> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/leadership-challenges/buildings-as-material-banks.md).

# LC7 | Buildings as Material Banks

Leadership Challenge - Developed in partnership with Kennett Builders and dsquared Consulting

&#x20;***Points:** 2*

## <mark style="color:$primary;">Outcome</mark>

The project encourages reuse of building elements at the end of life.

## <mark style="color:$primary;">Rating Tool Applicability</mark>

* Green Star Buildings
* *Green Star – Design & As Built*

## <mark style="color:$primary;">Why is this Leadership Challenge Important?</mark>

The built environment is a major contributor to climate change and resource consumption, accounting for approximately 50% of all materials consumed. Construction and demolition waste from buildings are also responsible for 40% of solid waste.¹ This use of materials and resources and the high production of waste is a product of the linear economy of take, make and dispose. A move towards a circular economy can change this system to a closed loop system where the aim is to retain the value of resources and materials.

The concept of buildings as material banks (BAMB) reframes buildings to be repositories of high value materials that can be reused rather than becoming waste at the end of the building's life, aligning with the circular model. This requires materials in a building to be documented so that its value is defined for reuse.

Similarly, designing buildings to be able to be disassembled and a disassembly plan increases the potential for building elements to be reused as the value of the products and materials are retained when the building is deconstructed.

This Leadership Challenge aims to incentivise buildings to be designed to maximise the potential for its elements to be reused at its end of life.

¹ 2022 Global Statue Report for Buildings and Construction, United Nations Environment Programme

## <mark style="color:$primary;">Criteria</mark>

<mark style="color:$success;">**Credit Achievement — 1 point**</mark>

* [#lc6.1.1-recovery-and-reuse-assessment](#lc6.1.1-recovery-and-reuse-assessment "mention"): The recovery and reuse potential of the building's materials is assessed
* [#lc6.1.2-material-bank](#lc6.1.2-material-bank "mention"): A material bank of key materials for the building is developed

<mark style="color:$success;">**Exceptional Performance — 1 point**</mark>

In conjunction with the *Credit Achievement*:

* [#lc6.2.1-disassembly-plan](#lc6.2.1-disassembly-plan "mention"): A disassembly plan for the building is provided

***

## <mark style="color:$primary;">Additional information</mark>

#### Stage implementation

**Strategy** · **Brief** · **Concept** · **Design** · Tender · **Construction** · **Handover** · Use

#### Synergies with other credits

* Responsible Procurement
* Responsible Products (Structure, Envelope, Systems and Finishes)
* Upfront Carbon Emissions / Reduction
* Life Cycle Impacts
* Design for Circularity

#### Sustainable Development Goals

* **Goal 9:** Industry, Innovation and Infrastructure
* **Goal 11:** Sustainable Cities
* **Goal 12:**  Responsible Consumption and Production
* **Goal 13:** Climate Action

***

## <mark style="color:$primary;">Requirements</mark>

### <mark style="color:$success;">Credit Achievement</mark>

The projects must comply with **both** of the following criteria:

* Recovery and Reuse Assessment
* Material Bank

#### LC7.1.1 Recovery and Reuse Assessment

During concept or design development, an assessment is undertaken to explore the future recovery and reuse potential of 3 materials within the top 5 materials (by mass) in each of the following layers of the building:

* Structure
* Envelope
* Finishes
* Systems

At a minimum, the assessment:

* Evaluates the potential for future recovery and reuse for the identified materials against the principles in ISO 20887:2020 Design for disassembly and adaptability — Principles, requirements and guidance;
* Identifies solutions to maximise recovery and reuse at the end of life of the building;
* Provides a justification for the materials that have been identified to be unable to be recovered and reused against the principles in ISO 20887.

Refer Guidance section for further details on ISO 20887.

#### LC7.1.2 Material Bank

The project team develops a material bank that includes at least 6 of the materials from the Recovery and Reuse Assessment. At least 2 of the materials is used in the structure of the building.

At a minimum, the material bank must include the following information:

* Product name
* Manufacturer or Supplier
* Dimensions
* Material properties
* Location in building
* Expected design life
* Installation data
* Repair and refurbishment information
* Deconstruction instructions
* End-of-use instructions
* Relevant data sheets provided by the manufacturer or supplier such as product safety data sheets and environmental product declarations

The material bank is provided to the building owner and the facilities management in a digital and hard copy format as part of the building user information. The information can be updated and edited by the facilities management team or other appropriate stakeholder groups. Information on where the material bank can be located (both a digital and hard copy) is included in the building user information.

The material bank is integrated with the building information modeling (BIM).

### <mark style="color:$success;">Exceptional Performance</mark>

In addition to the *Credit Achievement*, the projects must comply with the following criteria:

* Disassembly Plan

#### LC7.2.1 Disassembly Plan

The project team develops a disassembly plan for the building for at least the building's structure and one other building layer (ie. envelope, finishes or systems).

At a minimum, the plan includes:

* A list of the products or materials that can be disassembled, noting their physical properties, material properties, location and design life;
* Data sheets that are directly provided by the manufacturer or supplier such as product safety data sheets and environmental product declarations;
* Details on the manufacturer or supplier for the products or materials;
* Instructions on how to deconstruct the elements including steps for dismantling including sequencing and safety measures, a list of tools and equipment needed for disassembly and whether testing and recertification of material properties is required;
* Instructions on storage and recovery

Information from the building's material bank may be used however the relevant disassembly, storage and recovery instructions for each product or material should be clearly linked.

The disassembly plan is provided to the building owner and the facilities management in a digital and hard copy format as part of the building user information. Information on where the disassembly plan can be located (both a digital and hard copy) is included in the building user information.

***

## <mark style="color:$primary;">Guidance</mark>

**ISO 20887:2020 Design for disassembly and adaptability — Principles, requirements and guidance**\
The principles are outlined in Clause 5.3 of ISO 20887 including ease of access to components and services, independence, avoidance of unnecessary treatments and finishes, supporting re-use (circular economy) business models, simplicity, standardisation and safety of disassembly.

It is expected that all these principles are considered however in some situations, some of the principles may not be applicable as noted in Clause 4.3.1 of ISO 20887. In such cases, an explanation to justify why the noted principles are not relevant is to be provided.

***

## <mark style="color:$primary;">Submission content</mark>

#### Submission for this credit must contain:

* Submission form through Green Star Online
* Evidence to support claims made in the submission

#### Recommended evidence

The following list of evidence serves as a guide for the Certified submission and is not exhaustive. Project teams are not required to provide all of the listed items and alternate forms of documentation can be used to demonstrate compliance. The key requirement is that evidence is provided to support each claim.

* Recovery and Reuse Assessment
* Material bank
* Evidence that demonstrates the material bank and/or disassembly plan has been provided to the building owner and the facilities management in the specific formats
* Evidence of BIM integration of the materials bank
* Disassembly plan
* Extracts of the building user information

Refer to the Guidance for Submitting for Designed Assessment available on the Green Star resources portal for further information on submitting evidence for the Designed assessment.

***

## <mark style="color:$primary;">Supporting information</mark>

The following resources support this credit:

* Buildings as Material Banks
* ISO 20887:2020 Design for disassembly and adaptability — Principles, requirements and guidance
* How to write a Building Disassembly Plan, Built and Coreo


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/leadership-challenges/buildings-as-material-banks.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.