> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/other-useful-resources/above-and-beyond-approach.md).

# Above and Beyond approach

{% hint style="warning" %}
**Release 1 - 21/04/2026**&#x20;

* Initial release.

[#version-control](#version-control "mention")
{% endhint %}

Guidance for projects with a controlled action seeking Green Star certification

Applicable to the following rating tools:

* Green Star [Green Star Buildings](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings.md) (all versions)
* Green Star Design & As Built (all versions)

***

<table data-search="false"><thead><tr><th>Document sections</th></tr></thead><tbody><tr><td><a data-mention href="#authorisation-and-disclaimer">#authorisation-and-disclaimer</a></td></tr><tr><td><a data-mention href="#introduction">#introduction</a></td></tr><tr><td><a data-mention href="#part-1-understanding-mandatory-requirements-in-green-star-when-impacting-nature">#part-1-understanding-mandatory-requirements-in-green-star-when-impacting-nature</a></td></tr><tr><td><a data-mention href="#part-2-requesting-to-use-the-above-and-beyond-approach">#part-2-requesting-to-use-the-above-and-beyond-approach</a></td></tr><tr><td><a data-mention href="#part-3-the-above-and-beyond-approach">#part-3-the-above-and-beyond-approach</a></td></tr><tr><td><a data-mention href="#epbc-compliance">#epbc-compliance</a></td></tr><tr><td><a data-mention href="#integrated-conservation-management-plan-icmp">#integrated-conservation-management-plan-icmp</a></td></tr><tr><td><a data-mention href="#scoring-and-evidence">#scoring-and-evidence</a></td></tr><tr><td><a data-mention href="#assessment">#assessment</a></td></tr><tr><td><a data-mention href="#appendix">#appendix</a></td></tr></tbody></table>

## <mark style="color:$primary;">Authorisation and disclaimer</mark>

### 1. Approval authority

{% hint style="warning" %}
**The GBCA is the sole authority to determine whether a project may use the&#x20;*****Above and Beyond approach*****&#x20;to qualify for a Green Star rating.**
{% endhint %}

* Projects are **not** eligible to use this approach unless written approval has been granted by GBCA.
* Applicants should engage GBCA as early as possible. Failure to do so may result in significant delays and a pause in any assessment activity.
* Any advice provided by third parties will be disregarded by GBCA and may result in the project being ineligible for a Green Star rating.

GBCA reserves the right, at its sole discretion, to deny eligibility under this criterion.

### 2. Approval process

{% hint style="warning" %}
**The approval process for the&#x20;*****Above and Beyond approach*****&#x20;may take several months.**
{% endhint %}

* Applicants concerned about meeting mandatory requirements (Conditional Requirements or Minimum Expectations) should contact GBCA before project registration (via an Eligibility Query), or immediately after an issue has been identified (via a Technical Question).

***

## <mark style="color:$primary;">Introduction</mark>

### Purpose of this document

This document provides guidance to projects that are otherwise considered ineligible for a Green Star rating due to impacts on sites with high ecological value. Such impacts are usually identified through the Environmental Impact Assessment (EIA) and approvals process and may be permitted by state or federal authorities, including projects determined as ‘controlled actions’ under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).

The guidance outlines an alternative pathway – the Above and Beyond approach – for projects seeking a Green Star Buildings (all versions) or Green Star – Design & As Built (all versions) rating. A separate version of this guidance will be developed to address the specific requirements of the Green Star Communities v2 rating tool.

The Above and Beyond approach enables projects to demonstrate that they have gone significantly beyond regulatory requirements to avoid, minimise, compensate, and ultimately enhance ecological values in line with the conservation and mitigation hierarchy. Projects that can show they are delivering outcomes greater than those required under approvals may, with GBCA approval, be considered eligible for a Green Star rating. This approach does not reinterpret or replace statutory requirements.

{% hint style="warning" %}
**Use of this approach is not automatic.** Projects must obtain written approval from GBCA, and eligibility will only be determined through GBCA’s formal process.
{% endhint %}

### Background and context

Protecting areas with high ecological value has always been central to Green Star. Mandatory requirements in Green Star rating tools have dictated that projects must not significantly impact sensitive areas such as old-growth forests, prime agricultural land and nationally important wetlands.

In 2014, these requirements were updated to specify that new buildings cannot significantly impact Matters of National Environmental Significance (MNES), that is, certain nationally significant (protected) animals, plants, habitats, and places listed under the EPBC Act.

At the same time, the EPBC Act allows projects that significantly impact MNES to proceed if they are approved as a controlled action, provided conditions are met. In recent years, GBCA has received multiple eligibility queries from projects that were approved under the EPBC Act but still fell short in meeting Green Star’s mandatory requirements concerning impacting sites with high ecological value.

This highlights a key difference:

* **EPBC approvals** determine whether a project can proceed under law, even if ecological impacts remain.
* **Green Star** sets a higher benchmark, recognising projects that demonstrate best practice in protecting ecological value, not just compliance.

To address this challenge, GBCA developed the Above and Beyond approach. It provides a methodology for assessing whether a small subset of projects with complex ecological contexts may, in limited circumstances, demonstrate sufficient ecological outcomes to be considered for certification.

### How to use this guidance

This guidance is structured in three parts:

* **Part 1** explains the mandatory requirements in Green Star rating tools related to impacts on nature, and how these interact with the EPBC Act.
* **Part 2** outlines the process for requesting consideration to use the Above and Beyond approach.
* **Part 3** describes the Above and Beyond approach in detail, including the criteria projects must meet, evidence required, and examples of actions that can be taken to demonstrate outcomes beyond regulatory approvals.

Applicants should engage with GBCA as early as possible if they believe they may not meet the mandatory requirements. Failure to do so may cause delays and, in some cases, ineligibility for certification.

***

## <mark style="color:$primary;">Part 1: Understanding mandatory requirements in Green Star when impacting nature</mark>

{% hint style="info" %}
**Consider impacts to nature early**

* Before site purchase: GBCA strongly recommends that project teams review the mandatory requirements in the relevant Green Star rating tool as part of due diligence.
* If you already own the site (particularly greenfield sites): review these requirements before registering your project for Green Star.
* Always ensure you understand the ecological value of the site early. This information should inform your project’s strategy, brief, concept and design.
  {% endhint %}

### 1.1 Mandatory requirements in Green Star concerning nature

Every Green Star rating tool includes certain mandatory requirements that must be met for a project to be eligible for certification. These are called:

* **Conditional Requirements** in legacy tools such as *Green Star – Design & As Built*, and
* **Minimum Expectations** in newer (Future Focus) tools such as *Green Star Buildings*.

For simplicity, this document refers to both as **mandatory requirements**.

For new buildings (the focus of this guidance), a key mandatory requirement is that projects must not significantly impact sites with high ecological or biodiversity value. These requirements prohibit significant impacts to old-growth forests, prime agricultural land, wetlands of High National Importance, and Matters of National Environmental Significance (MNES) as defined under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).

The specific requirements are set out in the relevant credits in each rating tool. While the principles are consistent, the details vary slightly by tool:

* **Green Star – Design & As Built v1.3 (and earlier)**: Sustainable Sites (Conditional Requirement)
* **Green Star Buildings v1**: Impacts to Nature (Minimum Expectation)
* **Green Star Buildings v1.1**: Impacts to Nature (Minimum Expectation)

This requirement applies to the condition of the site at the date of site purchase or option contract (previous condition of the site).

If the site has been owned by the current owner for more than five years prior to the project’s Green Star registration, the requirements are applied to the state of the site that existed at least five (but not more than ten years) prior to the project’s Green Star registration date.

Where the previous condition of the site is unclear, a qualified Ecologist must assess the site to determine its ecological value at the approximate time of purchase.

For details on how these requirements apply, refer to the Submission Guidelines and credit of the relevant rating tool.

{% hint style="warning" %}
**Note:** Planning or environmental approvals do not automatically satisfy these requirements. Even where impacts have been approved, the project may still be ineligible for a Green Star rating.
{% endhint %}

### 1.2 Relationship between Green Star and the EPBC Act

The EPBC Act is Australia’s primary environmental law. It regulates activities that may significantly impact MNES, such as threatened species, listed ecological communities, or heritage places.

Under the Act:

* Projects may be referred for assessment.
* If significant impacts are likely, the Minister may approve them with conditions. These projects are known as controlled actions.

However, Green Star requirements are stricter:

* **Projects approved as controlled actions under the EPBC Act are not automatically eligible for Green Star certification.**
* This is because Green Star goes beyond compliance, requiring projects to demonstrate protection of ecological value that exceeds the baseline set by law.

### 1.3 Site scenarios and meeting requirements

Where a proposed action on the site has been, remains, or is currently approved as a controlled action under the EPBC Act — whether at the time of site purchase, option contract, or in the project’s current status — the project cannot meet Green Star’s mandatory nature-related requirements (Conditional Requirements or Minimum Expectations).

If all controlled action requirements associated with the site have been fulfilled and formally signed off by the relevant authority prior to site purchase or option contract, the standard Green Star mandatory requirements apply and the Above and Beyond approach is not required.

These scenarios illustrate how the timing of site purchase and controlled-action approvals affects eligibility under Green Star’s mandatory requirements. The examples are not exhaustive, and individual project circumstances may vary. If in doubt, contact GBCA.

<table><thead><tr><th width="139.5">Scenario</th><th width="247.75">Description</th><th>Outcome</th></tr></thead><tbody><tr><td>A</td><td>Project is approved as a controlled action.</td><td>Project does not meet mandatory Green Star nature requirements. Must submit an eligibility query to GBCA to request use of the Above and Beyond approach prior to registration or a Technical Question if already registered.</td></tr><tr><td>B</td><td>Site purchased with an existing controlled-action approval; conditions not yet fulfilled.</td><td>Project does not meet mandatory Green Star nature requirements. Must submit an eligibility query to GBCA to request use of the Above and Beyond approach prior to registration or a Technical Question if already registered.</td></tr><tr><td>C</td><td>Site purchased under an option contract; controlled-action conditions fulfilled before sale but present at the time of the option contract.</td><td>Project does not meet mandatory Green Star nature requirements. Must submit an eligibility query to GBCA to request use of the Above and Beyond approach prior to registration or a Technical Question if already registered.</td></tr><tr><td>D</td><td>Site purchased which previously had a controlled action but all conditions were fulfilled prior to option contract / sale.</td><td>Project is eligible to meet mandatory Green Star nature requirements.</td></tr></tbody></table>

***

## <mark style="color:$primary;">Part 2: Requesting to use the Above and Beyond approach</mark>

### 2.1 Process for requesting consideration

Projects seeking to use the Above and Beyond approach must follow these steps:

{% stepper %}
{% step %}

## Submit a request

Submit an **Eligibility Query** to GBCA before registration or a **Technical Question** if already registered to seek approval to use the Above and Beyond approach.
{% endstep %}

{% step %}

## Provide supporting information

Provide supporting information, including:

* Project description, current condition of the site and the specific mandatory requirement/s the project cannot meet.
* Date of site purchase (and option contract if applicable).
* The MNES being impacted.
* If your project is a controlled action, evidence of EPBC status: referral, determination, consent conditions, supporting studies, and correspondence.
* Any bio-certification or pre-approval status under the EPBC Act.
* Completed ecological and impact assessments including quantified impacts verified by a qualified ecologist (e.g., area impacted, species affected).
* A narrative of how you intend to address the Above and Beyond criteria (including: proposed budget, responsible person/s, management roles and responsibilities).
* Description of any plans to date of actions taken to minimise and address impacts to nature caused by the proposed project.
  {% endstep %}

{% step %}

## GBCA review

* GBCA will review the information and may request a meeting or additional documentation.
* Determination may take up to 12 weeks, with further time required if additional information or external review is needed.
* In some cases, GBCA may commission one or more independent ecologist reviews (fees may apply).
* The project team agrees to waive confidentiality regarding information provided for peer review as determined by GBCA.
* GBCA may also be required to go through a governance process to approve an outcome, which may delay the response.
  {% endstep %}

{% step %}

## Outcome

* GBCA will issue a written determination on whether the project may proceed using the Above and Beyond approach.
* A project cannot proceed to formal assessment until this determination is made.
* If the response is unsatisfactory, the project team may appeal in line with the conditions set out in the Certification Agreement.
  {% endstep %}
  {% endstepper %}

{% hint style="info" %}
**Note:** Where a project is approved to proceed under the Above and Beyond approach, GBCA will provide details of the requirements for submission.
{% endhint %}

### 2.2 GBCA’s considerations when reviewing requests

The GBCA may consider a project eligible to take the Above and Beyond approach if the project can demonstrate that it:

1. Minimises impacts to nature.
2. Goes above and beyond legislated requirements to protect and enhance ecological values.
3. Delivers a net benefit to society.
4. Does not negatively impact the Green Star brand.

{% hint style="warning" %}
**Important notes:**

* Depending on the project, the query may undergo a significant review process prior to GBCA making a determination. This may take longer than the standard query process and may require additional documentation and independent review.
* GBCA is the only body that can determine whether a project may use the Above and Beyond approach.
* Unless confirmed in writing by GBCA, project owners cannot assume eligibility.
* Any advice provided by third parties will be disregarded.
* GBCA reserves the right, at its sole discretion, to deny eligibility under this criterion
  {% endhint %}

***

## <mark style="color:$primary;">Part 3: The Above and Beyond approach</mark>

### 3.1 Intent and purpose

The Above and Beyond approach provides a pathway for projects that cannot meet the mandatory (Green Star Buildings and Green Star Design & As Built) requirements related to impacts on sites with high ecological value but can demonstrate actions that exceed regulatory approvals.

This approach recognises projects that go further than compliance by avoiding, minimising, offsetting, and ultimately enhancing ecological values. It allows such projects, with GBCA approval, to be considered eligible for a Green Star rating.

The GBCA worked with specialist environmental consultants to create the Above and Beyond criteria - an assessment framework in the form of conservation, rehabilitation, community and Indigenous engagement and research actions that clearly defines what can be considered ‘above and beyond’ legislated requirements regarding project design, the avoidance and minimisation of environmental impact and enhancement of biodiversity and broader environmental values. This approach cannot be used to justify significant or unmitigated ecological impacts.

The Above and Beyond criteria developed are shown in the matrix as provided below.

### 3.2 How it works

The Above and Beyond criteria are organised into **six Conservation Priority Areas**, from which projects must select actions that directly address their identified ecological impacts:

* Ecological Community Protection / Restoration
* Threatened Species Recovery Actions
* Waterway Conservation
* Pest and Weed Control
* Research
* Partnerships, Engagement and Community Support

Each action within these areas is assigned a **point value**:

* Low = 1 point
* Moderate = 2 points
* High = 5 points (available only in Ecological Community Protection / Restoration, Threatened Species Recovery Actions, and Waterway Conservation)

For each action, only one level (Low, Moderate or High) may be claimed. Points are not cumulative across levels.

To meet the approach, projects must achieve a **minimum of 10 points**, including **at least one High (5-point)** action and actions drawn from **at least three** different Conservation Priority Areas.

This ensures that projects address their most significant ecological impacts through a High-value action while also managing secondary threats across multiple areas.

All selected actions must be documented in the project’s Integrated Conservation Management Plan (ICMP), which sets out how they will be implemented, monitored, and maintained.

### 3.3 Requirements for satisfying the approach

To demonstrate compliance with the Above and Beyond approach, all of the following conditions must be met:

{% stepper %}
{% step %}

## EPBC compliance

All approval conditions for any controlled actions under the EPBC Act must be fully met.
{% endstep %}

{% step %}

## Integrated Conservation Management Plan (ICMP)

A qualified ecologist or environmental consultant must prepare an ICMP that:

* Identifies the key threats relevant to the project;
* Selects conservation actions that directly respond to those threats; and
* Assigns responsibilities for implementation, monitoring, and maintenance.

The ICMP may be integrated into existing management frameworks if it meets these criteria. Detailed requirements for ICMPs are provided in Appendix A.
{% endstep %}

{% step %}

## Scoring and evidence

The project must achieve a total of at least 10 points in accordance with Section 3.2 and provide documented evidence supporting all actions claimed.
{% endstep %}

{% step %}

## Assessment

The project is assessed through GBCA’s formal assessment process to determine whether these conditions have been satisfied.
{% endstep %}
{% endstepper %}

{% hint style="info" %}
**Note:** Actions contributing to a project’s Above and Beyond score cannot also be claimed as Leadership points within the Green Star rating tool. For example, if a project achieves a High category action (5 points) under the Above and Beyond Waterway Conservation criteria, these same actions cannot be claimed again for Leadership points under the Waterway Protection credit.
{% endhint %}

### 3.4 Above and Beyond criteria

<table><thead><tr><th width="131">Conservation Priority Area</th><th width="200.75">Low (1 point)</th><th width="107.75">Moderate (2 points)</th><th width="133.5">High (5 points)</th><th width="119.5">Referenced guidelines</th><th>Notes</th></tr></thead><tbody><tr><td>Ecological Community Protection / Restoration</td><td>Regeneration / restoration of <strong>100%</strong> equivalent area of impacted MNES through promotion of natural regeneration, in combination with collection and propagation of ecological community – appropriate plant species to restore structural diversity and ecosystem health as required.<br><br>Proponents must demonstrate avoidance has been considered first (explain <strong>why</strong> impact could not be avoided).<br><br>Regeneration must demonstrate an increase in species diversity and functional attributes.<br><br>Existing site conditions to be used as baseline. Must be undertaken in combination with pest and weed control measures.<br><br>Commitment to restoration efforts to ensure success over minimum 3-year period.<br><br>Protection/restoration program must be aligned with an approved EPBC Act Conservation Advice and/or Conservation Management Plan.<br><br>Selected ecological community must align with the specific MNES being impacted by the project.<br><br>Conservation covenant must be applied to any land protected in perpetuity.</td><td>Same as Low, but for <strong>200%</strong> equivalent area.</td><td>Same as Low, but for <strong>300%</strong> equivalent area.</td><td>Approved EPBC Act Conservation Advice and/or Conservation Management Plan.</td><td>Projects achieving the Green Star Buildings Nature Stewardship credit may demonstrate compliance with the Low level (1 point) of the Above and Beyond Ecological Community Protection / Restoration criteria, provided restoration activities are additional to legislated offsets.<br><br>Where a project relies on restoration actions required under EPBC or planning approvals, these may contribute to Above and Beyond percentage thresholds but will not be recognised under the Nature Stewardship credit. This creates only a partial alignment:<br><br>• Above and Beyond may recognise enhanced or scaled-up versions of approval conditions (e.g. 200–300% restoration of the impacted MNES).<br>• Nature Stewardship requires entirely voluntary actions beyond offsets.<br><br>Projects therefore need to clearly distinguish between mandated offsets and voluntary restoration when seeking to demonstrate alignment.<br><br><strong>Note:</strong> Alignment with Nature Stewardship does not automatically guarantee compliance with Above and Beyond criteria. Projects must still demonstrate that all Above and Beyond requirements are met, including evidence that avoidance was considered first, baseline conditions were established, pest and weed control measures are in place, and long-term monitoring and protection commitments are secured.</td></tr><tr><td>Threatened Species Recovery Actions</td><td>Demonstrated avoidance of impacts; retention of habitat for impacted species.<br><br>Design and implement targeted threatened species program that includes program implementation, monitoring and long-term management strategy. Any habitat supplementation to be species appropriate.<br><br>Program guided by a preliminary flora and fauna survey with ongoing monitoring.<br><br>Threatened species program must be aligned with an approved EPBC Act Threatened Species Recovery Plan (or State based plan if not available).<br><br>Selected species must align with the specific MNES listed threatened species being impacted by the project.<br><br>Program $ value = ≥0.05% of contract value.</td><td>Same as Low, but program $ value = ≥0.1% of contract value.</td><td>Same as Low, but program $ value = ≥0.15% of contract value.</td><td>Approved EPBC Act Threatened Species Recovery Plan (or State based plan if not available)</td><td></td></tr><tr><td>Waterway Conservation</td><td>Integrate state specific industry best practise guidelines (e.g. NSW 'Blue Book') to protect waterways from release of sediment and other pollutants.<br><br>Must include water quality baseline (TSS, BOD, N, P, pH etc.); site specific WQOs established.</td><td>Protect and enhance aquatic environments through implementation of innovative Erosion and Sediment (ERSED) control measures that utilise natural design for stormwater drainage systems, retention basins or any other waterfront features in the proposal.<br><br>Must include water quality baseline (TSS, BOD, N, P, pH etc.); site specific WQOs established or appropriate WQO parameters to be met.</td><td>Implement innovative project to protect and enhance local waterways and integrate stormwater treatment into the landscape such that it confers multiple benefits that include reduced sediment and nutrient runoff and creation of terrestrial and aquatic habitat and the creation of public open spaces where relevant (e.g. Water Sensitive Urban Design, Vegetation Mgt Plan, soft engineering).<br><br>Must include water quality baseline (TSS, BOD, N, P, pH etc.); site specific WQOs established or Aquatic Ecosystem parameters to be met.</td><td>WSUD guidelines - Applying WSUD principles to NSW transport projects and Managing Urban Stormwater: Soils and Construction - Volume 1</td><td>Projects achieving the Green Star Buildings Waterway Protection credit will generally be able to demonstrate compliance with the Low or Moderate levels of the Above and Beyond Waterway Conservation criteria. To achieve the High level (5 points), projects must go beyond pollutant and volume reduction by showing how stormwater management also delivers ecological restoration, habitat creation, and social/public realm benefits.<br><br>Green Star Buildings v1.1 Waterway Protection credit:<br>• Credit Achievement meets Low criteria. Where innovative/naturalised systems are used, may meet Moderate criteria.<br><br>Green Star Buildings v1 Waterway Protection credit:<br>• Credit Achievement meets Low criteria.<br>• Exceptional Performance meets Moderate criteria.<br><br><strong>Note:</strong> Alignment with the Green Star Buildings Waterway Protection credit does not automatically guarantee compliance with the Above and Beyond Waterway Conservation criteria. Projects must still demonstrate that all Above and Beyond requirements are met. This includes showing that:<br><br>• a baseline water quality assessment has been undertaken (e.g. TSS, BOD, N, P, pH);<br>• site-specific Water Quality Objectives (WQOs) or equivalent parameters are established;<br>• the approach extends beyond compliance targets by demonstrating innovative measures to protect and enhance waterways; and<br>• monitoring, maintenance, and reporting commitments are in place to support long-term outcomes.</td></tr><tr><td>Research</td><td>Deliver research project onsite and throughout broader impacted ecological community and / or on relevant conservation area with like-for-like species and / or ecological community.<br><br>Ongoing involvement with research institution, Indigenous groups and / or community must be demonstrated.<br><br>Collaboration with multiple stakeholders a requirement.<br><br>Research program/project must be aligned with an approved EPBC Act Conservation Advice and Threatened Species Recovery Plan (if available).<br><br>Selected species must align with the specific MNES listed threatened species being impacted by the project.<br><br>Research $ value = ≥0.05% of contract value.</td><td>Same as Low, but research $ value = ≥0.1% of contract value.</td><td>N/A</td><td>Approved EPBC Act Conservation Advice and Threatened Species Recovery Plan (if available)</td><td></td></tr><tr><td>Pest and Weed Control</td><td>Demonstrate compliance with relevant State/Territory biosecurity duty.<br><br>Annual report by suitably qualified professional with photographic evidence of ongoing management of target species, from within a protected area / site within 3 years of completion of construction phase.<br><br>Program must be aligned with an approved EPBC Act Conservation Advice and Threatened Species Recovery Plan (if available).<br><br>Selected species/ecological community must align with the specific MNES listed entity being impacted by the project.</td><td>In addition to Low: implement a weed/pest monitoring and management program, including annual audits by an independent consultant, and measurable targets for eradication/control of target species within 3 years of construction completion.</td><td>N/A</td><td>Local weed management plan or Australian Government Threat Abatement Plan for Feral Animals.</td><td></td></tr><tr><td>Partnerships, Engagement and Community Support</td><td>Partner with an approved, established conservation program to fund restoration of impacted MNES or threatened species in a designated conservation area.<br><br>Program must be aligned with an approved EPBC Act Conservation Advice and Threatened Species Recovery Plan (if available).<br><br>Selected species/ecological community must align with the specific MNES listed entity being impacted by the project.<br><br>Partnerships $ value = ≥0.05% of contract value.</td><td>N/A</td><td>N/A</td><td>Approved EPBC Act Conservation Advice and Threatened Species Recovery Plan (if available)</td><td>Projects achieving the Green Star Buildings Nature Stewardship credit through the partnership pathway (supporting an organisation to restore land) can generally be considered to meet the Low level (1 point) of the Above and Beyond Partnerships criteria, provided that:<br><br>• The funded program directly relates to the impacted MNES or threatened species, and<br>• The contribution is at least equivalent to ≥0.05% of contract value.<br><br>The Nature Stewardship credit additionally requires longer-term funding (≥5 years) and independent third-party verification, which may demonstrate best practice but does not alter the Above and Beyond score, which is capped at 1 point for this criterion.</td></tr></tbody></table>

***

## <mark style="color:$primary;">Appendix</mark>

### A: Integrated Conservation Management Plan

The Integrated Conservation Management Plan (ICMP) must include, at a minimum:

* A commitment to provide for a minimum three-year implementation and monitoring program.
* Evidence of flora and fauna surveys completed by qualified/accredited assessors to establish baseline data, guide development of the plan, and support future monitoring.
* CV and confirmation of qualifications/accreditation of those individuals who developed the plan.
* A budget allocation.
* Demonstration that the plan meets SMART (Specific, Measurable, Achievable, Relevant, and Timebound) criteria.
* Outline of persons responsible for implementation, with roles and responsibilities clearly defined.
* Monitoring methodology, reporting format, timelines, and measurable KPIs.
* Demonstration of how authentic long-term environmental benefits to relevant ecological values will be realised, and how these align with applicable guideline documents.
* Confirmation that the conservation actions proposed are additional and above and beyond current legislative requirements, not a duplication of regulation or conditions of consent.

It is also strongly encouraged that the ICMP include:

* Maps showing locations where actions will be implemented, including details such as area impacted (ha) and offset areas (ha).
* Photographs of proposed conservation areas and photo monitoring points to support monitoring and KPI reporting.
* Schedule/format of any planned meetings, forums, or workshops with volunteer groups or the wider community (if relevant to the actions selected).

### B: Addressing threats

Each project must demonstrate how its selected actions directly respond to the key ecological threats identified for the site by a qualified ecologist.

The list below outlines common ecological pressures arising from development. It is intended as a diagnostic guide to help project teams and their ecologists identify relevant actions from the Above and Beyond criteria. It should be supplemented by site-specific assessments.

**Common threats include:**

* Habitat loss and fragmentation (e.g. clearing of native vegetation, removal of critical habitat features, barriers to species movement).
* Altered hydrology and waterway impacts (e.g. flow regime changes, sedimentation, erosion, pollution from construction).
* Invasive species (e.g. weed invasion, pest animals, diseases such as Phytophthora).
* Altered fire regimes (e.g. increased ignition risk, inappropriate fire frequency or intensity).
* Pollution and contamination (e.g. stormwater runoff, litter, chemicals, noise, light).
* Overharvesting and resource use (e.g. removal of logs, firewood, rocks or soils that provide habitat).
* Climate change pressures (e.g. increased heat, altered rainfall, extreme events affecting sensitive species).
* Loss of connectivity and corridors (e.g. development blocking wildlife movement or reducing ecological linkages).
* Indirect human disturbance (e.g. trampling, recreational pressure, pets in conservation areas).
* Knowledge gaps (e.g. insufficient monitoring data or ecological understanding for decision-making).

## Version control

| Version | Date     | Description     |
| ------- | -------- | --------------- |
| v1      | 21/04/26 | Initial release |


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/other-useful-resources/above-and-beyond-approach.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.