> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/energy-use-calculation-guide.md).

# Energy Use calculation guide

Guidance on calculation methods for the [*Energy Use*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/23-or-energy-use.md) credit in Green Star Buildings v1.1.

{% hint style="warning" %}
**Release 1 - 19/06/2026**

* Initial release for Green Star Buildings v1.1 (Adapted from Green Star Buildings v1)

[#version-control](#version-control "mention")
{% endhint %}

<table data-search="false"><thead><tr><th width="735.25">Section</th></tr></thead><tbody><tr><td><a href="#introduction"><strong>Introduction</strong></a></td></tr><tr><td><a href="#about-this-guide">About this guide</a></td></tr><tr><td><a href="#about-the-energy-use-credit-in-green-star-buildings-v1.1">About the Energy Use credit in Green Star Buildings v1.1</a></td></tr><tr><td><a href="#relationship-with-the-national-construction-code-ncc">Relationship with the National Construction Code (NCC)</a></td></tr><tr><td><a href="#definitions">Definitions</a></td></tr><tr><td><a href="#calculation-requirements"><strong>Calculation Requirements</strong></a></td></tr><tr><td><a href="#scope">Scope</a></td></tr><tr><td><a href="#simulation-software-standards">Simulation software standards</a></td></tr><tr><td><a href="#modelling-criteria">Modelling criteria</a></td></tr><tr><td><a href="#references"><strong>References</strong></a></td></tr><tr><td><a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/energy-use-calculation-guide/appendix-a.-hvac-system-design-parameters.md">Appendix A: HVAC system design parameters</a></td></tr><tr><td><a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/energy-use-calculation-guide/appendix-b.-hvac-system-simulation-parameters.md">Appendix B: HVAC system simulation parameters</a></td></tr><tr><td><a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/energy-use-calculation-guide/appendix-c.-default-operating-schedules.md">Appendix C: Default operating schedules</a></td></tr><tr><td><a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/energy-use-calculation-guide/appendix-d.-supplementary-building-and-systems.md">Appendix D: Supplementary building and systems - definitions and calculation methods</a></td></tr><tr><td><a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/energy-use-calculation-guide/appendix-e.-energy-consumption-adjustment-factors.md">Appendix E: Energy consumption adjustment methods</a></td></tr><tr><td><a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/energy-use-calculation-guide/appendix-f.-alternative-method-minimum-provisions.md">Appendix F: Alternative method to the Minimum Provisions requirements</a></td></tr></tbody></table>

## <mark style="color:$primary;">Introduction</mark>

### About this guide

This document sets out the basis on which project energy consumption modelling is to be completed for all Green Star Buildings v1.1 projects targeting [Pathway A: Reference building pathway](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/23-or-energy-use.md#a-reference-building) in the *Energy Use* credit. This guide:

* Provides definitive guidance on the requirements for modelling of project energy performance, in terms of end use inclusions and key considerations for the *Reference* and *Proposed building*.
* Provides flexibility to the project team to adjust default operating profiles where appropriate to better reflect the anticipated operation of the project.
* Provides meaningful information to inform the ongoing monitoring and management of project energy performance.

Based on the completed project energy performance modelling, the energy consumption reduction is calculated by entering the *Reference* and *Proposed building* annual energy consumption data into the Energy Use – Pathway A: Reference building calculator.

This guide applies to projects registered under version 1.1 of Green Star Buildings (all revisions). This guide is not applicable to projects targeting Green Star Buildings v1. These projects should refer to the [Energy Use calculation guide v1](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.0-rev-c/calculation-guides/energy-use-calculation-guide.md).

### About the Energy Use credit in Green Star Buildings v1.1

Green Star Buildings v1.1 recognises advances industry has made with electrification whereby all-electric buildings are the standard. This is acknowledged as the *Reference building* in the Energy Use credit. The credit also intends to place a stronger focus on energy efficiency improvements in the building by separating the recognition of on-site renewables.

#### Minimum provisions

In the [*Minimum Expectation*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/23-or-energy-use.md#minimum-provisions), in addition to demonstrating a reduction in energy use, each building system must be compliant with the relevant Deemed-to-Satisfy (DTS) provisions in NCC Section J for wall-glazing constructions, display windows, fan systems, pump systems, refrigerant chillers, heat rejection equipment and artificial lighting systems as noted in the Submission Guidelines.

As an alternative for wall-glazing constructions and display windows, project teams may follow the approach in [Appendix F. Alternative method to the Minimum Provisions requirements](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/energy-use-calculation-guide/appendix-f.-alternative-method-minimum-provisions.md).

#### Interdependence with other Green Star credits

The assumptions included in the energy modelling of the project must be consistent across the project's Green Star submission including approaches to other credits. The relevant credits and assumptions are noted below. For specific projects, there may be more interdependent credits based to the project's design. Project teams should take care to ensure consistency is maintained.

**Verification and Handover**\
Designing and testing for airtightness is included in the [*Commissioning and Tuning*](https://greenstarresources.gbca.au/pages/RKlOiWJ2RV08GmWWpE9P#id-3.0.2-commissioning-and-tuning) criterion in *Minimum Expectation*. The correlation between airtightness and energy efficiency is accounted for in the Certified assessment by including the airtightness test results in the energy modelling. For the Designed Assessment, the airtightness targets set under the same criterion should be used.

**Clean Air**\
Ventilation rates and the method of ventilation control as applied in the [*Clean Air*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/11-or-clean-air.md) credit must be consistent with the quantities and controls claimed in this credit.

**Light Quality**\
Artificial lighting and daylight calculations must be consistent with the assumptions claimed for lighting in [this credit](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/12-or-light-quality.md).

**Energy Source**\
The [*Minimum Expectation*](https://greenstarresources.gbca.au/pages/vqD8Vh2UQ7bnU6H3SxjN#id-23a.0.1-all-electric-building-services) in this credit means that all rated buildings are all-electric and have no infrastructure for fossil fuels for hot water, space heating and cooking. Therefore all-electric reference systems are outlined in this guide for the *Reference building*. The all-electric systems installed in the building will also be included in the *Proposed building*.

**Refrigerant Systems Impacts**\
[This credit](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/26-or-refrigerant-systems-impacts.md) has specific considerations and requirements around the refrigerants installed in the refrigerant-based systems for the project. This may mean that due to the project's ambitions, the available refrigerant-based systems options may differ from standard practice. Where this has disadvantaged the project's ability to demonstrate energy use reductions, project teams are encouraged to contact the GBCA via a Technical Question with a justification.

**Water Use**\
The usage profile and properties of the water-based systems in the building must consistent in both the [*Water Use*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/29-or-water-use.md) and [*Energy Use*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/23-or-energy-use.md) credit. This includes for both the *Reference* and *Proposed building* for each credit. Water-based systems may include domestic hot water, heat rejection, evaporative cooling and/or chilled water systems.

Domestic hot water usage for the *Reference* and *Proposed buildings* must be based on the calculations completed in the *Water Use calculator*. The calculator provides an annual total usage figure only; the project team must convert this to an hourly usage profile for use in conjunction with the simulation model. Guidance on water consumption profiles is provided (refer to [Modelling domestic hot water systems](#modelling-domestic-hot-water-systems)).

Heat rejection water consumption for the *Proposed building* is calculated by the *Water Use calculator* based on monthly total heat rejection values, or by entering the total usage value calculated as part of the energy performance simulation or through supplementary manual calculations. Please refer to the [*Water Use calculation guide*](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/water-use-calculation-guide.md) for guidance on completing the heat rejection section of the *Water Use calculator*.

Where direct or indirect evaporative cooling systems are used in the *Proposed building*, the associated water consumption must be calculated as part of the energy performance simulation and the total entered into the *Water Use calculator*.

### Relationship with the National Construction Code (NCC)

Section J of the NCC sets out minimum thermal performance standards and forms the basis of the *Reference building*. The J1V3 and J1V5 methodologies have been adopted and modified to outline a standard practice all-electric building.

For the purposes of Green Star ratings:

* Where this document makes references to Section J requirements of the NCC, this refers to either NCC 2022 or NCC 2025, whichever version the building's approval is subject to, with all parts being applicable. No state amendments or exclusions are allowed.
* Projects are not permitted to reference a version earlier than NCC 2022.
* Project teams may elect to use a later version than current at the time of Green Star registration to align with the modelling and reporting with the version the building's approval is subject to. Please contact the GBCA prior to registration if your project is subject to a later version than NCC 2025.
* Where there are any discrepancies between the requirements of this document and those of Specification 34, this document takes precedence.

### Definitions

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#air-conditioning)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#conditioned-space)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#deemed-to-satisfy-dts-provisions)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#buildings-approval)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#energy-use)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#ventilation)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#energy-use-national-construction-code)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#process-loads)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#project-scope)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#proposed-building)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#reference-building)

[Glossary](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/all-definitions.md#sole-occupancy-unit-sou)

## <mark style="color:$primary;">Calculation requirements</mark>

### Scope

The following end uses must be included in the assessment of the building's energy use, as a minimum:

* All HVAC systems for control of the internal environment in buildings, including server, communications, equipment, electrical rooms and temperature-controlled warehouse/storage facilities.
* All internal and external artificial lighting, including task lighting, provided as part of the services engineer's scope of works (lighting provided as part of architectural or furniture, fixtures and equipment (FF\&E) scope of works are excluded).
* All water supply and treatment systems, including cold water pressurisation, domestic hot water heating, rainwater distribution, grey or blackwater treatment and distribution (including reverse osmosis, ultraviolet or other filtration systems).
* Vertical and horizontal transportation systems, including lifts, escalators and moving walkways.
* All swimming pool plant systems, including water heating, circulation pump(s), and underwater lighting. This includes general swimming pools and spas in leisure centres, gymnasia and residential buildings, and specialist pools, e.g. hydrotherapy pools.
* Where a space is defined as a conditioned space, but the design does not include any specific air conditioning provision to service the space (i.e. a cold shell), the energy use of the fit out is based on systems that meet the NCC Deemed-to-Satisfy (DTS) provisions for the expected space type. If a tenancy fitout guide integrated into lease agreements is provided with specific requirements for systems, this is to be assumed to determine the energy use.
* Appliances in Class 2 residential projects.

{% hint style="info" %}
Lift and domestic hot water energy consumption must be included in both the *Proposed* and *Reference building* energy consumption for Green Star ratings; NCC Section J Specification S34C4 (h) does not apply.
{% endhint %}

Heat loads due to process loads must be accounted for, whether as airside or waterside system loads, but direct energy consumption due to operation of the process is not included, except for appliances in residential projects (NCC Class 2). The definition of process load includes, but is not limited to:

* Computers and similar IT equipment in office-type work environments.
* IT and communications equipment in server rooms, data centres and communications rooms.
* Specialist healthcare equipment such as MRI, CT, PET and X-ray imaging equipment.
* Medical gas reticulation, compressed air generation and reticulation, steam used solely for the purposes of sterilisation/autoclaves, and other similar healthcare loads.
* Commercial catering operations. Note that the associated kitchen ventilation systems are not process loads and must be included in the calculation.
* Commercial laundry operations. Note that the associated ventilation systems are not process loads and must be included in the calculation.
* Operation of freezer rooms, cool rooms and hot rooms in laboratories, warehouses and similar (the heat load in adjacent conditioned spaces must account for the temperature differential between them).
* Refrigerated display cabinets in food retail premises.
* Heating and cooling of, plunge pools, saunas and steam rooms in leisure facilities (the heat load in adjacent conditioned spaces must account for the temperature differential between them). Note that the associated ventilation systems are not process loads and must be included in the calculation.
* All industrial manufacturing processes.
* Electric vehicle charging in any building type.

On-site renewable energy generation systems connected behind the meter and energy exported to the grid do not contribute to reductions in energy use of the building for the purposes of energy modelling for the Energy Use credit.

On-site energy generation and energy exported to the grid may only be included in energy modelling for a Life Cycle Assessment for the Impacts Disclosure credit.

### Simulation software standards

Simulation software used for the purposes of this credit is required to have been tested in accordance with ASHRAE Standard 140-2007 and have been demonstrated to be within the allowable range of results for all tests, as per the software requirements for Section J Verification Methods. The ABCB does not maintain a register of complying software, but software previously documented to have demonstrated compliance with the requirements includes (BC, 2006):

* Beaver (developed by ACADS-BSG)
* EnergyPlus (developed by LBNL and DOE)
* Tas (developed by EDSL)
* IES (developed by IES)
* IDA ICE (developed by Equa Solutions)
* TRACE 800 (developed by Trane CDS)
* HAP E20-II (developed by Carrier).

These requirements are adopted by the GBCA as the basis of demonstrating the suitability of software for completing the assessments detailed in this document. Projects using software other than those in the above list must demonstrate that the requirements of the Protocol are satisfied as part of the credit submission.

Additionally, all projects must demonstrate that software users or verifiers have received formal training from the software vendor in the use of the software, or has at least 3 years experience in energy modelling and modelled at least 3 similar buildings.

#### Use of software and other calculation methods

For the purposes of Green Star, the software must be used for the calculation of all air conditioning system loads (i.e. air side coil loads) and energy consumption. Where practicable, the software must also be used for the calculation of all HVAC plant loads and associated energy consumption.

However, it is recognised that all software packages have limitations and that some system components and/or arrangements may not be able to be assessed by the software directly. Where this is the case, the project team may use supplementary manual calculations (such as in a spreadsheet), but all components that have been calculated in this way must be disclosed, and a description of the methodology given, including commentary on any limitations of the methodology and their effect on the results of the calculation. Where applicable, the same alternative calculation method must be used in the calculations for both the *Proposed* and *Reference building*.

### Modelling criteria

#### General modelling criteria

The following table defines the main features of the *Proposed* and *Reference buildings* to be used in the simulation model to assess the associated energy consumption for the Certified assessment. For Designed assessments, all references to as-built documents and material selections shall be read as references to equivalent design documents (e.g. tender or contract issue).

The information in this section shall be read in conjunction with the supplementary definitions (refer to Definitions).

*Table 1: Modelling requirements for the Proposed and Reference building*

<table data-search="false"><thead><tr><th width="71">Item</th><th>Description</th><th>Proposed building</th><th>Reference building</th></tr></thead><tbody><tr><td>1</td><td>Thermal calculation method</td><td>A thermal calculation method that complies with ASHRAE Standard 140-2007 (or later).</td><td>As <em>Proposed building</em> model (as NCC Section J Specification S34C3 (1)(a)).</td></tr><tr><td>2</td><td>Location (selection of climate file)</td><td>CSIRO Typical Meteorological Year (TMY) weather files drawn from the years 1990 to 2015 are used.<br><br>For all building classes excluding Class 2 sole-occupancy units under NCC 2025, projected weather files using a projection at year 2050 made under a Representative Concentration Pathway (RCP) of 8.5 is used. Projects under NCC 2022 are recommended to model their energy consumption under a 2050 projection.<br><br>Both datasets can be obtained from the CSIRO Data Shop here for the TMY weather files and here for the projected weather files.<br><br>Please submit a Technical Question to the GBCA for approval of alternative climate files if the project cannot comply with any of the above options, or if an alternative source of weather data is considered to be more suitable for use given the nature of the project.</td><td>As <em>Proposed building</em> model (as NCC Section J Specification S34C3 (3) and Specification S45C3 (1c).</td></tr><tr><td>3</td><td>Adjacent structures and features</td><td>Overshadowing from the surrounding environment must be taken into account in the model.<br><br>Existing adjacent buildings, including any already under construction, must be included in the model. Proposed buildings on adjacent sites may be excluded if construction has not already commenced at the time of registration of the project. Where the building is a stage in a precinct being developed by the same building owner, future proposed buildings in the precinct should be taken into account in the model.</td><td>As <em>Proposed building</em> model (as NCC Section J Specification S34C3 (1)(d) and Specification S45C3 (1)(e))</td></tr><tr><td>4</td><td>Environmental conditions</td><td>Factors such as ground reflectivity, sky and ground form factors, and temperatures of external bounding surfaces must be specified appropriately for the local conditions.</td><td>As <em>Proposed building</em> model (as NCC Section J Specification S34C3 (6)(m)).</td></tr><tr><td>5</td><td>Orientation</td><td>The representation of the <em>Proposed building</em> orientation shall be consistent with the as built documents.</td><td>As <em>Proposed building</em> model (as NCC Section J Specification S34C3 (1)(e) and Specification S45C3 (1)(f)).</td></tr><tr><td>6</td><td>Geometric model</td><td>The representation of <em>Proposed building</em> geometry shall be consistent with the as built documents.</td><td>As <em>Proposed building</em> model (as NCC Section J Specification S34C3 (1)(f) and Specification S45C3 (1)(g)).</td></tr><tr><td>7</td><td>Building envelope</td><td>The simulation of the <em>Proposed building</em> envelope shall be consistent with the as built documents and material selections.<br><br>Actual construction R and U values shall be modelled inclusive of thermal bridging effects as required by NCC Section J Part J4D3 (5). Where limitations exist to the definition of thermal bridges in the modelling software, it is acceptable to reduce the thickness of the insulation layer in a homogeneous construction until the actual R or U value is achieved.<br><br>Manual fenestration shading devices such as blinds or shades may be modelled using realistic operating criteria.</td><td>The <em>Reference Building</em> thermal envelope shall be modelled based on the minimum performance requirements of NCC Section J Parts J4 and J5 (per NCC Section J Specification S34C2 (a)). Glazing-wall construction parameters shall be determined using Specification 37 calculation method 2 in Specification S37C4 and S37C6. Performance requirements shall be calculated for each building class within the project separately from the rest of the project (i.e. aggregation of wall-glazing is not permitted).<br><br>For Class 2 SOU parts of buildings, the requirements in NCC Section J Part J2D2 (2) and Part J3 shall be adopted. For walls and glazing, performance shall be determined in accordance with Part J3D9 (and Parts J3D8 and J3D11 to J3D13 will not apply). For climate zones 7 and 8, the SHGC shall be 0.60 for all orientations.<br><br>In order to maintain uniform building areas in the geometry models (per NCC Section J Specification S34C3 (5)), the modeller may manipulate either the insulation layer thickness, the insulation material thermal conductivity value, or both to achieve the required reference R or U value without affecting the building area where the modelling software uses defined construction thicknesses to determine net internal floor area.<br><br>Glazing performance may not exceed U value 5.8 W/m².K and/or solar heat gain coefficient 0.87 on the basis that such performance is not physically realistic. The total R value of a wall construction shall not be less than the specified minimum value in NCC Section J Part J4D6 (4), or more than 4.0 m².K/W.<br><br>External feature shading which has been included in the <em>Proposed building</em> specifically for the control of solar radiation entering the building shall be excluded from the <em>Reference building</em>. Shading that occurs due to intrinsic features of the building form, such as reveals and returns in the building structure, and balconies or other amenities, shall be included in both the <em>Proposed</em> and <em>Reference building</em>.<br><br>Where boundary conditions are defined for the <em>Proposed building</em> which are not based directly on the hourly weather data, the same boundary conditions must be applied for the <em>Reference building</em> (as NCC Section J Specification S34C3 (6)(b)).<br><br>Internal fenestration shading devices such as blinds or shades shall be modelled using the same colour and operating criteria as for the <em>Proposed building</em> (as NCC Section J Specification S34C3 (5)(d) and Specification S45C3 (1)(i)).</td></tr><tr><td>8</td><td>External surfaces solar absorptance</td><td>The simulation of the <em>Proposed building</em> envelope shall be consistent with the as built documents and material selections, including the shading effect of any PV panels and rooftop gardens.</td><td>For building other than Class 2 SOUs:<br>• Walls: a solar absorptance of 0.6 (as NCC Section J Specification S34C2 (b)).<br>• Roofs: a solar absorptance and thermal emittance as per NCC 2025 Section J Part J4D4 (2)(c) and Part J4D4 (3)(c). For climate zone 8, a solar absorptance of 0.7 and a thermal emittance of 0.85 is used. Solar PV panels or rooftop gardens shall be modelled for their shading effect as per Part J4D4 (4).<br><br>For Class 2 SOUs:<br>• External walls: solar absorptance in accordance with NCC Section J Part J3D8 (3). Where any value is permitted, 0.6 is used.<br>• Roofs: solar absorptance in accordance with NCC Section J Part J3D7 (9). Where any value is permitted, 0.7 is used.</td></tr><tr><td>9</td><td>Infiltration rate</td><td>For Designed stage modelling, the air tightness targets set for the project shall be used.<br><br>For Certified stage modelling, the airtightness testing results as determined as part of the <em>Commissioning and Tuning</em> criterion in <em>Minimum Expectation</em> under the Verification and Handover credit are used. The whole building infiltration rate can be determined using Tables 4.16 to 4.24 of CIBSE Guide A (as NCC Section J Specification S34C3 (7)).</td><td>The whole building infiltration rate applied for all spaces shall be as specified in NCC Section J Specification S34C2 (d).</td></tr><tr><td>10</td><td>Building operation</td><td>Operation should be specified based on the default operating profiles (refer to Appendix C. Default operating schedules) for the relevant space types. The simulation must incorporate variations for all day types as appropriate. Public holidays applicable to the project location shall be included in the simulation, and, unless specifically stated otherwise, will use the weekend or Sunday profile.<br><br>Where the anticipated operating hours of the <em>Proposed building</em> differ from the default operating hours, the project team may adjust them to better align with expectations. Where operation is varied by more than 10% of total default operating hours, this must be confirmed with the GBCA by a Technical Question prior to implementation in the model and must be supported by design documentation or a statement from the client confirming the operational intent.</td><td>As per the <em>Proposed building</em>. Operating hours must be the same in both models.</td></tr><tr><td>11</td><td>HVAC zones</td><td>The simulation of the HVAC zones shall be consistent with the as-built documents.<br><br>For residential units in Class 2 buildings, the simulation must include separate Internal zones for daytime air-conditioned zones, and bedroom (night-time) and other zones, using the assumptions given in NCC Section J Specification S45C3 (1)(n).</td><td>As <em>Proposed building</em> model (NCC Section J Specification S34C3 (6)(f)), unless required to be modified to meet the system zoning requirements as described in Table 40.<br><br>For residential units in Class 2 buildings, as per <em>Proposed building</em>.</td></tr><tr><td>12</td><td>Heating, Ventilation and Air Conditioning</td><td>The HVAC system type and configuration must be modelled based on the design documents for Designed assessments, and as-built documents for Certified assessments. The simulated internal gains must be in accordance with Appendix B. HVAC system simulation parameters. Where variable volume control is specified, part-load fan power shall be modelled using one of the methods (refer to Variable air volume fan speed control).<br><br>All ventilation-only systems (e.g. in car parks, loading docks and industrial working spaces) must be included in the energy model. Refer to Appendix C. Default operating schedules which must be used for these system types.<br><br>Where a system includes HEPA filters or other high-pressure drop components required for the process served, system fan power must include the effect of this component(s).<br><br>Credit may be taken for installing atmospheric contaminant monitoring systems and variable-speed fan control in car parks and loading docks by using the Adjustment Factor (refer to Car park and loading dock atmospheric contaminant control systems).<br><br>Any areas of the building which are only fitted out to shell and core standard, a notional fit out must be modelled that meets the NCC Section J DTS provisions. If a tenancy fitout guide integrated into lease agreements is provided with specific requirements for systems, this is to be modelled. The design team must demonstrate the design provision (e.g. space allowance) that has been made for accommodating the system type modelled.</td><td>The <em>Reference building</em> HVAC system type(s), configuration and performance parameters must be as specified in Appendix D (Reference building HVAC Systems).<br><br>The design internal occupancy and equipment gains must be the same as for the <em>Proposed building</em> (refer to Appendix A. HVAC system design parameters).<br><br>The simulated internal occupancy and equipment gains must be the same as for the <em>Proposed building</em> (NCC Section J Specification 34 Clause S34C3 (6)(g)), except where additional control features are included in the <em>Proposed building</em>.<br><br>Those spaces in the <em>Proposed building</em> which are mechanically ventilated (such as car parks, loading docks and industrial working spaces), shall be fully mechanically ventilated in the <em>Reference building</em> (i.e. with no passive supply/passive exhaust) to the minimum requirements as per AS 1668.2:2024. The <em>Reference building</em> ventilation systems shall meet the minimum fan efficiency requirements of NCC Section J Part J6D5.</td></tr><tr><td>13</td><td>Artificial internal lighting</td><td>The artificial internal lighting system types and configuration must be modelled based on the as-built documents.<br><br>The annual energy consumption from internal artificial lighting, excluding emergency lighting, must be calculated on the basis of the proposed level of artificial lighting in the project with the daily profiles (refer to Appendix C. Default operating schedules). This includes any internal car park lighting.<br><br>Credit may be taken for lighting zoning and automatic controls which exceed the requirements of NCC Section J Part J6 (refer to Automatic lighting controls).<br><br>Any areas of the building which are only fitted out to shell and core standard, the fit out must be modelled to meet the NCC Section J DTS provisions.</td><td>The lighting power density used in the <em>Reference building</em> must be in accordance with NCC Section J Part J7 and based on the design lighting levels as applied in the <em>Proposed building</em> (as NCC Section J Specification S34C3 (6)(d)). The <em>Reference building</em> lighting power density can be adjusted for Room Aspect Ratio (as per NCC Section J Table J7D3a note (3)), but not for control devices (as per NCC Section J Table J7D3a note (4)) (as NCC Section Specification 34 Clause S34C2 (e)).<br><br>The same operating profiles must be used as are used in the <em>Proposed building</em> (refer to Appendix C. Default operating schedules).</td></tr><tr><td>14</td><td>Artificial external lighting</td><td>The artificial external lighting system types and configuration must be modelled based on the as-built documents.<br><br>The annual energy consumption from external artificial lighting must be calculated on the basis of the proposed level of external artificial lighting provided with the daily profiles (refer to Appendix C. Default operating schedules).<br><br>All external lighting within the project title boundary, but excluding emergency lighting, must be included in the <em>Proposed building</em> energy consumption calculation (this includes landscape and decorative lighting).<br><br>Where the <em>Proposed building</em> design lighting levels do not meet the horizontal illuminance requirements as per SA, 2005, the power density used in the energy consumption calculation must be the greater of:<br>• The proposed design lighting power density<br>• The reference lighting power density (refer to Reference building pump power) for the applicable lighting type category.<br><br>(This ensures that providing poor lighting amenity is not rewarded in this credit as an energy-saving measure.)</td><td>The annual energy consumption from the external lighting shall be calculated with the external lighting power density (refer to External artificial lighting in Appendix D) and the same daily profiles as used in the <em>Proposed building</em>.<br><br>The same external areas shall be illuminated in the <em>Reference building</em> as for the <em>Proposed building</em> excluding any landscape, decorative and emergency lighting. To establish which standard practice power density should be used for a particular area, the lighting designer must identify the appropriate category from AS/NZS 1158.3.1:2020 Clause 2.4.</td></tr><tr><td>15</td><td>Domestic hot water systems<br><br>It is necessary to complete the Water Use calculator before the energy consumption from the Proposed and Reference building domestic hot water system(s) can be calculated.</td><td>The <em>Proposed building</em> domestic hot water system types and configuration must be modelled based on the as-built design.<br><br>The <em>Proposed building</em> hot water consumption shall be as calculated by the Green Star Potable Water calculator.<br><br>The domestic hot water usage of the <em>Proposed building</em> depends on the water efficiency of the taps and showers. Reduction in the volume of domestic hot water usage by installing water efficient fittings is one way to reduce energy use associated with the building.<br><br>Where make up water is provided from the mains water service, the water temperature shall be based on the monthly values in Table A6 of SA, 2008 for the climate zone applicable to the building location. Where from another source, the building team shall make appropriate assumptions which must be stated in the submission.</td><td>The <em>Reference building</em> hot water consumption shall be as calculated by the <em>Water Use calculator</em>.<br><br>Refer to Reference building domestic hot water systems for details of the <em>Reference Building</em> system properties.<br><br>Make up water temperature shall be the same as for the <em>Proposed building</em>.</td></tr><tr><td>16</td><td>On-site energy generation</td><td>On-site energy generation may not be used to reduce the calculated annual energy consumption of the building. Therefore, the energy associated with on-site generation is not required to be reported in the Energy Use – Pathway A calculator.</td><td>None</td></tr><tr><td>17</td><td>Lifts</td><td>The energy consumption is based on the installed systems and calculated generally in accordance with ISO 25745-2:2015. Refer to Lift energy calculation methodology for further details.</td><td>Lifts shall be modelled based on the minimum performance requirements in NCC Section J Part J7D8 and energy performance calculated generally in accordance with ISO 25745-2:2015. Refer to Lift energy calculation methodology for further details.</td></tr><tr><td>18</td><td>Other energy consumption</td><td>All services required for the operation of the building must be included in the energy consumption.<br><br>Any other energy consumed on site for base building facilities such as a water-recycling treatment plant, must be included.<br><br>All assumptions used in the calculation must be provided in the documentation and justified.</td><td>None</td></tr><tr><td>19</td><td>Small power and process loads</td><td>The direct energy consumption by small power or process equipment is not included in the assessment, except for residential parts of buildings (BCA Class 2 SOU), refer to item 20. This energy consumption is related to the function of the building rather than the physical attributes of the building fabric and services which is being assessed in this credit.<br><br>However, the internal heat gains resulting from operation of the equipment must be included in the simulation of the HVAC energy consumption (refer to Appendix B. HVAC system simulation parameters).</td><td>As <em>Proposed building</em> model.</td></tr><tr><td>20</td><td>Appliances<br>Applicable to Green Star Buildings residential parts of buildings (NCC Class 2 SOU)</td><td>Energy consumption of appliances and equipment must be included in the building energy consumption, as follows:<br>• Refrigerators/freezer<br>• Dish washers<br>• Clothes washers<br>• Clothes dryers<br><br>The energy consumption shall be taken as the energy rating of the appliance (normalised energy consumption in kWh/annum). Refer to www.energyrating.gov.au.<br><br>If only some of the above appliances are being provided as part of the apartment fitout, then for those appliances not being provided, the same energy performance as for the <em>Reference building</em> shall be assumed.<br><br>All other appliances are considered small power.</td><td>Refer to Reference building appliances in Appendix D for energy consumption standards applicable to the <em>Reference building</em> appliances.</td></tr><tr><td>21</td><td>Swimming pools</td><td>The make up water requirement for a swimming pool, and the associated heat load for heating of make up water, is a function of water evaporation from the pool water surface and backflushing of filters. The project must estimate daily heating loads due to this water heating requirement.<br><br>Where make up water is provided from the mains water service, the water temperature shall be based on the monthly values in Table A6 of AS/NZS 4234:2008 for the climate zone applicable to the project location.<br><br>Pump hours of operation and timing of backflushing cycles used in calculations must be justified by the design team.<br><br>For internal pools, all other heat loss pathways may be ignored; for heated external pools, calculation of ground conduction, surface convection and body radiation heat transfer must also be included.</td><td>The following attributes of the swimming pool shall be as per the <em>Proposed building</em>:<br>• Swimming pool water volume and surface area<br>• Water design temperature (except all outdoor pools are assumed to be unheated)<br>• Hours of operation of swimming pool and associated plant<br>• Pool make up water temperature<br><br>The following apply to the <em>Reference building</em> swimming pool:<br>• Pool blanket is in use for all hours outside of normal operating hours<br>• Air-source heat pump water heater with efficiency as for Domestic Hot Water<br>• Water recirculation time of 2 hours, or as otherwise regulated.<br>• Circulation of the pool water shall be continuous throughout the hours of operation<br>• Circulation pumps shall have minimum pump power (refer to Reference building pump power) based on the flow rate defined by the recirculation rate and using the same system pressure head as for the <em>Proposed building</em><br>• No underwater pool lighting<br>• Operation of backflushing cycle for a period of 10 minutes per filter cell once a week. Number of filter cells shall be the same as for the <em>Proposed building</em>.</td></tr></tbody></table>

#### Operating profiles

Default operating profiles for all project types are provided in Appendix C. Default operating schedules. Modifications to suit project specific conditions are acceptable as follows:

* Changes of no more than 10% of equivalent full-load operating hours: all changes made for the purpose of the assessment must be declared in the project submission; or
* Changes of more than 10% of equivalent full-load operating hours: all changes requested for the purpose of the assessment must be submitted for approval as a Technical Question and must be accompanied by confirmation from the client that the changes made are in accordance with the anticipated project operation.

#### Modelling daylight-controlled artificial lighting systems

Where credit is claimed for dimming control of artificial lighting in response to measured daylight in a space, other than by use of the deemed adjustment factors (refer to Automatic lighting controls), either of the following calculation methods may be applied:

* Calculation of hourly internal daylight levels by the project energy performance simulation software from first principles; or
* Calculation of daylight compensation by the project energy performance simulation software based on user-defined daylight factors and solar radiation from the weather data file.

Where points are claimed in the *Light Quality* credit for the achievement of internal daylight levels, (refer to Automatic lighting controls) for details of required inputs to the project energy performance simulation model.

#### Modelling control of natural-ventilation and mixed-mode systems

The purpose of the inclusion of simulation control parameters for natural ventilation and mixed-mode systems is to provide consistency in simulations which could otherwise potentially produce widely varying results depending on the parameters applied, particularly where a system relies on occupant control. While there is no absolute correct specification of the control parameters, the following guidelines have been developed to be consistent with the holistic objectives of Green Star. Variation from these parameters, other than where specifically stated, is therefore not allowed.

For the following three systems, these controls are only required to be applied during the hours of project or plant operation, as specified in the operating schedules, not continuously. Natural ventilation openings would be expected to be fully closed outside of these times.

**Naturally-ventilated spaces with heating only**\
Modelling shall be completed on the basis of agreed minimum space temperature. Where the control temperature is less than the conventional value (21 °C for generally occupied spaces, or 18 °C for transitory occupied spaces), confirmation of client agreement of the minimum space temperature must be provided as part of the submission. The project team shall assume the following control actuation:

* Minimum operable device opening factor: 10%
* Heating system operates when $T\_{space} < T\_{lower} + 0.5$
* Operable devices open from minimum position when $T\_{OA} > 12\ °C$ and $T\_{space} \ge T\_{lower} + 0.5$ (i.e. heating is off in the space)
* Operable devices are fully open when $T\_{space} = 24\ °C$
* Operable devices close to minimum position during any hour when the following conditions occur:
  * $T\_{OA} > 35\ °C$
  * $v\_{wind} > 5$ m/s

Where $T\_{space}$ is the space temperature (dry bulb, operative or other as applicable to the method of temperature control), $T\_{lower}$ is the lower limit of the space temperature control range, $T\_{OA}$ is the outdoor air dry bulb temperature (all °C), and $v\_{wind}$ is the external wind speed (m/s).

Note that this means that natural ventilation is the only means of ventilation. Operable devices will be open at all time during occupancy, including when heating systems are operational, and outside air load will contribute directly to the room heating load. If operable devices are closed, no ventilation air enters the building.

**Naturally ventilated spaces with heating and cooling**\
Modelling shall be completed on the basis of agreed space temperature limits. Where the temperature control range is wider than the conventional range (21-24 °C for generally occupied spaces, or 18-25 °C for transitory occupied spaces), confirmation of client agreement of the temperature limits must be provided as part of the submission. The project team shall assume the following control actuation:

* Minimum operable device opening factor: 10%
* Heating system operates when $T\_{space} < T\_{lower} + 0.5$
* Operable devices open from minimum position when $T\_{OA} > 12\ °C$ and $T\_{space} \ge T\_{lower} + 0.5$ (i.e. heating is off in the space)
* Operable devices are fully open when $T\_{space} = T\_{upper} - 1.0$
* Mechanical cooling system operates when $T\_{space} > T\_{upper} - 0.5$
* Operable devices close to minimum position during any hour when the following conditions occurs:
  * $T\_{OA} > 30\ °C$ or $T\_{OA} < 15\ °C$
  * $v\_{wind} > 5$ m/s

Where $T\_{space}$ is the space temperature (dry bulb, operative or other as applicable to the method of temperature control), $T\_{lower}$ and $T\_{upper}$ are the lower and upper limits of the space temperature control range respectively, $T\_{OA}$ is the outdoor air dry bulb temperature (all °C), and $v\_{wind}$ is the ambient wind speed (m/s).

Note that this means that natural ventilation is the only means of ventilation. Operable devices will be open at all time during occupancy, including when cooling and heating systems are operational, and outside air load will contribute directly to the room heating or cooling load. If operable devices are closed, no ventilation air enters the building.

**Mixed-Mode Spaces**\
Modelling shall be completed on the basis of agreed space temperature limits. Where the temperature control range is wider than the conventional range (21-24 °C for generally occupied spaces, or 18-25 °C for transitory occupied spaces), confirmation of client agreement of the temperature limits must be provided as part of the submission. The project team shall assume the following control actuation, based on a mixed-mode strategy incorporating air conditioning:

* Heating system operates when $T\_{space} < T\_{lower} + 0.5$
* Heating system is deactivated and operable devices begin to open when $T\_{space} = T\_{lower} + 0.5$
* Operable devices are fully open when $T\_{space} = T\_{upper} - 1.0$
* Operable devices close when $T\_{space} = T\_{upper} - 0.5$
* Mechanical cooling system operates when $T\_{space} > T\_{upper} - 0.5$

Where $T\_{space}$ is the space temperature (dry bulb, operative or other as applicable to the method of temperature control), and $T\_{lower}$ and $T\_{upper}$ are the lower and upper limits of the space temperature control range respectively (all °C).

Systems revert to or continue air conditioning operation regardless of the internal temperature at any time when:

* $T\_{OA} > 30\ °C$ or $T\_{OA} < 15\ °C$
* $v\_{wind} > 5$ m/s

If the project is implementing an alternative form of automatic control, an alternative simulation control methodology may be proposed by the project team. A Technical Question must be submitted prior to implementation in the model. Where system operation is dependent on occupant control of operable devices, the above criteria may not be modified under any circumstances.

Note that 'Mixed-Mode Spaces' means that natural ventilation only operates when space temperature is within the centre of the control range and ambient conditions are favourable, when active heating and cooling systems are off. When operable devices are closed, ventilation occurs via the mechanical/AC system.

#### Modelling operation of air conditioning systems

The air conditioning system component of the energy model must account for all of the following features of system operation, as relevant to the system and its control:

* Individual fans, fan duties (air flow and static pressure) and fan part-load performance characteristics (for variable-speed control systems) (as NCC Section J clauses Specification S34C4(b) and S34C4(e))
* Economy cycle operation and control lockouts
* Heat recovery system operation, control lockouts, ancillary components (i.e. pumps in runaround coil systems and fan motors in rotary thermal wheel systems), and heat transfer effectiveness (sensible and latent components)
* Supply air temperature reset controls
* Ductwork distribution system heat gains and losses
* Minimum flow rate settings for variable volume systems
* Independent specification of supply air and outdoor air flow rates
* Humidity control, including dehumidification and humidification, as applicable
* Evaporative cooling stages
* Cycling of fan operation with temperature control systems in packaged air conditioning units.

#### Modelling operation of chilled water refrigeration plant

The chilled water plant component of the energy model must account for all of the following features of plant operation, as relevant to the system design and its control:

* Individual chillers, chiller capacities, and chiller part-load performance characteristics, including effect of compressor part-load, ambient relief and chilled water leaving temperature set point
* Hydraulic configuration of chillers, including parallel, series, sidecar and combinations of these
* Interlocked operation of chilled water and condenser water pumps, and variable speed control of pumps
* Operation of secondary pumps, including variable speed control and staged control of ganged pumps as applicable
* Staging and sequencing control of chillers in response to cooling load or other system variable
* Operation of oil sump heaters to maintain the oil temperature above a minimum threshold (where applicable)
* Chilled water set point temperature reset control
* Distribution pipework thermal gains
* Any additional cooling loads imposed on the chilled water system due to end uses other than space cooling, e.g. direct water cooling of process equipment
* Heat rejection to individual or multiple heat rejection units, including staging control of heat rejection units
* Condenser water temperature reset in response to ambient temperature and fan speed control in response to leaving water temperature
* Cooling tower fan power and variable speed control of fans
* Staging and sequencing control of cooling towers in response to heat rejection load or other system variable
* Any other requirements as per NCC Section J Specification S34C4(b) and S34C4(c), and, for pumping energy, per NCC Section J Specification S34C4(f)

Additionally, where the condenser water system is used to service heat rejection applications other than chilled water plant heat rejection, the following must be included, as relevant to the system design and control:

* Heat rejection from tenant supplementary heat rejection systems
* Any additional cooling loads imposed on the condenser water system due to end uses other than space cooling, e.g. direct water cooling of process equipment
* Operation of condenser water pumps, and variable-speed control of pumps

#### Modelling operation of heat pump hot water plant

The heating hot water plant component of the energy model must account for all of the following features of plant operation, as relevant to the system design and its control:

* Individual heat pumps/compressors, compressor capacities, and compressor part-load performance characteristics, including effect of compressor part-load, ambient relief and heating hot water leaving temperature set point
* Hydraulic configuration of heat pumps, including parallel, series, sidecar and combinations of these
* Interlocked operation and variable speed control of primary pumps
* Operation of secondary pumps, including variable speed control and staged control of ganged pumps as applicable
* Staging and sequencing control of heat pumps in response to heating load
* Operation of defrost cycle in response to ambient temperature and evaporator coil frost build up
* Operation of oil sump heaters to maintain the oil temperature above a minimum threshold (where applicable)
* Heating hot water set point temperature reset control
* Where 4-pipe chillers are implemented for shared heating and cooling duty, the availability of each unit for operation in only a single mode, or simultaneous operation if specified
* Distribution pipework thermal losses
* Any other requirements as per NCC Section J Specification S34C4(b) and S34C4(c), and, for pumping energy, per NCC Section J Specification S34C4(f)

Additionally, where other means of heating is provided, for example direct electric resistance heating, electric boilers or others, these should be fully described with the method of modelling their control and performance clearly explained.

#### Modelling domestic hot water systems

**Residential units in Class 2 buildings**\
For the purposes for NCC Section J Part J1V5, the *Proposed* and *Reference building* domestic hot water system energy consumption shall be based on the total domestic hot water usage calculated by the *Water Use calculator* (refer to Water Use) using the assumptions specified in NCC Specification 45 Clause S45C3 (1)(k). These assumptions include consumption rates, seasonal load profiles, water inlet temperature of the monthly ground temperature, water outlet temperature and standing losses.

**Other building types**\
The *Proposed* and *Reference building* domestic hot water system energy consumption shall be based on the total domestic hot water usage calculated by the *Water Use calculator* (refer to Water Use).

Where the *Proposed building* features multiple independent systems, the *Reference building* must include the same number of systems serving the same areas of the project. The total domestic hot water usage for the project, as determined by the *Water Use calculator*, must be apportioned to each of these systems. The project team must demonstrate how this has been calculated. This may be by consideration of the building area served by each system, the relative water usage for each end use in the project, by use of available reference or empirical data whether project specific or generic (e.g. the histograms in CIBSE Guide G), or any combination of these or other methods. Where the same system type with the same primary energy source serves more than one part of the project, they may be aggregated for calculation purposes.

Where the project team is of the opinion that hot water usage included in the *Water Use calculator* is outside of the scope of the applicable rating type, and should be excluded from the calculations, this should be addressed in a Technical Question.

Where a system is indirectly heated from another thermal energy source, e.g. heating hot water system or recovered energy from another process, the annual total water usage for the system shall be converted to an hourly usage profile by consideration of:

* The number of days of project operation and the extent of operation per day (i.e. whether all or only a proportion of the end uses served by the system are operational)
* The usage during each day of operation. This may be by consideration of the hours of operation of the project the relative water usage for each end use in the project and the times at which these are likely to occur, by use of available reference data whether project specific or generic (e.g. the histograms in CIBSE Guide G), or any combination of these.

Estimation of hourly usage profiles is necessary in these cases to ensure that consideration is given to the simultaneity of energy availability and energy demand, and the consequential impacts on overall energy utilisation and system efficiency and performance.

Calculations of energy consumption may generally be based on total annual delivery volume of domestic hot water, with due account made for system losses from tanks, pipework and other components as applicable. Refer to Reference building domestic hot water systems for default values, which are to be used for the *Reference building* in all cases, and for the *Proposed building* where the project team chooses. Where the project team chooses to apply loss factors for the *Proposed building* that is less than the *Reference building* values, these must be justified by the project team. Make up water temperature is the time-weighted average of the defined reference values. However, for indirect-fired systems as described above, calculations must be based on an hourly calculation of demand, losses and input. Such calculations must be completed as part of the overall energy and it is expected that the software would facilitate the calculation of losses based on system physical characteristics (including storage tank geometry and insulation thickness, and distribution pipework system length, representative diameter, and insulation thickness) and environmental temperatures (which may be based on unconditioned space temperatures calculated in the thermal simulation model, for example); where this is the case, *Proposed building* losses must be calculated in this way.

The general form of the annual energy calculation is:

$$
Q\_{input} = \frac{q\_{DHW}, c\_p, \Delta T}{1000, \eta\_{heater}} (1 + f\_{standing} + f\_{distribution})
$$

Where $Q\_{input}$ is the system total annual energy consumption (MJ/annum), $q\_{DHW}$ is the system annual domestic hot water usage (L/annum), $c\_p$ is the specific heat capacity of water (approximately 4.19 kJ/kg.K), $\Delta T$ is the temperature difference between supply and make up water temperatures (K), $\eta\_{heater}$ is the gross thermal efficiency of the water heater (%), $f\_{standing}$ is a factor accounting for standing losses in the system, and $f\_{distribution}$ is a factor accounting for distribution losses in the system. The factor 1000 adjusts from kilojoules to megajoules. Note that for the purpose of this calculation it is assumed that 1 L of water has a mass of exactly 1 kg, regardless of temperature.

Energy consumption of circulation pumps and other ancillary system components must be included in the building total energy consumption for both the *Proposed* and *Reference building*. For the *Reference building*, these values may be determined by prorating the *Proposed building* values as follows:

$$
X\_{ref} = \frac{q\_{ref}}{q\_{prop}} X\_{prop}
$$

Where *X* is the quantity to be prorated, *q* is the annual domestic hot water usage (L/annum) for the system, and subscripts *ref* and *prop* refer to the *Reference building* and *Proposed building* values respectively.

#### Modelling local shared services utilities

Where the project energy is sourced from a local shared services utility as one or more of electricity, chilled water, heating hot water or domestic hot water, the modelling shall be completed so as to determine the demand to be met at the point of interface with the utility service. Specific considerations that must be addressed in the model include:

* Hydraulic configuration of chilled water interface in chilled water system
* Staging and sequencing of chilled water interface where other conventional chilled water equipment is also provided in the building for duty operation
* Hydraulic configuration of heating hot water interface in heating hot water system
* Staging and sequencing of heating hot water interface where other conventional heating hot water equipment is also provided in the building for duty operation

Electrical demand loads shall be entered into the credit calculator as kWh values, and thermal demand loads (chilled, heating and domestic hot water) shall be entered into the credit calculator as MJ values.

#### Modelling water usage of evaporative cooling systems

Evaporative cooling (direct or indirect) system water consumption models must account for direct evaporation due to system cooling operation. Direct evaporation shall be based on latent heat of vaporisation of water of 2,450 kJ/kg.

In systems utilising variable-speed fan control, the effect of air speed on saturation efficiency of the evaporative media shall be considered (generally, the lower the air speed the higher the efficiency) (e.g. DOE, 2013).

#### Modelling water usage of heat rejection systems

Water consumption due to conventional cooling towers is calculated in the *Water Use calculator* based on the monthly total heat rejection load (refer to Water Use). The simulation is only required to calculate water usage of heat rejection systems where technology other than conventional cooling towers (e.g. adiabatic coolers) is used. The calculation must account for water usage due to:

* Direct evaporation due to system cooling operation
* Drift loss due to carry over of atomised water droplets in the air stream
* Blowdown loss due to the purging of high-mineral concentration water from either the condenser water (if an open condenser water system) or from the dedicated recirculation cooling water (if a closed condenser water system)

Direct evaporation shall be based on latent heat of vaporisation of water of 2,450 kJ/kg.

If water softening equipment is used to reduce the hardness of water prior to supply to the heat rejection equipment, the energy consumption of this equipment must be included in the project total energy consumption.

## References

ASHRAE, 2007. American Society of Heating, Refrigerating and Air-Conditioning Engineers. "Standard 140-2007. Standard method of test for the evaluation of building energy analysis computer programs," American Society of Heating, Refrigerating and Air-Conditioning Engineers, USA. 2007.

ASHRAE, 2011. American Society of Heating, Refrigerating and Air-Conditioning Engineers. "HVAC Applications Handbook," American Society of Heating, Refrigeration and Air Conditioning, USA. 2011.

ASHRAE, 2013. American Society of Heating, Refrigerating and Air-Conditioning Engineers. "Fundamentals Handbook," American Society of Heating, Refrigeration and Air Conditioning, USA. 2013.

ASHRAE, 2013. American Society of Heating, Refrigerating and Air-Conditioning Engineers. "Standard 55-2013. Thermal environmental conditions for human occupanct," American Society of Heating, Refrigeration and Air Conditioning, USA. 2013.

ASHRAE, 2022. American Society of Heating, Refrigerating and Air-Conditioning Engineers. "Standard 90.1-2007. Energy Standard for Sites and Buildings Except Low-Rise Residential Buildings (SI Edition)," American Society of Heating, Refrigerating and Air-Conditioning Engineers, USA. 2007.

ATTMA, 2010. Air Tightness Testing and Measurement Association. "Technical Standard L2 Measuring Air Permeability of Building Envelopes (Non-Dwellings)," Air Tightness Testing and Measurement Association, UK. October 2010. <http://www.attma.org/wp-content/uploads/2013/10/ATTMA-TSL2-Issue-1.pdf> (accessed 12th March 2014).

ABCB, 2022. Australian Building Codes Board. "Building Code of Australia Volume One: Class 2 to Class 9 Buildings," Australian Building Codes Board, Australia. 2022.

ABCB, 2025. Australian Building Codes Board. "Building Code of Australia Volume One: Class 2 to Class 9 Buildings," Australian Building Codes Board, Australia. 2025.

Bannister, 2011. Bannister, Paul, Chris Bloomfield, and Haibo Chen. "Empirical Prediction of Office Building Lift Energy Consumption," Proceedings of Building Simulation 2011: 12th Conference of International Building Performance Simulation Association, Australia. November 2011. <http://www.ibpsa.org/proceedings/BS2011/P\\_1815.pdf> (accessed 12th March 2014).

Barney, 2007. Barney, Gina. "Energy Efficiency of Lifts – Measurement, Conformance, Modelling, Prediction and Simulation," Gina Barney Associates, UK. 2007. <http://www.cibseliftsgroup.org/docs/Barney-on-energy%20efficiency%20of%20lifts.pdf> (accessed 13th March 2013).

BC, 2006. Building Commission Victoria. "Practice Note 2006-09. Building energy analysis for commercial buildings," Building Commission Victoria, Australia. June 2006. Superseded.

BSI, 1991. British Standards Institute. "BS 5925:1991 Code of Practice for Ventilation principles and designing for natural ventilation," British Standards Institute, UK. 1991.

CIBSE, 2004. Chartered Institute of Building Services Engineers. "CIBSE Guide G: Public health engineering," Chartered Institute of Building Services Engineers, UK. 2004.

CIBSE, 2005. Chartered Institute of Building Services Engineers. "CIBSE Guide D: Transportation systems in buildings," Chartered Institute of Building Services Engineers, UK. 2005.

CIBSE, 2015. Chartered Institute of Building Services Engineers. "CIBSE Guide A: Environmental Design," Chartered Institute of Building Services Engineers, UK. 2015.

DEE, 2018. Department of Environment and Energy. "Australian National Greenhouse Accounts: National Greenhouse Accounts Factors" Department of Environment and Energy, Australia. July 2018. <https://www.environment.gov.au/system/files/resources/80f603e7-175b-4f97-8a9b-2d207f46594a/files/national-greenhouse-accounts-factors-july-2018.pdf> (accessed 6th May 2019).

DOE, 2013. United States Department of Energy. "Energy Plus Engineering Reference Manual," United States Department of Energy, USA. October 2013. <http://apps1.eere.energy.gov/buildings/energyplus/pdfs/engineeringreference.pdf> (accessed 19th March 2014).

E3, 2010. Energy Efficient Strategies. "Appliance Energy Consumption in Australia: Equations for Appliance Star Ratings," Equipment Energy Efficiency (E3) Committee, Australia. September 2010. <http://www.energyrating.gov.au/wp-content/uploads/2011/02/appliance-star-ratings1.pdf> (accessed 26th March 2014).

EPA, 2013. United States Environment Protection Agency. "Glossary of Climate Change Terms," United States Environment Protection Agency, USA. 2013. <http://www.epa.gov/climatechange/glossary.html> (accessed 13th March 2014).

IEA, 2012. International Energy Agency. "IEA Statistics: Natural Gas Information," International Energy Agency, France. 2012. <http://www.iea.org/media/training/presentations/statisticsmarch/NaturalGasInformation.pdf> (accessed 13th March 2014).

IPCC, 1996. Intergovernmental Panel on Climate Change. "Revised 1996 IPCC Guidelines for National Greenhouse Gas Inventories," UN. <http://www.ipcc-nggip.iges.or.jp/public/gl/invs1.html> (accessed 13th March 2014).

ISO, 2012. International Organization for Standardization. "ISO 25745-1:2012 Energy performance of lifts, escalators and moving walks – Part 1: Energy measurement and verification," International Organization for Standardization, Switzerland. 2012

ISO, 2015. International Organization for Standardization. "ISO 25745-2:2015 Energy performance of lifts, escalators and moving walks – Part 2: Energy calculation and classification for lifts (elevators)," International Organization for Standardization, Switzerland. 2015

NIST, 2001. Emmerich, Steven J and Andrew K Persily. "State-of-the-Art Review of CO2 Demand Controlled Ventilation Technology and Application," Building and Fire Research Laboratory, National Institute of Standards and Testing, USA. March 2001. <http://fire.nist.gov/bfrlpubs/build01/PDF/b01117.pdf> (accessed 9th March 2014).

SA, 2008. Standards Australia. "AS/NZS 4234:2008 Heated water systems – Calculation of energy consumption," Standard Australia. 2008.

SA, 2008. Standards Australia. "AS/NZS 4776.2:2008 Liquid-chilling packages using the vapour compression cycle, Part 2: Minimum energy performance standard (MEPS) and compliance requirements," Standards Australia. 2008.

SA, 2020. Standards Australia. "AS/NZS 1158.3.1:2005 Lighting for roads and public spaces. Part 3.1: Pedestrian area (Category P) lighting - Performance and design requirements," Standards Australia. 2020.

SA, 2024. Standards Australia. "AS 1668.2:2024 Standards Australia. The use of ventilation and airconditioning in buildings, Part 2: Mechanical ventilation in buildings," Standards Australia. 2024.

SA, 2024. Standards Australia. "AS 1668.4:2024 Standards Australia. The use of ventilation and airconditioning in buildings, Part 4: Natural ventilation in buildings," Standards Australia. 2024.

UNEP, 2010: United Nations Energy Program. "Common Carbon Metric: Protocol for Measuring Energy Use and Reporting Greenhouse Gas Emissions from Building Operations (Draft for Pilot Testing)," Sustainable Buildings Climate Initiative, United Nations Energy Program, USA. 2010. <http://www.unep.org/sbci/pdfs/Common-Carbon-Metric-for\\_Pilot\\_Testing\\_220410.pdf> (accessed 13th March 2014).

## <mark style="color:$primary;">Version control</mark>

This guide applies to projects registered under version 1.1 of Green Star Buildings (all revisions). This guide is not applicable to projects targeting Green Star Buildings v1. These projects should refer to the Energy Use calculation guide v1.

<table><thead><tr><th width="208.5">Release</th><th width="185.75">Date</th><th>Description of changes</th></tr></thead><tbody><tr><td>1</td><td>19/06/2026</td><td>Initial release for Green Star Buildings v1.1 (Adapted from Green Star Buildings v1)</td></tr></tbody></table>


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/calculation-guides/energy-use-calculation-guide.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.