering from 2030 onwards</strong></td><td>4 Star</td><td rowspan="3">Meets <em>Credit Achievement</em></td></tr><tr><td>5 Star</td></tr><tr><td>6 Star</td></tr></tbody></table>

## <mark style="color:$primary;">Criteria</mark>

<mark style="color:$success;">**Minimum Expectation — Nil**</mark>

* [#id-38.0.1-sensitive-sites-and-species-protection](#id-38.0.1-sensitive-sites-and-species-protection "mention"): An assessment is conducted to identify if the project's site or adjacent sites, within 100m, contain sensitive sites or sensitive species. Where identified, measures are in place to ensure these are protected from significant impacts from the project's development and operations.
* [#id-38.0.2-metrics-disclosure](#id-38.0.2-metrics-disclosure "mention"): Metrics related to land/freshwater-use change are disclosed.
* [#id-38.0.3-managing-light-pollution-impacts](#id-38.0.3-managing-light-pollution-impacts "mention"): The project's light pollution is minimised.

<mark style="color:$success;">**Credit Achievement — 2 points**</mark>

In addition to *Minimum Expectation*:

* [#id-38.1.1-protecting-site-ecological-value](#id-38.1.1-protecting-site-ecological-value "mention"): The project demonstrates no net biodiversity loss.

***

## <mark style="color:$primary;">Additional information</mark>

#### Scope of credit

All areas within the site boundary (beyond the Green Star project boundary if different) and adjacent sites.

**Managing Light Pollution Impacts**

All external lighting in the project boundary. Signage related to emergency exits and external emergency lighting that only illuminates in the event of an emergency/power failure are excluded. Lighting related to other safety requirements are also excluded, for example, the lighting of ATMs.

**Protecting Site Ecological Value**

All areas within the project boundary.

#### Stage implementation

**Strategy** | **Brief** | **Concept** | **Design** | **Tender** | **Construction** | **Handover** | **Use**

#### Synergies with other credits

* Nature Connectivity
* Biodiversity Enhancement
* Waterway Protection
* Nature Stewardship

#### Sustainable Development Goals

* **Goal 14:** Life Below Water
* **Goal 15:** Life on Land

#### Relevant reporting initiatives

* GRESB
* Task Force on Nature-related Financial Disclosure **(TNFD)**

***

## <mark style="color:$primary;">Requirements</mark>

### <mark style="color:$success;">Minimum Expectation</mark>

The project must comply with **all three** of the following criteria:

* Sensitive Sites and Species Protection
* Metrics Disclosure
* Managing Light Pollution Impacts

#### 38.0.1 Sensitive Sites and Species Protection

#### *Sensitive sites and species assessment*

The project team assesses the site to determine whether the project's site or adjacent sites, within 100m, has a risk of containing sensitive sites or sensitive species (refer *Definitions*). The assessment identifies:

* Risks that the project's site and adjacent sites, within 100m, include any *sensitive sites* or *sensitive species* (permanent or migratory).
* Risks of *significant impact* from the project's development or operations to *sensitive sites* or *sensitive species.*
* For sites near waterways, waterflow reviews are required to ensure no impacts are carried downstream to sensitive sites or sensitive species.

If the assessment identifies issues under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act), and the site is deemed a *controlled action*, it is classified as a sensitive site and the project must comply with all subsequent criteria.

If risks are identified, a qualified ecologist conducts an ecological assessment. If the risk is confirmed, the project must comply with the *Protecting sensitive sites and species requirements* below.

Where no risks of *sensitive sites* or *sensitive species* have been identified as part of the assessment, this criterion is considered met.

#### *Timing of assessment*

The sensitive sites and species assessment is based on the site conditions at earliest purchase date or option contract.

In cases where the site has been owned by the current owner for more than five years (from the project's Green Star registration date), the requirements are applied to the state of the site that existed at least five (but not more than ten years) prior to the project's Green Star registration date.

Where the previous condition of the site is unclear, a qualified ecologist assesses the site to determine its ecological value at the approximate time of purchase.

#### *Protecting sensitive sites or species*

**Sensitive sites**\
Where there are *sensitive sites* within, or adjacent to, the site boundary:

* The *sensitive sites* are protected from *significant impacts* and ongoing impacts are managed.
* Adjacent sites have measures in place to prevent *significant impacts* from occurring, and ongoing impacts are managed.

**Sensitive species**\
Where there are *sensitive species* within, or adjacent to, the site boundary:

* Areas used by *sensitive species* (permanent or migratory) are protected from significant impacts and ongoing impacts are managed.
* Adjacent sites have measures in place to prevent *significant impacts* from occurring and ongoing impacts are managed.

**Protecting from significant impacts**\
To consider a *sensitive site* or *sensitive species* protected from *significant impacts*:

* Development does not occur in or within 100m of that area, or
* Where development must occur, the project team contacts the GBCA and seeks an allowance to comply with the GBCA's [Above and Beyond Approach](https://www.gbca.org.au/get/resources/2566/CA85B988281E199711C10D3E8E65B3CB). Refer *Guidance* for further information.

**Management of impacts**\
Where a *sensitive site* or *sensitive species* are identified, but protected from *significant impacts*, ongoing management of impacts is required through a site-specific Biodiversity Management Plan prepared by a qualified ecologist or another qualified professional.

As a minimum, the plan identifies:

* How impacts from noise, waste, pollution and light during construction are managed.
* A process for ongoing monitoring, reporting and management to identify potential significant impacts to sensitive site or sensitive species throughout the duration of project's construction and after practical completion.
* Where important wildlife habitats are identified, a process for mitigation and monitoring the external artificial lighting as per the [*National Light Pollution Guidelines for Wildlife* ](https://www.dcceew.gov.au/sites/default/files/documents/national-light-pollution-guidelines-wildlife.pdf)is included with input from a qualified lighting professional.

Management actions for the construction period of the project are included in the construction Environmental Management Plan (EMP) as required in the [*Responsible Construction*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/2-or-responsible-construction.md) credit.

#### 38.0.2 Metrics Disclosure

Metrics related to land and/or freshwater-use change are disclosed.

The following metrics are disclosed as defined by the Taskforce for Nature Financial Disclosure (TNFD):

* Total spatial footprint (km<sup>2</sup>)
* Extent of land/freshwater ecosystem use change (km<sup>2</sup>)
* Extent of land/freshwater ecosystem conserved or restored (km<sup>2</sup>)
* Extent of land/freshwater ecosystem that is sustainably managed (km<sup>2</sup>)

Refer *Guidance* section for information on TNFD and the metrics.

#### 38.0.3 Managing Light Pollution Impacts

#### *Limiting obtrusive effects*

All external lighting on the project complies with all lighting parameters in both Table 3.2 and Table 3.3 from *AS/NZS 4282:2023*.

The calculation plane is considered at the project's site boundary, with no setback and no consideration of the location of adjacent buildings, unless the boundary is adjacent to one of the following:

* A road
* For Class 7b buildings in an industrial estate: another industrial or commercial development

For these scenarios, the calculation plane location is as per Clause 3.3.1.4 from *AS/NZS 4282:2023* for these boundaries.

#### *Direct illuminance to night sky*

Direct illuminance from all external lighting on the project produces a maximum initial point illuminance value no greater than:

* 0.5 Lux to the site boundary
* 0.1 Lux to 4.5 metres beyond the site into the night sky, when modelled using a calculation plane set at the highest point of the building

Calculations are in accordance with *AS/NZS 4282:2023*.

The calculation plane covers the area between the site boundary and building façade or vertical service to be illuminated. The horizontal calculation plane is set at the top of the building fabric, excluding spires. Calculation plane grid points have a 0.5m spacing. All illumination results are reported to within 2 decimal places.

### <mark style="color:$success;">Credit Achievement</mark>

In addition to *Minimum Expectation*, the project must comply with the following criterion:

* Protecting Site Ecological Value

**Prerequisite**: At least 10% of the area within the project boundary or an area equivalent to 0.1% of the total GFA, whichever is larger, is vegetated to target this criterion. This does not include vegetation that has been planted to address *Minimum Expectation*.

#### 38.1.1 Protecting Site Ecological Value

The project demonstrates no net loss of biodiversity value compared to the site conditions prior to development.

An ecological assessment is conducted by a qualified ecologist to evaluate the existing biodiversity and ecological values of the site prior to development early in the planning phase.

Refer *Guidance* section for acceptable calculation methods.

Projects that demonstrate compliance with the [*Biodiversity Enhancement*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2/39-or-biodiversity-enhancement.md) credit and meet the prerequisite for *Credit Achievement* are considered to have met this criterion.

***

## <mark style="color:$primary;">Alternative pathways</mark>&#x20;

Where there are alternative pathways that a project can follow to achieve the credit, or sector specific alternatives.&#x20;

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Alternative pathways</summary>

Existing FAQs are currently located [*here*](https://www.gbca.org.au/greenstar-manager/faqs/). GBCA are working on bringing them across to this site. New FAQs will be published here under the relevant credit and type.

</details>

***

## <mark style="color:$primary;">Clarifications</mark>

Where GBCA have clarified any requirements of the credit criteria. This information is additional and it is not complusory to apply.

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Clarifications</summary>

Existing FAQs are currently located [*here*](https://www.gbca.org.au/greenstar-manager/faqs/). GBCA are working on bringing them across to this site. New FAQs will be published here under the relevant credit and type.

</details>

***

## <mark style="color:$primary;">Definitions</mark>

Definitions provided here must be applied to Requirements unless agreed with GBCA via a Technical Question.

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#external-lighting)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#matters-of-national-environmental-significance)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#land-freshwater-use-change-metrics)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#qualified-ecologist)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#qualified-lighting-professional)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#project-boundary)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#project-site)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#sensitive-sites)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#sensitive-species)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#significant-impact)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#site-boundary)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#upward-light-output-ratio-ulor)

***

## <mark style="color:$primary;">Guidance</mark>

Guidance is supporting information for the credit requirements and is not mandatory to apply.

**Relationship to the&#x20;*****Biodiversity Enhancement*****&#x20;credit**\
This credit intends to ensure sensitive sites and species are not significantly impacted and that there is minimal impact on the site's ecological value by the building's development. The [*Biodiversity Enhancement*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2/39-or-biodiversity-enhancement.md) credit intends to recognise projects that go beyond this and improve the ecological value of the site.

**Site assessment vs ecological assessment**\
The initial site assessment to identify the potential presence of sensitive sites and species can be conducted by the project team. The subsequent ecological assessment is to be conducted by a qualified ecologist. The same ecological assessment may be used for to determine the existing biodiversity and ecological values of the site prior to development if the project team is targeting *Credit Achievement* in this credit and/or the [*Biodiversity Enhancement*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2/39-or-biodiversity-enhancement.md) credit.

**EPBC Act**\
Project teams can determine whether the project site is subject to approval under the EPBC Act by referring to their Development Approval documents.

**Above and Beyond Approach**\
While preventing significant impacts is the purpose of the credit, regulatory approval may allow sensitive sites or sensitive species to be impacted via a controlled action. In these situations, the project team must contact the GBCA to seek approval to use the [Above and Beyond Approach](https://www.gbca.org.au/get/resources/2566/CA85B988281E199711C10D3E8E65B3CB) to comply with the *Minimum Expectation* and be eligible for a Green Star rating.

The Above and Beyond Approach outlines actions that go beyond regulatory requirements (such as those set by planning or statutory regulations e.g., the EPBC Act) to avoid, minimise, compensate and enhance ecological values in line with the conservation and mitigation hierarchy. The use of this approach is solely at the discretion of GBCA and is not automatic. Projects must obtain written approval from the GBCA via an [Eligibility Query or Technical Question](https://www.gbca.org.au/greenstar-manager/requests/). Because of the sensitive nature of the issue, these queries may take a significant time to resolve.

**Light pollution**\
*Control of upward light output (ULOR)*\
A luminaire with a ULOR as nominated in the manufacturer's data sheet, will have a different ULOR when the mounting orientation of the luminaire is changed. If any external luminaire is mounted in an orientation other than the one nominated by the manufacturer, the ULOR must be recalculated and provided by project teams.

*Awnings*\
Awnings can be used as a means of achieving compliance with the 5% ULOR requirement where a section drawing showing the light output of the luminaire can be provided, and where the awning has the effect of blocking 95% of the output of the lamp above the horizontal. This requirement is not met where it is not clear if the awning is a permanent structure.

**Purpose of the prerequisite in&#x20;*****Credit Achievement***\
A minimum area of vegetation is required on site to target *Credit Achievement* as the intent is to encourage projects that have high site ecological value to achieve an equivalent site ecological value after development. Projects that do not meet the prerequisite are encouraged to target the [*Biodiversity Enhancement*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2/39-or-biodiversity-enhancement.md) credit and increase the biodiversity on their site.

Projects that have vegetated areas that are close to the values in the prerequisite may submit a Technical Question to justify why the criteria is relevant to their project.

**Early in the planning phase**\
The ecological assessment is encouraged to be conducted as early as possible so that an accurate understanding of the existing biodiversity and ecological values of the site prior to any changes on site. It is also intended that the assessment informs design decisions in maintaining or enhancing the site's ecological value.

**Calculating biodiversity values**\
Projects registered prior to the release of the Green Star Biodiversity Net Gain methodology can use their preferred method, provided it is relevant to the Australian context and considers the following:

* Habitat size: Larger habitats tend to support greater species richness, provide more ecosystem services, and offer increased ecological stability.
* Habitat distinctiveness and rarity: The uniqueness of a habitat, including its ecological characteristics, and the presence of rare or threatened species highlight its irreplaceable conservation value.
* Ecological condition and quality: The health and quality of the habitat, including vegetation cover, soil health, and absence of invasive species, determine its capacity to support biodiversity and ecosystem functions.
* Connectivity and strategic importance: The habitat's role in connecting with other natural areas, maintaining wildlife corridors, and supporting gene flow and species movement. This includes its ecological importance within local and regional networks.
* Local importance: The value of the habitat to local ecosystems, communities, or cultural practices, emphasising its role in providing services or holding significance at a localised level.

The following tools are available and may assist in the calculation of biodiversity net gain.

* [The United Kingdom's statutory biodiversity metric](https://www.gov.uk/guidance/biodiversity-metric-calculate-the-biodiversity-net-gain-of-a-project-or-development)
* [Victorian Government Habitat Hectare measurement](https://www.environment.vic.gov.au/native-vegetation/native-vegetation-removal-regulations/biodiversity-information-and-site-assessment)
* [NSW Government Biodiversity Assessment method](https://www.environment.nsw.gov.au/topics/animals-and-plants/biodiversity-offsets-scheme/about/biodiversity-assessment-method)
* Biodiversity net gain calculator
* [City of Melbourne's Green Factor Tool](https://www.melbourne.vic.gov.au/green-factor-tool)

***

## <mark style="color:$primary;">Submission content</mark>

Submissions for this credit must contain

* **Submission form** through Green Star Online
* **Evidence** to support claims made in the submission

#### Recommended evidence

The following list of evidence serves as a guide for the Certified submission and is not exhaustive. Project teams are not required to provide all of the listed items and alternate forms of documentation can be used to demonstrate compliance. The key requirement is that evidence is provided to support each claim.

**Sensitive Sites and Species Protection**

* Extracts from the development application
* Zoning plans
* Evidence of site purchase date
* Site assessment
* Extracts from ecological assessment
* Extracts from Biodiversity Management Plan
* Extracts from construction EMP

**Metrics Disclosure**

* Impacts Disclosure template

**Managing Light Pollution Impacts**

* As built drawings indicating the location of all external luminaires and showing the aiming point and mounting orientation of all external luminaires.
* Luminaire schedule for all external lighting, nominating the type, lighting distribution and quantity of each luminaire and including the relevant photometric data such as ULOR.
* Calculation plots for all external lighting, showing that all grid points on the calculation plane return compliant Lux values.
* Excerpt from lighting control system, or similar, demonstrating automatic deactivation of lights, based on external lux levels, where deactivation is required to achieve compliance.

**Protecting Site Ecological Value**

* Extracts from ecological assessment
* As built drawings
* Biodiversity value calculation

Refer to the [Guidance for Submitting for Designed Assessments](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/other-useful-resources/guidance-for-submitting-for-designed-assessments.md) for further information on submitting evidence for the Designed assessment.

***

## <mark style="color:$primary;">Supporting information</mark>

The following resources support this credit:

* AS/NZS 4282:2023 - Control of the Obtrusive Effects of Outdoor Lighting
* DCCEEW - [Environmental Protection and Biodiversity Conservation Act 1999](https://www.dcceew.gov.au/environment/epbc)
* DCCEEW - [National Light Pollution Guidelines for Wildlife](https://www.dcceew.gov.au/sites/default/files/documents/national-light-pollution-guidelines-wildlife.pdf)
* GBCA - [Building with Nature](https://gbca-web.s3.amazonaws.com/media/documents/gs-future-focus-building-with-nature-fa-web_emZlpIB.pdf): Prioritising Ecology and Biodiversity for Better Buildings and Cities
* GBCA – [Nature positive roadmap](https://gbca-web.s3.amazonaws.com/media/documents/draft-nature-positive-roadmap.pdf)
* [Nature Design Guide](https://www.oculus.info/news/nature-design-guide)
* TNFD - [Taskforce on Nature-related Financial Disclosures (TNFD) Recommendations](https://tnfd.global/publication/recommendations-of-the-taskforce-on-nature-related-financial-disclosures/#publication-content)
* TNFD – [Additional sector guidance – Engineering, construction and real estate](https://tnfd.global/publication/additional-sector-guidance-engineering-construction-and-real-estate/)


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2/38-or-impacts-to-nature.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.