> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/introduction.md).

# Introduction

{% hint style="warning" %}
**Release 1.1 Rev A - 17/12/2025**

* Maintenance and correction revision

[#version-control](#version-control "mention")
{% endhint %}

<table data-search="false"><thead><tr><th width="735.25">Section</th></tr></thead><tbody><tr><td><a data-mention href="#about-green-star-buildings">#about-green-star-buildings</a></td></tr><tr><td><a data-mention href="#rating-tool-resources">#rating-tool-resources</a></td></tr><tr><td><a data-mention href="#developing-green-star-buildings">#developing-green-star-buildings</a></td></tr><tr><td><a data-mention href="#how-green-star-buildings-works">#how-green-star-buildings-works</a></td></tr><tr><td><a data-mention href="#certifying-your-project">#certifying-your-project</a></td></tr><tr><td><a data-mention href="#achievement-scale">#achievement-scale</a></td></tr><tr><td><a data-mention href="#promoting-your-green-star-project-registration-and-certification">#promoting-your-green-star-project-registration-and-certification</a></td></tr><tr><td><a data-mention href="#rating-tool-updates">#rating-tool-updates</a></td></tr><tr><td><a data-mention href="#common-definitions">#common-definitions</a></td></tr><tr><td><a data-mention href="#additional-information">#additional-information</a></td></tr></tbody></table>

## <mark style="color:$primary;">About Green Star Buildings</mark>

Green Star Buildings aims to meet current and future demands on the built environment with aspirational benchmarks for design, construction, and operational performance. It also provides a pathway for building owners to address carbon emissions over time.

Green Star Buildings is a rating tool developed to rate the design and construction of any building. Green Star Buildings aims to:

* Assist clients and project teams to achieve and rate their sustainability goals for their project.
* Encourage a new approach by rewarding healthy, resilient, and positive best practice outcomes and excellence.
* Provide consistent and clear advice in an easy-to-use manner.

Green Star Buildings features eight categories representing the issues that will define the next decade of the built environment.

<table data-search="false"><thead><tr><th width="221.5">Category</th><th>Description</th></tr></thead><tbody><tr><td><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible.md">Responsible</a></td><td>Recognises activities that ensure the building is designed, procured, built, and handed over in a responsible manner.</td></tr><tr><td><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3.md">Healthy</a></td><td>Promotes actions and solutions that improve the physical and mental health of occupants.</td></tr><tr><td><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/resilient-2.md">Resilient</a></td><td>Encourages solutions that address the capacity of the building to bounce back from short-term shocks and long-term stresses</td></tr><tr><td><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3.md">Positive</a></td><td>Encourages a positive contribution to key environmental issues of carbon, water, and the impact of materials.</td></tr><tr><td><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/places-2.md">Places</a></td><td>Supports the creation of safe, enjoyable, integrated, and comfortable places.</td></tr><tr><td><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/people-3.md">People</a></td><td>Encourages solutions that address the social health of the community.</td></tr><tr><td><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2.md">Nature</a></td><td>Encourages active connections between people and nature and rewards creating biodiverse green spaces in cities.</td></tr><tr><td><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/leadership-3.md">Leadership</a></td><td>Recognises projects that set a strategic direction, build a vision for industry, or enhance the industry's capacity to innovate.</td></tr></tbody></table>

Each category groups a number of issues related to a certain impact. These are known as credits. A credit addresses an initiative that improves or has the potential to improve a project's performance.

Credits are weighted in relation with each other by varying the number of points available. Each credit defines a clear outcome that a project must meet. Where the outcome is verified to have been met, a project will be awarded the relevant available points.

Once all credits are assessed, the total number of points achieved is compared against the available points in the rating tool, and a certified rating is awarded.

A building seeking certification can achieve a Green Star 'Certified' rating. This rating is awarded at the end of construction and does not expire. There is an option to complete a 'Designed' assessment, an interim step towards the full certification.

Green Star Buildings certification identifies projects that have demonstrated the achievement of a specific level of sustainability. The rating describes to the industry the sustainability attributes of the project in terms that are widely understood and accepted.

## <mark style="color:$primary;">Key features</mark>

Green Star Buildings v1.1 has five key features:

* Delivers a holistic definition of a sustainable building
* Drives deep decarbonisation
* Responds to sustainability megatrends of nature and circularity
* Creates clear expectations for new buildings
* Drives opportunities for supply chain transformation

### Delivers a holistic definition of a sustainable building

Green Star Buildings is underpinned by a holistic framework that addresses social and environmental issues. This rating tool responds to global movements and initiatives such as the Paris Agreement and the United Nation's Sustainable Development Goals. These are increasingly on the radar of investors, governments, and communities. Green Star Buildings certification will give owners, occupiers, and investors' confidence that theirs is a high-quality and future-proofed asset.

In particular, the rating tool:

* Addresses holistically the key megatrends of climate action, resource and circularity, and health, equity and wellbeing.
* Helps buildings meet 12 out of 17 UN Sustainable Development Goals.
* Responds to the Intergovernmental Panel on Climate Change (IPCC) recommendations on the built environment, which resulted in a clear set of benchmarks and practices to drive the built environment to be on track for a 1.5°C trajectory.

### Drives deep decarbonisation

Green Star Buildings aims to drive all buildings to eliminate their direct operating emissions from fuels and refrigerants, be ready for a renewable energy grid during operations, and drastically reduce their embodied carbon during construction. It aims to do this by setting clear targets that become more stringent over time. This approach to deep decarbonisation in Green Star Buildings is known as the Climate Positive Pathway.

This path aims to provide a pathway for Australia to deliver buildings that are fossil fuel free, powered by renewables, highly efficient, built with lower carbon materials and offset with nature. It aims to create supply chains and expertise in the sector to enable policy change in the built environment for new buildings by 2030.

Further information is available in the section [Climate Positive Pathway](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/mandatory-requirements/climate-positive-pathway.md).

### Responds to sustainability megatrends of nature and circularity

Over the past five years, there has been increased focus on nature and circularity and the impacts of these trends on the sector. In particular, the rise of the Taskforce for Nature Related Financial Disclosures (TNFD) and the Kunming-Montreal Global Biodiversity Framework means that nature and circularity are becoming key to governments, tenants, investors, developers and building owners.

In response, and to ensure industry is prepared to respond, Green Star Buildings v1.1 has two new features:

* A new [Nature Positive Pathway](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/mandatory-requirements/nature-positive-pathway.md) for projects registering from 2028 onwards that requires biodiversity net gains and the reporting on nature related impacts. The category has also been reweighted to drive further on-site nature related solutions.
* Two new credits [Design for Circularity](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/28-or-design-for-circularity.md) and [Impacts Disclosure](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/10-or-impacts-disclosure.md) designed to direct more attention to end-of-life impacts and the practice of circularity measurement and improvements in Australia. These credits build on the Circular Economy Leadership Challenge of the previous version.

### Creates clear expectations for new buildings

There is a set of [Minimum Expectations](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/mandatory-requirements/minimum-expectations.md) that must be achieved by all projects to achieve a Green Star rating. The Minimum Expectations aim to ensure all Green Star rated buildings meet a basic definition of a green building (energy efficient, water efficient, good healthy spaces, built responsibly, and on sites that are not critical natural areas). These expectations will assist anyone in understanding the characteristics of a Green Star rated building.

In version 1.1, the Minimum Expectations have been expanded as the definition of a green building evolves. All buildings will also be fossil fuel free, have considered the impacts of refrigerant selection and discloses nature-related metrics. Additional expectations apply to 5 and 6 Star rated buildings as part of the [Climate Positive Pathway](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/mandatory-requirements/climate-positive-pathway.md) and [Nature Positive Pathway](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/mandatory-requirements/nature-positive-pathway.md) and will gradually be applicable to all ratings over time.

### Drives opportunities for supply chain transformation

Green Star Buildings aims to create market demand for innovative, responsible, and low carbon products. It does this by:

* Introducing a new framework for assessing products and materials that rewards products that have lower environmental impact, are transparent, respect human rights, and are lower in carbon content.
* Creating a driver for low carbon products by introducing a requirement that must be met by all buildings to reduce their embodied carbon to achieve a rating.

## <mark style="color:$primary;">Rating tool resources</mark>

Green Star Buildings is composed of the following:

* Submission Guidelines: which contains the requirements and benchmarks (credits) that a building must comply with to achieve a rating.
* Green Star Online: which allows a project team to keep track of their score submit their documentation.
* Calculators and guides: which assist project teams to calculate whether specific thresholds have been met.
* Technical Questions: which help project teams seek clarity or propose alternatives to the information in the submission guidelines or guides.
* Frequently Asked Questions: which provide project teams with answers to questions that are considered relevant to most buildings.
* Guidance documents: developed by the GBCA to assist project teams towards achieving a rating.

All Green Star user resources are accessible online through the [Green Star Manager](https://www.gbca.org.au/greenstar-manager/resources/).

Green Star quotes several standards, external guides, and legislation within each credit. Where referenced, these refer to the currently enforced version (e.g. by the Australian Building Codes Board, or local council), unless otherwise stated.

### Submission Guidelines

The Submission Guidelines (this section) is the collection of all credits applicable to eligible projects. Within this site, all the categories and credits are explained, targets are set, and submission requirements are detailed. The Submission Guidelines contain:

* An overview of the rating tool;
* Information on the certification process;
* The targets and criteria of each credit;
* The requirements for achieving a Green Star Buildings rating; and
* The recommended evidence to include in the Certified submission.

### Green Star Online

Green Star Online is a digital system that must be used when seeking a formal rating. It includes the submission forms, the scorecard, and calculators and allows project teams to keep track of a Green Star submission. The system will help project teams follow the information presented in the Submission Guidelines to guide project teams with compiling their submission. It is also used by the GBCA to provide the results of each round of assessment.

The online system can be accessed via the Submission button for the relevant Green Star Buildings project in [My Projects](https://www.gbca.org.au/greenstar-manager/projects/) in the Green Star Dashboard.

For more information, see the [GBCA's Digital strategy document](https://gbca-web.s3.amazonaws.com/media/documents/green-star-future-focus---improving-green-star-certification-distributed_gV6Muyh.pdf).

### Calculators and guides

Some credits require calculators to demonstrate compliance with the credit criteria. The submission content section of each credit specifies if a calculator is needed. [Calculation guides](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides.md) are also available to assist project teams in completing the calculators, which can be downloaded from the Green Star resources portal. The following table summarises the credits that have calculators.

<table data-search="false"><thead><tr><th width="235.25">Credit</th><th>Description</th></tr></thead><tbody><tr><td>Responsible Products credits</td><td>Allows projects to determine whether their building has the requisite amount of responsible products</td></tr><tr><td>Energy Use – Reference pathway</td><td>Allows project teams to demonstrate that they are reducing their energy consumption against a reference building.</td></tr><tr><td>Upfront Carbon Emissions</td><td>Enables project teams to demonstrate that they are reducing their upfront carbon against a benchmark or a reference building.</td></tr><tr><td>Upfront Carbon Compensation</td><td>Allows project teams to demonstrate the project's upfront carbon emissions have been compensated.</td></tr><tr><td>Refrigerant Systems Impacts (criteria dependent)</td><td>Enables projects targeting the Low Initial Charge or Lower Initial Charge criteria to demonstrate that the project overall has selected low GWP refrigerants.</td></tr><tr><td>Water Use</td><td>Allows project teams to demonstrate that they are reducing their water consumption against a typical building.</td></tr><tr><td>Movement and Place</td><td>Allows project teams to demonstrate that they are reducing their transport related impacts against a typical building.</td></tr><tr><td>Procurement and Workforce Inclusion</td><td>Enables projects to demonstrate the proportion of the project spend that has been dedicated to social procurement initiatives.</td></tr><tr><td>Biodiversity Enhancement</td><td>Enables projects to demonstrate biodiversity net gain.</td></tr></tbody></table>

### Technical Questions

Technical Questions are intended to assist project teams in communicating to a Certified Assessor instances where clarification is needed, or alternative compliance pathways are reviewed and approved by the GBCA. Technical Questions must be submitted online at [My requests](https://www.gbca.org.au/greenstar-manager/requests/) and included in the project's submission.

### Frequently asked questions (FAQs)

A database of Frequently Asked Questions (FAQs) is available to provide additional technical assistance for no additional charge. Using FAQ responses is not mandatory but may save projects time in some instances. Project teams have the option of including FAQs in their submission should the outcome support their project.

Should a project wish to apply a specific FAQ response then it must be stated in the submission and the FAQ must be included as submission supporting documents. Assessors will not refer to the FAQ database as part of the assessment process, other than to verify the validity of an included FAQ. The FAQ database can be found here.

### Guidance documents

GBCA also develops guidance documents that assist project teams towards achieving a rating. These are available in [Other useful resources](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/other-useful-resources.md).

## <mark style="color:$primary;">Developing Green Star Buildings</mark>

Green Star Buildings was developed through a comprehensive engagement process with industry. It had three distinct stages:

* A scoping phase for the Future Focus program, which outlined the program's objectives. This included releasing a scoping paper and hosting four sessions across Australia. The GBCA received over 100 submissions, with a high degree of support for the program's direction.
* A consultation phase for Green Star Buildings, which detailed how the Future Focus program translated to the rating tool for buildings. The GBCA received over 125 submissions with a high degree of support for the revised rating tool, including the revised framework and scope
* A draft phase, where the credits were released for public comment. The GBCA also engaged with 11 projects (the 'Early Access Program') to test the rating tool and obtain feedback during its development.

Green Star Buildings reflects three years of engagement with industry. This extensive engagement process lends confidence that the rating tool reflects the issue and opportunities facing the built environment over the coming decade.

More information on the Governance of Green Star can be found [here](https://new.gbca.org.au/green-star/governance/).

### Developing version 1.1

Version 1.1 is a minor revision to Green Star Buildings v1. The revision ensures continued alignment with GBCA's strategic areas of climate action, nature and circularity to ensure buildings are designed to meet the challenges of the next decade. Updates have also been made based on a review of industry feedback, frequently asked questions, Technical Questions and Assessment Panel comments that have been collated since version 1 was released in 2020. It aims to provide technical amendments, clarifications and improvements.

The proposed updates were published for public consultation in October 2024 to receive additional feedback to inform the final updates. These were also discussed extensively with GBCA's Expert Reference Panels and endorsed by the Green Star Advisory Committee and Advisory Groups.

## <mark style="color:$primary;">Acknowledgements</mark>

Green Star Buildings was developed thanks to the support of hundreds of people and dozens of organisations in industry. From our Future Focus partners to our Expert Reference Panels, from our colleagues worldwide in our Green Building Council network, to our partners in the built environment space, and finally to all our member organisations, we acknowledge your support in delivering this next version of Green Star.

We'd like to highlight and thank those who provided significant time during this process. Their names are listed in the [Acknowledgements](https://greenstarresources.gbca.au/acknowledgements/buildings-v1.1.md) section.

## <mark style="color:$primary;">How Green Star Buildings works</mark>

Green Star Buildings is organised around the following concepts:

* Core credits
* Minimum Expectations
* The Climate Positive Pathway
* The Nature Positive Pathway
* Leadership
* Sector Specific Credits and Pathways

There are eight categories in Green Star Buildings.

* Responsible
* Healthy
* Resilient
* Positive
* Places
* People
* Nature
* Leadership

Each category contains multiple credits. A credit addresses an outcome that improves or has the potential to improve a project's sustainability performance.

Credits are weighted in relation with each other by varying the number of points available. Each credit defines a clear outcome that a project must meet. Where the outcome is verified to have been met, a project will be awarded with the relevant available points.

Once all credits are assessed, the total number of points achieved is tallied, and the project is certified as either a 4, 5, or 6 Star rating.

## <mark style="color:$primary;">Credit overview</mark>

### Performance levels

The performance levels include:

* Minimum Expectation: mandatory outcomes that all projects must meet as part of achieving a rating; these do not earn points.
* Credit Achievement: outcomes that projects must meet to earn at least one point within a credit.
* Exceptional Performance: additional outcomes that can earn the maximum points available in a credit.

Performance levels are typically achieved in sequential order where each level builds on the previous one with independent but cumulative criteria. Projects cannot achieve subsequent performance levels if the preceding level has not been achieved unless explicitly noted (i.e. projects must achieve Credit Achievement in order to achieve Exceptional Performance).

The credit specifies the relationship between levels as either "in addition to" where preceding levels must be achieved before subsequent ones or "in conjunction with" where achieving a higher threshold at one level contributes to achieving the preceding level.

### Points

Credit Achievement and Exceptional Performance levels award up to three points. Most credits are assessed on a pass/fail basis with no partial points awarded. Some credits have stepped points available where whole points are awarded by achieving intermediary benchmarks within a performance level. This is denoted within the relevant credit criteria. The maximum points a credit can earn is six, determined by the highest performance level it includes.

### Credit components

Each credit has the following sections:

<table data-search="false"><thead><tr><th width="217.75">Section</th><th>Description</th></tr></thead><tbody><tr><td>Outcome</td><td>Outlines the result of achieving all the criteria outlined within it.</td></tr><tr><td>Criteria</td><td>Outlines the performance levels and the points available.</td></tr><tr><td>Additional Information</td><td>Provides relevant details including:<br>• Scope of credit defines the boundaries for applying the credit outcome and criteria. If different scopes apply to different building classes, they will be specified here. If no specific guidance is provided, the scope is assumed to be consistent across all building classes.<br>• Stage implementation indicates the development stage at which the credit typically applies.<br>• Synergies with other credits highlights alignment with other credits in the rating tool.<br>• Sustainable Development Goals (SDGs) lists any SDGs relevant to the credit.<br>• Relevant reporting initiatives identifies applicable reporting initiatives for the credit.</td></tr><tr><td>Requirements</td><td><p>Describes the method for demonstrating compliance with the credit criteria.</p><div data-gb-custom-block data-tag="hint" data-style="success" data-icon="dot" class="hint hint-success"><p>Additional information related to fitout scope and tenanted buildings is highlighted in green:</p><p><strong>Fitout scope</strong> provides clarification on how fitout works are considered in the requirements or the extent of fitout works that is required to demonstrate compliance.</p><p><strong>Tenanted buildings</strong> notes requirements for building owners when the building is tenanted. This is applicable to any tenanted spaces within a project.</p></div></td></tr><tr><td>Definitions</td><td>Specifies the definition of specific terms in the Requirements that must be applied, unles agreed with GBCA via a Technical Question.</td></tr><tr><td>Guidance</td><td>The Guidance section in each credit provides supporting information to help project teams comply with requirements. Unlike the credit requirements, project teams do not need to demonstrate compliance with Guidance as it is not mandatory.</td></tr><tr><td>Submission content</td><td>Lists examples of documentation that can be used as evidence. It also states when a calculator must be provided too.</td></tr><tr><td>Supporting information</td><td>Lists any relevant standards referenced in the credit requirements and other resources that may assist project teams in targeting the credit.</td></tr></tbody></table>

## <mark style="color:$primary;">Credits in the rating tool</mark>

The table below summarises the credits, performance levels and points available across each category. Refer to individual credits for detailed requirements.

Performance levels highlighted in <mark style="background-color:blue;">blue</mark> have stepped points available. The credits in the Climate Positive Pathway are highlighted in <mark style="background-color:yellow;">yellow</mark>. The credits in the Nature Positive Pathway are highlighted in <mark style="background-color:green;">green</mark>.

<table data-search="false"><thead><tr><th width="76.75">No.</th><th>Credit</th><th align="center">Minimum Expectation</th><th align="center">Credit Achievement</th><th align="center">Exceptional Performance</th><th align="center">Total points</th></tr></thead><tbody><tr><td></td><td><strong>Responsible</strong></td><td align="center"></td><td align="center"></td><td align="center"></td><td align="center">17</td></tr><tr><td>1</td><td>Industry Development</td><td align="center"></td><td align="center">1</td><td align="center"></td><td align="center">1</td></tr><tr><td>2</td><td>Responsible Construction</td><td align="center">●</td><td align="center">1</td><td align="center"></td><td align="center">1</td></tr><tr><td>3</td><td>Verification and Handover</td><td align="center">●</td><td align="center">1</td><td align="center"></td><td align="center">1</td></tr><tr><td>4</td><td>Responsible Resource Management</td><td align="center">●</td><td align="center"></td><td align="center"></td><td align="center">Nil</td></tr><tr><td>5</td><td>Responsible Procurement</td><td align="center"></td><td align="center">1</td><td align="center"></td><td align="center">1</td></tr><tr><td>6</td><td>Responsible Structure</td><td align="center"></td><td align="center">  <mark style="background-color:blue;">2</mark>  </td><td align="center">  <mark style="background-color:blue;">2</mark>  </td><td align="center">4</td></tr><tr><td>7</td><td>Responsible Envelope</td><td align="center"></td><td align="center">  <mark style="background-color:blue;">2</mark>  </td><td align="center">  <mark style="background-color:blue;">2</mark>  </td><td align="center">4</td></tr><tr><td>8</td><td>Responsible Systems</td><td align="center"></td><td align="center">1</td><td align="center">1</td><td align="center">2</td></tr><tr><td>9</td><td>Responsible Finishes</td><td align="center"></td><td align="center">1</td><td align="center">1</td><td align="center">2</td></tr><tr><td>10</td><td>Impacts Disclosure</td><td align="center"></td><td align="center">1</td><td align="center"></td><td align="center">1</td></tr><tr><td></td><td><strong>Healthy</strong></td><td align="center"></td><td align="center"></td><td align="center"></td><td align="center">14</td></tr><tr><td>11</td><td>Clean Air</td><td align="center">●</td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>12</td><td>Light Quality</td><td align="center">●</td><td align="center">2</td><td align="center">2</td><td align="center">4</td></tr><tr><td>13</td><td>Acoustic Comfort</td><td align="center">●</td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>14</td><td>Exposure to Toxins</td><td align="center">●</td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>15</td><td>Amenity and Comfort</td><td align="center"></td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>16</td><td>Connection to Nature</td><td align="center"></td><td align="center">1</td><td align="center">1</td><td align="center">2</td></tr><tr><td></td><td><strong>Resilient</strong></td><td align="center"></td><td align="center"></td><td align="center"></td><td align="center">7</td></tr><tr><td>17</td><td>Climate Resilience</td><td align="center">●</td><td align="center">1</td><td align="center"></td><td align="center">1</td></tr><tr><td>18</td><td>Operations Resilience</td><td align="center"></td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>19</td><td>Community Resilience</td><td align="center"></td><td align="center">1</td><td align="center"></td><td align="center">1</td></tr><tr><td>20</td><td>Heat Resilience</td><td align="center"></td><td align="center">1</td><td align="center"></td><td align="center">1</td></tr><tr><td>21</td><td>Grid Resilience</td><td align="center"></td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td></td><td><strong>Positive</strong></td><td align="center"></td><td align="center"></td><td align="center"></td><td align="center">32</td></tr><tr><td>22</td><td><mark style="background-color:yellow;">Energy Source</mark></td><td align="center">●</td><td align="center">  <mark style="background-color:blue;">2</mark>  </td><td align="center">  <mark style="background-color:blue;">2</mark>  </td><td align="center">4</td></tr><tr><td>23</td><td><mark style="background-color:yellow;">Energy Use</mark></td><td align="center">●</td><td align="center">  <mark style="background-color:blue;">3</mark>  </td><td align="center">  <mark style="background-color:blue;">3</mark>  </td><td align="center">6</td></tr><tr><td>24</td><td><mark style="background-color:yellow;">Upfront Carbon Reduction</mark></td><td align="center">●</td><td align="center">  <mark style="background-color:blue;">3</mark>  </td><td align="center">  <mark style="background-color:blue;">3</mark>  </td><td align="center">6</td></tr><tr><td>25</td><td><mark style="background-color:yellow;">Upfront Carbon Compensation</mark></td><td align="center"></td><td align="center">1</td><td align="center">  <mark style="background-color:blue;">2</mark>  </td><td align="center">3</td></tr><tr><td>26</td><td><mark style="background-color:yellow;">Refrigerant Systems Impacts</mark></td><td align="center">●</td><td align="center">1</td><td align="center">2</td><td align="center">3</td></tr><tr><td>27</td><td>Low-Emissions Transport</td><td align="center"></td><td align="center">1</td><td align="center"></td><td align="center">1</td></tr><tr><td>28</td><td>Design for Circularity</td><td align="center"></td><td align="center">2</td><td align="center">1</td><td align="center">3</td></tr><tr><td>29</td><td>Water Use</td><td align="center">●</td><td align="center">  <mark style="background-color:blue;">3</mark>  </td><td align="center">  <mark style="background-color:blue;">3</mark>  </td><td align="center">6</td></tr><tr><td></td><td><strong>Places</strong></td><td align="center"></td><td align="center"></td><td align="center"></td><td align="center">7</td></tr><tr><td>30</td><td>Movement and Place</td><td align="center">●</td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>31</td><td>Enjoyable Places</td><td align="center"></td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>32</td><td>Contribution to Place</td><td align="center"></td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>33</td><td>Culture, Heritage and Identity</td><td align="center"></td><td align="center">1</td><td align="center"></td><td align="center">1</td></tr><tr><td></td><td><strong>People</strong></td><td align="center"></td><td align="center"></td><td align="center"></td><td align="center">9</td></tr><tr><td>34</td><td>Inclusive Construction Practices</td><td align="center">●</td><td align="center">1</td><td align="center"></td><td align="center">1</td></tr><tr><td>35</td><td>First Nations Inclusion</td><td align="center"></td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>36</td><td>Procurement and Workforce Inclusion</td><td align="center"></td><td align="center">  <mark style="background-color:blue;">2</mark>  </td><td align="center">1</td><td align="center">3</td></tr><tr><td>37</td><td>Design for Equity</td><td align="center"></td><td align="center">2</td><td align="center">1</td><td align="center">3</td></tr><tr><td></td><td><strong>Nature</strong></td><td align="center"></td><td align="center"></td><td align="center"></td><td align="center">14</td></tr><tr><td>38</td><td><mark style="background-color:green;">Impacts to Nature</mark></td><td align="center">●</td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>39</td><td><mark style="background-color:green;">Biodiversity Enhancement</mark></td><td align="center"></td><td align="center">  <mark style="background-color:blue;">3</mark>  </td><td align="center">  <mark style="background-color:blue;">3</mark>  </td><td align="center">6</td></tr><tr><td>40</td><td>Nature Connectivity</td><td align="center"></td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>41</td><td>Nature Stewardship</td><td align="center"></td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td>42</td><td>Waterway Protection</td><td align="center"></td><td align="center">2</td><td align="center"></td><td align="center">2</td></tr><tr><td></td><td><strong>Leadership</strong></td><td align="center"></td><td align="center"></td><td align="center"></td><td align="center"></td></tr><tr><td>43</td><td>Market Transformation</td><td align="center"></td><td align="center">Up to 5</td><td align="center"></td><td align="center">5</td></tr><tr><td>44</td><td>Leadership Challenges</td><td align="center"></td><td colspan="2" align="center">Per Leadership Challenge.</td><td align="center"></td></tr><tr><td></td><td>Sector Specific Credits</td><td align="center"></td><td colspan="2" align="center">Per Sector Specific Credit.</td><td align="center"></td></tr></tbody></table>

## Core rating tool

The core of the rating tool is made up of 42 credits across seven of the eight categories, known as the core rating tool. These credits account for 100 available points, which is what the rating score is based on.

## <mark style="color:$primary;">Leadership</mark>

The [Leadership](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/leadership-3.md) category has two credits. Points for these credits are in addition to the 100 points available in the core credits.

The two credits in the Leadership category are:

* Market Transformation: Recognises claims for new or innovative technologies or processes, or claims for achievements beyond the core rating tool, not covered by any other credit or leadership challenge. The Submission Guidelines defines the Criteria to make a Market Transformation claim, and up to five different claims can be made in Market Transformation. Each claim is worth one point, meaning a maximum of 5 points can be awarded.
* [Leadership Challenges](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/leadership-challenges.md): Credits that are introduced by GBCA to test new approaches and potential expansion for the rating tools. Leadership Challenges are created by GBCA based on feedback or proposals for industry. New Leadership Challenges must be approved through our governance process. Some Leadership Challenges may require credits in the core of the rating tool to be targeted and achieved before points can be awarded.

Project teams can target all five Market Transformation points by using five separate claims, and there is no limit to the number of Leadership Challenges a project can target.

## <mark style="color:$primary;">Sector specific credits and pathways</mark>

Green Star Buildings is a rating tool designed for use on all habitable building types (except Class 1). However, due to its universal nature, it may need customising or additional guidance from time to time.

Green Star Buildings introduces two methods to account for sector specific issues:

* Sector specific pathways: specific solutions within the core rating tools credits.
* Sector specific credits: additional credits that are optional and apply to specific sectors.

### Sector specific pathways

Sector specific pathways respond to the credit outcome for specific sectors. Pathways don't modify the points value of the core credit. They are always additional, and optional, to the core pathway described in the credit. Pathways can be introduced at any time by GBCA. An example of a specific pathway in the Energy Use credit is provided below:

<div align="left"><figure><img src="https://749968417-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FRL05MQuVhZhkDMQBuGrI%2Fuploads%2FUM18feuQF4X9E3nPB3BP%2FPathways%20diagram.png?alt=media&amp;token=39a72677-c7eb-45d8-8548-38c53e69e361" alt="" width="563"><figcaption></figcaption></figure></div>

### Sector specific credits

Sector specific credits exist outside of the core rating tool. Sector specific credits are assigned a category to help identify where the benefits lie. For example, the credit 'Tenant emissions', which applies to the industrial, commercial, retail, and built-to-rent residential sectors, sits in the 'Positive' category.

Sector specific credits can have Credit Achievements, and Exceptional Performance criteria. A maximum of three points can be assigned for sector specific credit criteria.

Sector specific credits are developed by GBCA in consultation with industry and approved by the Green Star Advisory Committee.

Sector specific issues not covered by the rating tool, and that are not in a sector specific credit, may be submitted as a Market Transformation claim.

## <mark style="color:$primary;">Project types</mark>

### Mixed use

All class types within a building must comply with the Minimum Expectations. Projects using a combination of pathways must meet compliance for each pathway in order to achieve the relevant points. Refer to the relevant credit for further details.

### Fitout scope

Green Star is a holistic rating tool and can be used to rate a base building or a whole building including tenant fitouts. Importantly, because Green Star reflects the building at the time of completion, credits must be awarded based on what has been installed at the time of the submission. Where credits require a project to demonstrate an outcome via a built attribute, they cannot be awarded for a commitment to future installation.

Generally, projects can target credits regardless of the fitout scope of a project. Guidance is provided for credits where fitout scope may affect the outcome. Projects that do not install specific fitout attributes in the majority of the project (such as cold shell projects) are not eligible for some credits where a fitout is required to demonstrate compliance; in this instance an alternative pathway or sector specific credit may be used instead.

In regard to the scope of fitouts, the following applies:

* Purpose built, single use projects (or parts thereof) such as hospitals, schools, residential apartment buildings and hotels are expected to include fitout works when targeting points in the rating tool. Furniture and loose joinery are not included in the scope by default but can be included if the project team wants.
* Tenanted buildings, such as commercial offices or shopping centres, projects may choose to include or exclude tenant fitout works however this must be consistent across all credits. This also means projects can only target points in certain credits with specific attributes if tenant fitout works are included. This may be through built outcomes or leasing clause and guidance mechanisms (refer Targeting points in Credit Achievement and Exceptional Performance below). Most credits can be targeted without relying on tenant engagement, and additional sector specific credits for buildings with tenants are available.

{% hint style="success" icon="dot" %}
Guidance is related to fitout works and tenanted buildings are highlighted in green and are included in the credit requirements.
{% endhint %}

### Meeting Minimum Expectations

Buildings may choose to exclude fitout works from their rating scope for the purposes of meeting the Minimum Expectations. For example, buildings with tenants, such as a commercial office tower or shopping centre, or small retail parts of the purpose built, single use buildings mentioned above, may choose to exclude fitout works from the rating scope. In these cases, a tenancy fitout guide (refer Common definitions) and model lease clauses are required to meet criteria in the Minimum Expectation. This includes the following criteria and credits:

* [Collection of Waste Streams](https://greenstarresources.gbca.au/pages/5KmmU4jSt2v4Zx9qhqlP#id-4.0.1-collection-of-waste-streams) in the Responsible Resource Management credit
* [Exhaust or Elimination of Pollutants](https://greenstarresources.gbca.au/pages/pkgmSd0rhzKfOSqFAlqz#id-11.0.3-exhaust-or-elimination-of-pollutants) in the Clean Air credit
* [Lighting Comfort](https://greenstarresources.gbca.au/pages/n7qoN5PsqR8np2eyU1Lp#id-12.0.1-lighting-comfort) and [Glare from Light Sources](https://greenstarresources.gbca.au/pages/n7qoN5PsqR8np2eyU1Lp#id-12.0.2-glare-from-light-sources) in the Light Quality credit
* [Exposure to Toxins](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/14-or-exposure-to-toxins.md)
* [Metering and Monitoring](https://greenstarresources.gbca.au/pages/RKlOiWJ2RV08GmWWpE9P#id-3.0.1-metering-and-monitoring) in the Verification and Handover credit

Tenancy fitout guides and model lease clauses cannot be used unless expressly identified in the credit guidance section.

### Targeting points in Credit Achievement and Exceptional Performance

The following credits require fitout works to be included to demonstrate that outcomes are met for the majority of the building so that points can be awarded. This means that the relevant building attributes must be installed for at least 80% of the total gross floor area (GFA – refer Common definitions) to demonstrate compliance.

* [Responsible Finishes](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/9-or-responsible-finishes.md)
* [Artificial Lighting](https://greenstarresources.gbca.au/pages/n7qoN5PsqR8np2eyU1Lp#id-12.1.1-artificial-lighting) in the Light Quality credit
* [Exposure to Toxins](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/14-or-exposure-to-toxins.md)

Example

* The building's total GFA is 1000m<sup>2</sup> (100%)
* 350m<sup>2</sup> of the building's GFA is leased to tenants (35%)
* Therefore, to demonstrate compliance in at least 80% of the total GFA, 650m<sup>2</sup> of the common area and at least 150m2 of the tenanted area must meet the requirements.

| Space type                  | GFA (m2) | Minimum direct GFA (m2) compliance |
| --------------------------- | -------- | ---------------------------------- |
| Common area/Untenanted area | 650      | 650                                |
| Tenanted area               | 350      | 150                                |
| TOTAL                       | 1000     | 800                                |

For purpose built projects where less than 20% of the GFA is tenanted, all areas within the building owner's control are to be included in scope of compliance.

Example

* The building's total GFA is 1000m<sup>2</sup> (100%)
* 100m<sup>2</sup> of the building's GFA is leased to tenants (10%)
* Therefore to demonstrate compliance, as 10% of the GFA is tenanted, the remaining 90% of the GFA that is common area must meet the requirements.

| Space type                  | GFA (m2) | Minimum direct GFA (m2) compliance |
| --------------------------- | -------- | ---------------------------------- |
| Common area/Untenanted area | 900      | 900                                |
| Tenanted area               | 100      | 0                                  |
| TOTAL                       | 1000     | 900                                |

Where the project is tenanted but is not installing fitout works for at least 80% of the total GFA or excluding fitout works from the rating, Sector Specific credits will be available to target. These credits will specifically reward green lease clauses, tenant emissions, and upfront carbon emissions from tenancies.

For more information on Best Practice Lease Clauses refer to Better Building Partnership Green Leasing.

### Other credits with requirements related to fitout works

The following credits do not require a percentage of floor space to meet the credit requirements, but have additional information or guidance related to fitout scope or communication with tenants:

* [Dedicated Waste Storage Area](https://greenstarresources.gbca.au/pages/5KmmU4jSt2v4Zx9qhqlP#id-4.0.2-dedicated-waste-storage-area) in the Responsible Resource Management credit
* [Clean Air](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/11-or-clean-air.md)
* [Acoustic Comfort](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/13-or-acoustic-comfort.md)
* [Operations Resilience](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/resilient-2/18-or-operations-resilience.md)
* [Grid Resilience](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/resilient-2/21-or-grid-resilience.md)
* [Energy Source – Pathway B: Tenant Operated pathway](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/22-or-energy-source.md#b-tenant-operated)
* [Energy Use – Pathway A: Reference building pathway](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/23-or-energy-use.md#a-reference-building)
* [Changing Facilities](https://greenstarresources.gbca.au/pages/7isN5iK0Tx6oKSfrNuxt#id-30.0.1-changing-facilities) in the Movement and Place credit
* [Needs Analysis](https://greenstarresources.gbca.au/pages/KQnghatN78BUCiR5QOoX#id-37.2.1-needs-analysis) in the Design for Equity credit

## Applicability

With the introduction of the core rating tool and sector specific credits, projects teams will no longer be able to claim points as 'Not Applicable'. The total number of points the rating score is calculated from is always 100 points. Project teams are encouraged to submit suggestions for sector specific approaches or a Technical Question where they see opportunities for alternative compliance pathways.

If certain attributes are not being installed in the building, the project is exempt from demonstrating compliance with those specific requirements and must only comply with the other relevant requirements at the specified performance level (e.g., where the project does not have heated pools, it is exempt from the Pool covers criteria in the Energy Use – Pathway C: Residential pathway).

## <mark style="color:$primary;">Green Star Buildings – Apartments Pathway</mark>

The Green Star Buildings – Apartments Pathway has been introduced to mark the quality of units in a building, where each unit has been assessed and verified to achieve Green Star outcomes. The pathway is optional for Class 2 multi-unit residential projects including build-to-sell, build-to-rent, affordable housing, community housing and mixed-tenure housing certifying under Green Star Buildings. It does not include student accommodation or hotels.

Projects that target the Green Star Buildings – Apartments Pathway will be registered for a Green Star Buildings rating. They are required to meet the Minimum Expectations, the Climate Positive Pathway (depending on the year of registration and target star rating), the Nature Positive Pathway (also depending on the year of registration and target star rating) and the credits or pathways specific to the Green Star Buildings – Apartments Pathway.

The credits and pathways specific to the Green Star Buildings – Apartments Pathway are published separately. A version of the document will be released for projects registered under Green Star Buildings v1.1.

| Minimum Expectations | Climate Positive Pathway | Nature Positive Pathway | Apartment specific credits or pathways |
| -------------------- | ------------------------ | ----------------------- | -------------------------------------- |
| In this document     | In this document         | In this document        | In Apartments Pathway document         |

## Certifying your project

Green Star certification is a formal process during which a building, fitout, precinct, or home is awarded a rating by an independent, third-party assessment panel. It is a document-based assessment of the project's submission against the requirements of the rating tool.

GBCA operates the assessment and certification process that awards all ratings. This process is managed through a quality management system which complies with the requirements of ISO 9001:2015 for the development, upkeep, and delivery of Green Star certification.

### Eligibility and certification criteria

The eligibility criteria for Green Star Buildings are:

* Building Type: It is a new building or a major refurbishment, but not a single dwelling home, a parking garage, or an uninhabited structure.
* Distinct Boundary: There is a distinct boundary to the building – it has its own address, title, and entrance. It is also the entire building.

In addition to the requirements on scoring to achieve a rating, the following three additional certification criteria apply:

* Timing of Registration and Certification: The Certified rating is achieved within two years from practical completion.
* [Minimum Expectations](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/mandatory-requirements/minimum-expectations.md): The Minimum Expectations are met.
* Star rating requirement: The building achieves at least a 4 star rating.

The GBCA may choose to update eligibility and certification requirements from what is stated in these Submission Guidelines. Please visit the GBCA website for any further changes to eligibility and certification requirements.

### Building Type

Green Star Buildings rates most building types that are new buildings or major refurbishments. In principle:

* Most building types are eligible to be rated, including mixed use developments. All National Construction Code (NCC) space use definitions are eligible for certification apart from single dwellings (class 1) and standalone carparks (NCC Class 7a) and uninhabited structures (Class 10). Class 1 buildings by Volume Home Builders are eligible for Green Star Homes certifications. Standalone residential garages cannot be rated by Green Star.
* New buildings are those where most structural and facade components of a building are new. The building can be on a greenfield or a brownfield site. Projects that are reusing portions of an existing building can be considered new where a significant proportion of the building structure did not previously exist.
* A major refurbishment is where a building, or portion of a building, is vacated and withdrawn from stock for the purpose of replacing plant and services. In these cases, most of the façade or structure is retained, though some works on those are acceptable.
* Existing buildings where refurbishments are made but no services, façade, or structure are modified or introduced may be eligible for certification under the Green Star Performance rating tool.

Project teams are encouraged to contact the Market Engagement team at the GBCA where a project is undergoing refurbishment to determine if the project is an eligible building type or submit an Eligibility Query via the [Green Star Manager](https://www.gbca.org.au/greenstar-manager/requests/) on the GBCA website.

### Distinct boundary

To provide a meaningful result and send a clear message to the market, Green Star Buildings rates the whole building, regardless of the types of uses within it. Only distinct projects are eligible for assessment; project components are not eligible.

Shared building services (such as Heating Ventilation and Air Conditioning plant or water treatment) or amenities (such as waste rooms or bicycle facilities) do not affect the building's eligibility for Green Star assessment.

There are situations where buildings do have a distinct boundary even if they share a space with another building. Buildings that have a combination of separate entrances, distinct titles, and addresses can be rated if they can be easily distinguished from another part of a building. Where towers are joined by an above ground podium, it is all considered as a single structure and can be covered in one certification. Where buildings share a common basement below ground, they are considered two structures and will need their own ratings (unless an approach is agreed upon by the GBCA through an eligibility request before registration– see the [Options for certifying projects](#options-for-certifying-projects)).

### Timing of Registration and Certification

Projects can register for certification at any time prior to practical completion. Projects can register after practical completion, though applicants should note the deadline below.

All projects registered for Green Star Buildings must achieve a Certified rating within two years from practical completion of the project. The Certified rating is awarded after practical completion. Registered projects have the option of undergoing a Designed assessment as an interim step towards certification. The Designed assessment must be done prior to practical completion.

### Minimum Expectations

A project seeking certification must meet the [Minimum Expectations](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/mandatory-requirements/minimum-expectations.md) set out in the Green Star Buildings rating tool. The Minimum Expectations are an expanded list of credits that must be met for the building to be certified. There are also additional Minimum Expectations for 5 and 6 Star rated projects. These are listed under the [Minimum Expectations](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/mandatory-requirements/minimum-expectations.md) section.

### Star rating requirement

The project must achieve at least 15 points for a 4 Star rating. Refer to The Green Star Buildings rating scale for more information.

### Registering for Green Star Buildings

To obtain a Green Star rating, the project must be registered with the GBCA.

Information regarding the Registration process, including fees, can be found online [here](https://new.gbca.org.au/green-star/certification-process/). For further information contact [a member of the Market Engagement team](mailto:MEteam@gbca.org.au).

### Options for certifying projects

Please note that these Submission Guidelines are the basis for certification of a single building.

From time to time, the following certification options may be used to facilitate certification of eligible projects. An applicant must receive approval through a formal Eligibility Query, prior to registration, to use one of these options:

* Volume – this allows eligible applicants with multiple buildings that share a standard design, construction and/or policies to have these common elements assessed once together. Further information can be found [here](https://new.gbca.org.au/green-star/certification-process/volume-certification-pathway/).
* Site-wide credits – this allows eligible applicants to streamline some documentation requirements when there are multiple buildings in the same site boundary seeking Green Star certifications. Further information can be found [here](https://new.gbca.org.au/green-star/certification-process/site-wide-credits-approach/).
* Multiple Building, Single Rating (MBSR) – this allows eligible projects to certify multiple buildings that have the same use, design and delivery contract under one single certification. Further information can be found [here](https://new.gbca.org.au/green-star/certification-process/multi-building-single-rating-mbsr/).

Further requirements such as additional eligibility criteria and alternative certification fees may be applicable. Refer to the GBCA website or contact the GBCA for more information. GBCA reserves the right deem a project ineligible for certification if it has not met the requirements of these options.

### GBCA support

Once a project is registered for a Green Star rating, a Technical Coordinator will be assigned to your project. Technical Coordinators are there to assist project teams through the submission, assessment and certification stages of your project and will interface with your assessor once you have submitted. They are the first point of contact for any questions you might have regarding your registered project and certification. Technical Coordinators, however, do not provide design advice or guidance to project teams on how individual projects may provide solutions to meeting the requirements in the Submission Guidelines.

For further information about the roles of the GBCA in relation to Green Star and resources available to project teams can be found [here](https://new.gbca.org.au/rate/rating-system/roles-resources-overview/) and on the [GBCA resources portal](https://www.gbca.org.au/greenstar-manager/resources/).

## Submission and assessment process

Submissions are managed through the Green Star Online submission portal where project teams submit for assessment by a Certified Assessor the information about how they have met the Submission Guideline requirements and supporting evidence to demonstrate their claims.

Once project teams submit, GBCA coordinates a third-party assessment with a Certified Assessor. This process occurs each time a submission takes place for both Designed assessments and Certified rating assessments.

Each project has the option of up to two rounds of assessment. The second round is an opportunity to address any comments provided by the Certified Assessor in the first round, or target additional credits. The diagram below outlines the typical process of assessment.

<div align="left"><figure><img src="https://749968417-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FRL05MQuVhZhkDMQBuGrI%2Fuploads%2FF04BpoZpaNblsJltCYbW%2FAssessment%20process.png?alt=media&amp;token=6027bb97-0ac7-4e69-8f26-561a49b67ff7" alt=""><figcaption></figcaption></figure></div>

Refer to the [Assessment and Certification webpage](https://new.gbca.org.au/green-star/certification-process/) for more information. [Training](https://new.gbca.org.au/courses-events/about-education/green-star-courses/) is also available to support project teams as they prepare their submission documentation for assessment.

### Submission types

There are two types of submissions for assessment within Green Star Buildings:

* Designed submission – this is optional for project teams
* Certified submission – this is mandatory to achieve a Green Star rating.

These are assessed independently from each other and require separate submissions.

### Designed submission

The Green Star Designed assessment is an optional assessment of the design progress to date. The purpose of this assessment is to have an Assessor provide feedback on how the project is tracking to achieving the credit criteria targeted for the future Certified submission and assessment. There is no minimum number of credits for submission.

Project teams may nominate the project stage for which the Designed submission is made however this must be prior to practical completion. Project teams generally find it most beneficial to undertake the Designed assessment at the detailed design or tender stage to ensure the project design is on track to achieve the Certified rating before proceeding to construction. Projects must provide evidence in their submission of their intended approach to achieving the credit.

Refer to the [Guidance for Submitting for Designed Assessments](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/other-useful-resources/guidance-for-submitting-for-designed-assessments.md) for further information.

### Certified submission

The submission for the Certified assessment must demonstrate that the requirements have been achieved for the building, as constructed. Supporting documentation is required to back up the claims made in the Submission Forms. Under the Submission Content section in each credit, a list of recommended supporting documentation is provided.

Unless explicitly noted, the evidence submitted should exist in the form of documentation produced as part of the design, procurement, construction, or commissioning process. Project teams are discouraged from producing documentation specifically for Green Star if this can be avoided.

### Documenting a building's achievements

The credits contain criteria that must be achieved for a point to be awarded. To be awarded a credit within the Green Star Buildings rating tool, compliance must be demonstrated through documentation. The project team provides this documentation demonstrating these achievements. The documentation is used by the GBCA's independent Certified Assessors to establish whether the credit criteria have been met. The independent assessment phase is fundamental to the integrity of the Green Star rating system.

Except for the calculators, Green Star Buildings does not prescribe what documentation must be provided. Instead, this is left to the project team to prove evidence of compliance. The credits do, however, provide a suggested list of evidence which project teams may wish to use as a guide.

The documentation requirements for the Green Star Buildings rating tool do not encourage the submission of large volumes of documentation, but rather a selection of relevant information that clearly demonstrates compliance for each claim made in the Submission. Project teams are recommended to provide direct reference to the part of the documentation that demonstrates compliance. For example, the front page and relevant pages of a report are acceptable rather than an entire document. These requirements are detailed in these Submission Guidelines, on a credit-by-credit basis. Refer to the [Guide on how to prepare a Green Star Submission](https://gbca-web.s3.amazonaws.com/media/documents/green-star-submissions-290518.pdf) for further guidance.

### General submission requirements

To ensure the Certified Assessor can progress the assessment in a timely way, GBCA strongly recommends project teams submit the following documentation as part of their submission to provide general information about the project:

* A markup of the proposed Green Star project boundary. This sets the project boundary to be applied for all credits targets unless noted otherwise in the credit (i.e. the credit requirements refer to a boundary that differs from the project boundary) or if approved via a Technical Question.
* Eligibility Queries (if submitted and relevant)
* ESD specification
* Architectural and building services drawings or design reports

### List of evidence

Unless explicitly noted, the evidence submitted should exist in the form of documentation produced as part of the design, procurement, construction, or commissioning process. Project teams are advised to use such documents as evidence for justifying claims. Below are some examples of frequently used documentation.

* Certificate - An official third-party document that certifies that an individual or organisation possesses the qualifications sought in the relevant credit.
* Confirmation - An official letter from the relevant party that has authority to confirm an aspect of compliance. The letter must state, recite, or confirm compliance with the Credit Criteria or part thereof. The letter must be project-specific, signed, dated and on company letterhead, as per ISO 9001. Also referred to as: 'Statement' or 'Letter of Confirmation'.
* Contract(s) - Full copies or extract(s) from the contract(s) (as required) that clearly stipulate compliance with the Credit Criteria. Relevant sections must be highlighted to allow for quick identification of the relevant clauses.
  * Terminology that dilutes compliance (e.g., 'or equivalent'), is not acceptable. Clauses must stipulate that any deviation from the criteria be approved by the professional who can enforce adherence to design intent
* Drawings - Drawings in Green Star refer to architectural and engineering plans, elevations and sections that are generally used to locate items in a building.
  * All drawings must be on official letterhead, contain the project or the building's name, the version number, and the change log. Where a drawing is typical to a number of buildings or floors, the drawing must clearly state that this is the case, and nominate the typical buildings, or typical building type. The drawings must clearly state what type of drawing they are.
  * When submitting drawings for the 'Certified rating (which rates the finished construction), the drawings should reflect what has been installed in the building and are drawn, or verified by the contractor to be true, after construction has finished. 'For Construction' drawings are accompanied by formal confirmation from the head contractor or other relevant professional(s) that the 'For Construction' drawings depict the site as-built conditions. If the drawings are from an earlier stage, the submitter must state why these drawings are appropriate when using them as justification.
* Meeting Schedule – A document that lists the dates, purpose, and attendees of project team meetings.
* Photographic Evidence – A photograph or set of photographs that demonstrate that a design feature has been installed. The evidence must clearly show the design feature, the context and location where it is installed, that it is part of the registered project and give a date that the photograph(s) was taken.
* Report – An official report from a relevant professional that provides an analysis and draws a conclusion on an aspect of the design. The report must be project-specific, dated, and on company letterhead.
* Specification(s) – Written descriptions of the works that are to be performed for the project. Specifications are used to delineate the required works, the requirements for a product's characteristics, and the verification procedures for the installed item, or the works performed. They also list legal requirements and quote or name applicable standards.
  * When used to justify a claim, all specifications must be on official letterhead, contain the project's, or the building's name, and the version number. Where a specification is typical to several buildings, the specification must clearly state that this is the case, and nominate the typical buildings, or typical building type.
* Tender Documentation – Where tender documentation is used to justify a submission, the project is required to provide either specifications, or drawings, or a contract, or other supporting evidence that forms part of the tender package. In such a case, the project must ensure that the evidence provided complies with the descriptions as detailed in this section.
* Third-Party Documentation – Full copies or extracts, as stipulated, from public, non project-specific documents. When submitted as evidence, the relevant elements of the document must be clearly identified with colour (e.g., circled or highlighted). Examples may include standards or local planning regulations.

## Achievement scale

### Points in Green Star Buildings

A point in Green Star Buildings is equivalent throughout the rating tool. That is, a point in the Positive category is equivalent to a point in the Nature category.

The point(s) assigned to individual credits are representative of the credit's worth when assessed against five criteria:

* Control of outcome: to place higher reward on credits that deliver guaranteed outcomes. Process-orientated credits would score lower in this metric, while credits that rely on delivering physical attributes would score higher.
* Scale of impacts: to place higher reward on credits that have a larger impact in terms of scale. Credits that are narrowly focused score low, whereas credits that have multiple benefits score high.
* Transformation potential: to place higher reward on credits that drive market transformation across industry.
* Length of impact: to place higher reward on credits that deliver long-lasting impacts. A credit that relies on future operational maintenance will score low, whereas a credit affecting a long-lasting building system would score high.
* Value generation: to place higher reward on credits that deliver broad value and benefits beyond the building owner. Credits that are more valued by stakeholders and society will score higher.

The score distribution across the categories is as follows:

| Responsible | Healthy | Resilient | Positive | Places | People | Nature |
| ----------- | ------- | --------- | -------- | ------ | ------ | ------ |
| 17%         | 14%     | 7%        | 32%      | 7%     | 9%     | 14%    |

The final composition of the categories highlights the priority areas in industry. The primary percentage of points continues to be on direct environmental impacts, with a specific focus on carbon emissions. In general, categories and credits that have direct qualitative outcomes score higher (e.g., credits in the Positive category) compared to credits that are more process based.

### The Green Star Buildings rating scale

The Green Star rating is determined by comparing the percentage of available points achieved out of the 100 total available points. The rating scale shown below details the percentage thresholds for the Star ratings awarded.

* **Legal compliance** – The building is compliant with legislation (National Construction Code – 2019 or later)
* **Good Practice** – The building meets the Minimum Expectations of good practice – energy and water efficient, good indoor environment quality, and built to operate well.
* **4 Star** – reflects a Best Practice environmental performer. It builds on the Minimum Expectations to deliver a building that is either climate positive or a higher performer in energy, water, and health related issues **(at least 15 points)**
* **5 Star** – demonstrates Australian Excellence by being a high environmental performer that addresses social issues relevant to the building owner **(at least 35 points)**
* **6 Star** – showcases World Leadership. It has been built to be a highly efficient building fully powered by renewables that addresses a significant number of environmental and social issues, and contributes to the community **(at least 70 points)**

## Calculating your score

The project's score is the total number of points achieved in the Core rating tool, the sector specific credits, and any Leadership claims. Once Minimum Expectations are met, and the project meets or exceed the star rating score benchmark, you can claim the desired rating.

It is possible to add up to more than 100 points, but only 100 points will be assessed and awarded.

The following table gives some examples:

|                         | Score  |
| ----------------------- | ------ |
| Minimum Expectation     | Met    |
| Core rating tool        | 60     |
| Sector specific credits | 7      |
| Leadership              | 8      |
| **Total score**         | **75** |

## Promoting your Green Star project registration and certification

### Marketing your registered project

Once registration is confirmed by the GBCA, you are permitted to market your Green Star project as targeting a Green Star rating but cannot use the Green Star Certified logo.

### Marketing your Green Star Buildings 'Certified' rating and 'Designed' assessment

A Green Star Buildings Certified rating signifies a high degree of achievement in sustainable practice for the design and construction of a building. Green Star Buildings does not award certification to the design of the building – the rating is awarded for the construction of the building. To receive the rating, a building must submit documentation to the GBCA that demonstrates the benchmarks in the rating tool have been achieved. The assessment of the submission is carried out by third-party Assessment Panel.

An optional Designed assessment award, known as the "Record of assessment", is available for marketing purposes prior to construction. The Designed assessment is not a rating, rather an indication that the project is on track for a Certified rating.

### Green Star Designed

Green Star Designed is intended to signify a project's progress towards a Certified rating. It may be awarded following assessment of design stage documentation and entitles an applicant to use the Green Star Designed logo for marketing purposes.

Use of the 4, 5 or 6 achievement levels will not be part of the award. However, in communications about the project the owner may say words to the effect: 'The building's design has been assessed and the project is on track to achieve a 6 star Green Star Certified rating'.

The Green Star Designed logo may be used in collateral, marketing materials, but not permanent ones like plaques or decals. The Green Star Designed logo does not contain the rating level.

### Green Star Certified

The Green Star Certified rating represents a certification that the building's design and construction complies with the requirements of the rating tool.

The award of a Certified rating entitles the applicant to use the Green Star Certified logo including with the designated star rating – 4, 5 or 6 – for marketing purposes. GBCA's Marketing Kit and Style Guide apply to all uses of GBCA's trademarks.

### Green Star trademarks

Green Star and the Green Star certified logo are trademarks owned by Green Building Council of Australia (GBCA). They constitute valuable intellectual property and are protected by law. Any unauthorised use of the trademarks constitutes infringement of our rights and may result in legal action.

### Marketing rules and style guide

This guide sets out the rules for the use of the trademarks and provides marketing ideas to help promote your Green Star project, at registration, Designed assessment and Certified rating. The Marketing Kit and Style Guide is can be found [here](https://new.gbca.org.au/green-star/promoting-your-green-star-project/).

## Rating tool updates

While the rating tool will be updated from time to time, project teams are only subject to the Submission Guidelines for the rating tool that they register for, or if the project team chooses, a later version. Project teams are not subject to clarifications or amendments made as part of a revision, unless explicitly stated by the GBCA. Any release of the Submission Guidelines will always have any relevant supporting material available for it, such as scorecards, calculators, and calculation guides. The rating tool can be updated as follows:

* Ad hoc: additions to the rating tool that are additive in nature such as Sector Specific Credits or Pathways and Leadership Challenges. The changes are noted but are not considered a revision.
* Maintenance: occur when an obvious error in the rating tool has been identified. These revisions (e.g. Rev. A) are additive.
* Corrections: occur when a significant error in the rating tool has been identified. These revisions (e.g. Rev. A) are corrective.
* Minor revisions: a new version of the same rating tool, with minor credit introductions and new or amended credit criteria or requirements. These ensure the rating tools are up to date, e.g., Green Star Buildings v1 to Green Star Buildings v1.1.
* Major revisions: Significant changes to the rating tool of both a technical and structural nature to align rating tools with new trends or revised GBCA strategy. Results in the release of a new full version e.g., Green Star – Design & As Built to Green Star Buildings, or a full version change (v1 to v2).

### Ad Hoc

Ad Hoc changes are additive in nature and involve releasing additional criteria, sector specific information, or leadership challenges that do not impact the current information in the rating tool but expand on it. They can be used by project teams but are not required to achieve a certification. Current guidance in the rating tool is not impacted. Ad Hoc releases will include:

* Sector specific credits
* Sector specific pathways
* Leadership / Innovation Challenges

Ad hoc changes are dated, but there is no change of versioning to the rating tool. These additional credits and pathways can be published in separate guides or through our FAQ system and will be available through Green Star Online.

Reviews and updates to Guidance, Definitions and Supporting Information may occur from time to time should it be deemed necessary. These updates will not change the compliance requirements for certification and will not result in an updated version of the rating tool. These updates may include:

* Clarification of existing guidance
* Additional Guidance or Reference materials
* Updated definitions
* Updated standards

If an error is found in a calculator or guide, the GBCA reserves the right to make a correction applicable to all registered projects. These are applicable as they correct critical elements which do not accurately reflect the benchmarks or requirements in published credits.

Green Star quotes several standards, external guides, and legislation within each credit. Where referenced, these refer to the currently enforced version (e.g., by the Australian Buildings Code Board, or local council), unless otherwise stated.

### Maintenance

Maintenance revisions occur when an obvious error in the rating tool has been identified. These revisions are additive in nature. The changes do not negatively impact on projects registered prior to the date of the change, though all registered projects are informed of the change. They include:

* Additional guidance and non-mandatory general pathways
* Spellings and grammar corrections
* Changes to introduction, guidance, definitions, standards, references, and documentation
* Errors in calculators
* Amendments to documentation requirements

Maintenance revisions performed within the first 9 months of a major rating tool release can also include changes to credit criteria and compliance requirements, where the changes are in line with previously communicated outcomes and strategy.

Maintenance revisions are noted by a letter suffix, e.g., 1.0 Rev. A. Revisions are noted in the changelog but are not highlighted directly in the text of the rating tool. Superseded versions won't be available for download.

Project teams can contact GBCA if they believe they are negatively impacted, and GBCA will assist them in this scenario.

**GBCA notes this edition of the Submission Guidelines is a Maintenance review, denoted by 'Revision A' or in some cases 'RevA' or 'rA'.**

### Corrections

These occur when a significant error in the rating tool has been identified. The revisions are corrective in nature. They can change credits, credit criteria, compliance requirements, calculation methodology, and guides. Corrections are retrospective. That is, they apply to all current and future registered projects. Corrections are noted in the submission guidelines and noted by a letter suffix, e.g., 1.0 Rev. A. Corrections can be issued at any time.

### Minor version

Minor revisions result in the release of a revised tool such as this revision, version 1.1. The purpose of these updates is to improve the useability of the rating tool and to continue to promote sustainable outcomes. Minor updates may include:

* Readability amendments
* Minor introduction or deletion of criteria and credits
* Updates to compliance requirements and changes in strategy for how credits are approached
* Updates to benchmarks
* Amendments to documentation requirements and additional guidance to account for changes in the certification process

The updates will be based on a continuous review of feedback received throughout the year from project teams, assessment panel and industry. Feedback sources include Technical Questions, Assessment Panel comments, communication from project teams, communication from industry and working group feedback.

Where significant change to the rating tool is necessary within a minor update, the GBCA will engage in public consultation and all significant changes will undergo an endorsement process through the Green Star Advisory Committee and Advisory Groups.

Minor versions only apply to projects that register under that version.

### Major version

Major version update may include:

* Major amendments to benchmarks
* Introduction or deletion of criteria, credits, or categories
* Major amendments to credit values or scoring for 4, 5 and 6 Star ratings

The release of a major version will be based on a review of changes in priorities and benchmarks in the built environment.

Major releases will involve significant engagement with industry, as well as a review of the achievements through innovation, and a review of certified projects to date. The revisions will result in the release of a revised tool e.g., v2, or a rebrand. Major versions only apply to projects that register under that version.

## Common definitions

Definitions are included in specific credits and must be applied to the credit requirements. Definitions that are commonly applied across the rating tool are included below.

[**Base building**](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#base-building)

[**Building owner's control**](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#building-owners-control)

[**Cold shell**](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#cold-shell)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#gross-floor-area-gfa)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#design-occupancy)

[**Net Lettable Area (NLA)**](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#net-lettable-area-nla)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#project-boundary)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#regularly-occupied-area)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#site-boundary)

[**Tenancy fitout guide**](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#tenancy-fitout-guide)

## Additional information

### Project registration upgrade

In planning for release of new rating tools under the Future Focus program, GBCA provides the market with a transition period during which projects can register under either version of the tool. This gives the market time to familiarise itself with the latest revision of the rating tool.

There will be a 6-month registration transition period for Green Star Buildings v1.1, i.e., from the date that registrations open for version 1.1, registrations under version 1 will continue to be accepted for a further 6 months. Projects that are currently registered to an earlier version of Green Star Buildings and any version of Green Star – Design & As Built, or legacy rating tools, are eligible to upgrade to Green Star Buildings v1.1 and it is not mandatory to upgrade to version 1.1. Project teams cannot revert to older versions of the rating tool and can only upgrade to the most current version. Project teams may formally apply to upgrade rating tools by contacting [the Market Engagement team](mailto:meteam@gbca.org.au).

### Credit substitutions

Project teams can substitute certain credits between different rating tools or different versions of the same rating tool. For Green Star Buildings v1, the GBCA have published a credit substitution guide on the [Green Star resources portal](https://www.gbca.org.au/greenstar-manager/resources/), which lists credits and features that may be substituted for use in Green Star Buildings v1. For credits that are not listed in the Matrix or for use in other rating tools, a Technical Question must be submitted to the GBCA for approval.

### Courses and training

The GBCA is a leading provider of training on sustainable practices in the built environment. As part of its mission, the GBCA supports the property and construction industry with training on Green Star and has trained more than 15,000 people.

The GBCA's continuing professional development (CPD) program supports this mission and is designed to provide practitioners with vital knowledge on the implementation of Green Star tools, strong networks in the industry, and news of the latest innovations, technologies, and trends.

To encourage sustainability initiatives throughout a project, having a Green Star Accredited Professional on a project is rewarded in the Green Star Accredited Professional credit.

The first step of becoming a Green Star Accredited Professional is to attend a [Green Star Training Course](https://new.gbca.org.au/get-involved/professional-development/). Following the course there is the opportunity to join the CPD program.

The GBCA CPD program has two types of accreditation:

* Green Star Associate for those needing a basic level of Green Star knowledge
* Green Star Accredited Professional with specialisations based on the rating tool. Currently this includes Green Star – Design & As Built, Green Star – Performance, or Green Star – Communities, for those working on Green Star, needing an advanced level of knowledge and experience. The specialisations will be updated based on the Future Focus program. Please check the GBCA website for updates.

For information on GBCA training courses, the [CPD program](https://new.gbca.org.au/get-involved/professional-development/CPD-program/), and how to become a Green Star Accredited Professional, please refer to the [Professional Development](https://new.gbca.org.au/get-involved/professional-development/) section of the GBCA website.

### Responsible Products program

Several credits in Green Star Buildings require product-specific third-party initiatives such as ecolabels or chain of custody certificates. These initiatives are accredited through our Responsible Products program. More information on the program can be found [here](https://new.gbca.org.au/green-star/the-responsible-products-program/).

### Feedback

The GBCA encourages feedback on all Green Star rating tools. Please submit your feedback [here](https://www.gbca.org.au/pam.asp) for consideration. All feedback related to rating tools is reviewed as part of any new rating tool development process.

## <mark style="color:$primary;">Version control</mark>

| Version         | Date       | Description                                 |
| --------------- | ---------- | ------------------------------------------- |
| 1               | 29/10/2020 | Initial release                             |
| 1: Revision A   | 06/07/2021 | Maintenance and correction revision         |
| 1: Revision B   | 10/12/2021 | Maintenance and correction revision         |
| 1: Revision C   | 18/10/2023 | Minor clarification and correction revision |
| 1.1             | 21/10/2025 | Minor revision                              |
| 1.1: Revision A | 17/12/2025 | Maintenance and correction revision         |


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/introduction.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
