> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/4-or-responsible-resource-management.md).

# 4 | Responsible Resource Management

Points: Nil

## <mark style="color:$primary;">Outcome</mark>

Operational waste and resources can be separated and recovered in a safe and efficient manner.

## <mark style="color:$primary;">Criteria</mark>

<mark style="color:$success;">**Minimum Expectation — Nil**</mark>

* [#id-4.0.1-collection-of-waste-streams](#id-4.0.1-collection-of-waste-streams "mention")**:** The project is designed for the collection of separate waste and resource streams.
* [#id-4.0.2-dedicated-waste-storage-area](#id-4.0.2-dedicated-waste-storage-area "mention"): The building provides a dedicated and adequately sized waste and resource storage area.
* [#id-4.0.3-safe-and-efficient-access-to-waste-storage](#id-4.0.3-safe-and-efficient-access-to-waste-storage "mention"): The building ensures safe and efficient access to waste and resource storage areas for both occupants and waste and resource collection contractors.

***

## <mark style="color:$primary;">Additional information</mark>

#### Scope of credit

Operational waste forecasted to be generated by all occupants in the building.

#### Stage implementation

Strategy | Brief | Concept | **Design** | Tender | Construction | **Handover** | **Use**

#### Sustainable Development Goals

* **Goal 11:** Sustainable Cities
* **Goal 12:**  Responsible Consumption and Production
* **Goal 13:** Climate Action

***

## <mark style="color:$primary;">Requirements</mark>

### <mark style="color:$success;">Minimum Expectation</mark>

The project must comply with **all three** of the following criteria:

* Collection of Waste Streams
* Dedicated Waste Storage Area
* Safe and Efficient Access to Waste Storage

#### 4.0.1 Collection of Waste Streams

The project enables the building owner or operator to collect waste from building occupants in separate streams.

#### *Waste Streams*

As a minimum, the following waste streams are able to be collected separately:

* General waste going to landfill.
* Recycling streams to be collected by the building's waste collection service, including:
  * Paper and cardboard
  * Glass
  * Plastic
* One additional waste stream identified by the project team such as organics, e-waste, batteries etc.

Collection of any other single waste stream (except food waste) that is expected to represent more than 5% of total annual operational waste and resources (by volume) is provided.

Refer *Guidance* for further information about comingled recycling collection.

#### *Collection*

The project provides chute intakes, bins or storage containers to ensure the applicable waste streams are collected separately as close to its point of generation as possible. The chute intakes, bins or storage containers are labelled and easy to access.

{% hint style="success" icon="dot" %}
**Fitout scope**\
Project teams may use a tenancy fitout guide and model lease clauses, or a supply contract for bins or storage containers to demonstrate compliance for cold shell or excluded tenancy spaces. Any tenancy spaces with fitout works within the scope of the rating must meet the requirements.
{% endhint %}

#### 4.0.2 Dedicated Waste Storage Area

#### *Dedicated Area*

The project has a dedicated area, or areas, for the storage and collection of the applicable waste streams to ensure they remain separate prior to being transported off-site. The storage area is sized to accommodate all bins or containers, for all applicable waste streams, for at least one collection cycle. The calculations used to demonstrate that the area provided is adequately sized to handle the waste streams specified are based on:

* Forecasted waste generated by occupants
* Collection frequency for each waste stream

The calculations for waste generation rates are based on figures outlined within third-party best practice guidelines. Refer *Guidance* for more information.

#### *Access*

The storage area(s) are safe and easy to access for collection vehicles by providing the following:

* Collection vehicles have access to park adjacent to the dedicated waste storage area in the building.
* Driveways, height clearances, manoeuvring area and parking area adjacent to the dedicated waste storage areas is in accordance with *AS 2890.2:2018 - Parking facilities – Part 2: Off-street commercial vehicle facilities*.

{% hint style="success" icon="dot" %}
**Tenanted buildings**\
The dedicated waste storage area and strategy accounts for the potential waste quantities from the excluded tenancy spaces. This can be estimated based on the building class type. Where the tenants are known, an estimate of their waste quantities are included.
{% endhint %}

#### 4.0.3 Safe and Efficient Access to Waste Storage

A waste specialist and/or waste contractor sign-off on the designs to confirm they are adequately sized and located for the safe and convenient storage and collection of the waste streams identified.

***

## <mark style="color:$primary;">Alternative pathways</mark>&#x20;

Where there are alternative pathways that a project can follow to achieve the credit, or sector specific alternatives.&#x20;

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Alternative pathways</summary>

Existing FAQs are currently located [*here*](https://www.gbca.org.au/greenstar-manager/faqs/). GBCA are working on bringing them across to this site. New FAQs will be published here under the relevant credit and type.

</details>

***

## <mark style="color:$primary;">Clarifications</mark>

Where GBCA have clarified any requirements of the credit criteria. This information is additional and it is not complusory to apply.

These were previously referred to as *Frequently Asked Questions*.&#x20;

<details>

<summary>Clarifications</summary>

Existing FAQs are currently located [*here*](https://www.gbca.org.au/greenstar-manager/faqs/). GBCA are working on bringing them across to this site. New FAQs will be published here under the relevant credit and type.

</details>

***

## <mark style="color:$primary;">Definitions</mark>

Definitions provided here must be applied to Requirements unless agreed with GBCA via a Technical Question.

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#general-waste-materials)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#recyclable-reusable-materials)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#waste-specialist)

***

## <mark style="color:$primary;">Guidance</mark>

Guidance is supporting information for the credit requirements and is not mandatory to apply.

**Co-mingled recycling**\
Waste streams may be collected in separate bins or in the same bin where commingled recycling is available. Commingled recycling is permissible to the extent that is accepted by the waste collection service. For example, if glass and plastic are collected as commingled recycling, then paper and cardboard are still required to have a separate recycling bin or container.

**Easy to access bins or storage containers**\
Bins or storage containers are considered to be easy to access when distributed evenly across the floor plate. Chute intakes are easy to access when located centrally on the floor plate in the common area of the building and within 30m from the entry/exit of each unit or tenancy. Buildings with larger floor plates may require multiple chute intakes to meet this distance.

**Off-site recycling**\
Where recyclable waste is taken off-site to be sorted and hence equipment for the different recyclable waste streams will not be provided, the building must demonstrate that the waste will be sorted into the streams required by the credit. This can be demonstrated through a contract for the waste to be removed and sorted or that this is standard for the local council.

**Third-party best practice guidelines**\
The [City of Sydney's Guidelines for Waste Management in New Developments](https://www.cityofsydney.nsw.gov.au/development-guidelines-policies/guidelines-waste-management-new-developments) is a recognised third-party best practice guideline that may be used to calculate waste generation rates and justify access arrangements. Alternative guidelines may be used provided they achieve similar or better outcomes.

**Waste specialist and/or waste contractor**\
The design and signoff of the project's waste management strategy can be provided by the same party.

***

## <mark style="color:$primary;">Submission content</mark>

Submissions for this credit must contain:

* **Submission form** through Green Star Online
* **Evidence** to support claims made in the submission

#### Recommended evidence

The following list of evidence serves as a guide for the Certified submission and is not exhaustive. Project teams are not required to provide all of the listed items and alternate forms of documentation can be used to demonstrate compliance. The key requirement is that evidence is provided to support each claim.

**Collection of Waste Streams**

* Extracts from operational waste management plan.
* Photos or as built drawings to highlight location, labelling and access to chute intakes, bins or storage containers.
* Photos or as built drawings to highlight the different waste streams being collected separately.
* Calculations of forecasted operational waste and the different streams.

**Dedicated Waste Storage Area**

* Extracts from operational waste management plan.
* Photos, as built site plans and drawings highlighting the location and layout of the waste storage area.
* Calculations of forecasted operational waste and that the dedicated waste storage area provided is adequately sized.
* Evidence of collection frequency assumptions.
* Details on how the dedicated waste collection areas meet best practice guidelines, in line with third-party best practice guidelines.

**Safe and Efficient Access to Waste Storage**

* Extracts of sign-off from waste specialist and/or waste contractor.

Refer to the [Guidance for Submitting for Designed Assessments](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/other-useful-resources/guidance-for-submitting-for-designed-assessments.md) for further information on submitting evidence for the Designed assessment.

***

## <mark style="color:$primary;">Supporting information</mark>

The following resources support this credit:

* AS 2890.2:2018 - Parking facilities – Part 2: Off-street commercial vehicle facilities.
* Better Buildings Partnership – [Operational Waste Guidelines](https://www.betterbuildingspartnership.com.au/resource/guidelines-for-operational-waste-procurement-management-and-reporting/)
* City of Perth – [Waste Guidelines for Developments](https://perth.wa.gov.au/en/building-and-planning/planning-and-building-applications/waste-guidelines-for-developments)
* City of Sydney - [Guidelines for Waste Management in New Developments](https://www.cityofsydney.nsw.gov.au/development-guidelines-policies/guidelines-waste-management-new-developments)
* NSW EPA – [Better Practice Guidelines for Waste Management and Recycling in Commercial and Industrial Facilities](https://www.epa.nsw.gov.au/sites/default/files/120960-comm-ind.pdf)
* Sustainability Victoria – [Waste Management and Recycling in Multi-unit Developments Better Practice Guide](https://assets.sustainability.vic.gov.au/susvic/Guide-Waste-Management-and-Recycling-in-Multi-unit-Developments.pdf)
* Zero Waste SA – [Better Practice Guide Waste Management for Residential and Mixed Use Developments](https://www.greenindustries.sa.gov.au/documents/ZWSA%20Better%20Practice%20Guide%20FINAL%20FOR%20WEB.pdf)


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/4-or-responsible-resource-management.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.