> For the complete documentation index, see [llms.txt](https://greenstarresources.gbca.au/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/buildings-v1-.1-change-log.md).

# Buildings v1 .1 change log

{% hint style="warning" %}
**Release 2: 06/05/2026**

Updated to provide further clarification in Healthy category.

[#version-control](#version-control "mention")
{% endhint %}

## How to use this document

This document outlines key changes between Green Star Buildings version 1 revision C and Green Star Buildings version 1.1 revision A (released 17 December 2025). It summarises the updates made throughout the Submission Guidelines and provides an explanation for the change.

This is not guidance on what can be substituted from version 1.1 into version 1. There will be a separate credit substitution guide published that outlines this in detail.

### Revision A

Green Star Buildings v1.1 Revision A was released on 17 December 2025. It is a maintenance revision as outlined on pages 35 and 36 in the Rating tool updates section of the Introduction in the Submission Guidelines, and supersedes the version released on 21 October 2025. This revision includes an updated Refrigerant Systems Impacts credit, and how it is included in the Climate Positive Pathway.

Revisions made between the original release of Green Star Buildings v1.1 and Revision A are included in the relevant credit line item. They are denoted by a ‘Rev A’ heading. All other changes listed are updates from v1.

### GBCA strategy

This document references GBCA’s strategy which can be found [here](https://gbca-web.s3.amazonaws.com/media/documents/gbca-strategy-for-board-papers.pdf). Further information available on the GBCA website.

## <mark style="color:$primary;">Climate Positive Pathway</mark>

The Climate Positive Pathway in version 1.1 has been updated to be a continuation of the version 1 pathway and reflects a renewed strategy based on industry advances. Key updates on the pathway include:

* Updated registration years that trigger a new set of requirements to 2025, 2028 and 2030.
* Removed the requirement where the project will be required to meet more stringent requirements if it is certified or reaches practical completion (as per FAQ F-00372) after 2030.
* Replaced Upfront Carbon Emissions and Other Emissions Sources credits with Upfront Carbon Reduction and Upfront Carbon Compensation and removed the requirement for 5 star projects to demonstrate that all remaining emissions are offset.
* Introduced specific requirements for Refrigerant Systems Impacts

Refer to the relevant credit for credit specific changes.

### Version 1

<figure><img src="https://749968417-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FRL05MQuVhZhkDMQBuGrI%2Fuploads%2FEcJGrGpHr96JstauPMm2%2Fv1%20CPP.png?alt=media&amp;token=fd7a3554-d57a-4842-906b-0a384520c317" alt=""><figcaption></figcaption></figure>

\*Refer to FAQ F-00372 where the requirement has been changed to the practical completion date rather than certification date.

### Version 1.1: Revision A

<figure><img src="https://749968417-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FRL05MQuVhZhkDMQBuGrI%2Fuploads%2FPAyHdWI3fsjyvuIvNNem%2Fv1.1%20CPP.png?alt=media&amp;token=fcd8e80f-bb8b-49b1-8fed-3b13316435ac" alt=""><figcaption></figcaption></figure>

## <mark style="color:$primary;">General</mark>

<details>

<summary><a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/introduction.md"><strong>Introduction</strong></a></summary>

<table><thead><tr><th width="461">Summary of change</th><th>Reasoning</th></tr></thead><tbody><tr><td><p>Updated content to reflect updates made for v1.1.</p><p><br>Updated guidance on fitout scope and Green Star Buildings – Apartments pathway.</p><p><br>Added section on common definitions.</p><p><br>Added guidance on credits and requirements involving tenanted buildings.</p><p><br>Minor wording updates throughout.</p></td><td rowspan="2">For clarity and alignment with v1.1 updates.</td></tr><tr><td><p><strong>Rev A</strong><br>Updated description for Guidance.</p><p><br>Updated Minimum Expectations and Climate Positive Pathway sections to reflect changes to the Refrigerant Systems Impacts credit.</p></td></tr></tbody></table>

</details>

<details>

<summary><strong>All credits</strong></summary>

<table><thead><tr><th width="463">Summary of change</th><th>Reasoning</th></tr></thead><tbody><tr><td>Added Scope of credit section to all credits.</td><td>Additional guidance on the building attributes, stakeholders and/or the project stages the credit requirements are applied to.</td></tr><tr><td><p>Added the name of the relevant criteria in the Criteria summary table.<br><br>Updated structure of credit so <em>Requirements</em> are followed by <em>Definitions, Guidance</em> and <em>Submission content</em>.</p><p><br>Added an explainer under <em>Definitions, Guidance</em> and <em>Submission content</em>.</p></td><td>For clarity.</td></tr><tr><td><p><strong>Rev A</strong></p><p>Updated explainer under <em>Guidance.</em></p></td><td>For clarity.</td></tr></tbody></table>

</details>

## <mark style="color:$primary;">Responsible</mark>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/1-or-industry-development.md">1 | Industry Development</a></summary>

#### [/pages/fIyaVbBI1M3xfU7S0fS6#id-1.1.1-green-star-accredited-professional](https://greenstarresources.gbca.au/pages/fIyaVbBI1M3xfU7S0fS6#id-1.1.1-green-star-accredited-professional "mention")

<table><thead><tr><th width="460">Summary of change</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirements to specify relevant GSAP qualification and clarify the role of the GSAP.</td><td>Updated requirements to include FAQ F-00422 and to clarify purpose of GSAP.</td></tr><tr><td>Additional guidance on timing for GSAP project involvement in <em>Guidance</em>.<br><br>Minor wording updates throughout.</td><td>Additional guidance to clarify intent of timing requirements.</td></tr></tbody></table>

#### [/pages/fIyaVbBI1M3xfU7S0fS6#id-1.1.2-financial-transparency](https://greenstarresources.gbca.au/pages/fIyaVbBI1M3xfU7S0fS6#id-1.1.2-financial-transparency "mention")

<table><thead><tr><th width="460">Summary of change</th><th>Reasoning</th></tr></thead><tbody><tr><td><p>Additional guidance on terminology used in template in <em>Guidance</em>.</p><p><br>Minor wording updates throughout.</p></td><td>Additional guidance to clarify requirements and criteria intent.</td></tr></tbody></table>

#### [/pages/fIyaVbBI1M3xfU7S0fS6#id-1.1.3-marketing-sustainability-achievements](https://greenstarresources.gbca.au/pages/fIyaVbBI1M3xfU7S0fS6#id-1.1.3-marketing-sustainability-achievements "mention")

<table><thead><tr><th width="460">Summary of change</th><th>Reasoning</th></tr></thead><tbody><tr><td><p>Updated requirements to include the future installation of digital screens, construction hoarding, and the project’s marketing and communications strategy and promotional material to be used to demonstrate compliance. </p><p></p><p>Updated requirements on providing a case study to require the completion of the <em>Green Star Case Study Template</em>.</p></td><td>Updated requirements to better align with project timings and GBCA marketing strategy.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/2-or-responsible-construction.md">2 | Responsible Construction</a></summary>

<table><thead><tr><th width="460">Summary of change</th><th>Reasoning</th></tr></thead><tbody><tr><td>Scope of credit updated to include demolition and early works.</td><td>Updated scope to reflect original credit intent.</td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/UTfBGxue3SSPQeCGFHmb#id-2.0.3-construction-and-demolition-waste-diversion](https://greenstarresources.gbca.au/pages/UTfBGxue3SSPQeCGFHmb#id-2.0.3-construction-and-demolition-waste-diversion "mention")

<table><thead><tr><th width="460">Summary of change</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria name to <em>Construction and Demolition Waste Diversion</em>.</td><td>Updated criteria name for clarity.</td></tr><tr><td>Requirements on special waste moved to <em>Definitions</em> and <em>Guidance</em>.</td><td>Requirements on special waste moved for clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/UTfBGxue3SSPQeCGFHmb#id-2.1.1-increased-construction-and-demolition-waste-diversion](https://greenstarresources.gbca.au/pages/UTfBGxue3SSPQeCGFHmb#id-2.1.1-increased-construction-and-demolition-waste-diversion "mention")

<table><thead><tr><th width="460">Summary of change</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria name to <em>Increased Construction and Demolition Waste Diversion</em>.</td><td>For clarity to differentiate from the criteria in Minimum Expectation.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/3-or-verification-and-handover.md">3 | Verification and Handover</a></summary>

<table><thead><tr><th width="460">Summary of change</th><th>Reasoning</th></tr></thead><tbody><tr><td><p>Minor update to outcome to focus on “higher” level of performance in operation.</p><p><br>Minor wording updates throughout.</p></td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/RKlOiWJ2RV08GmWWpE9P#id-3.0.1-metering-and-monitoring](https://greenstarresources.gbca.au/pages/RKlOiWJ2RV08GmWWpE9P#id-3.0.1-metering-and-monitoring "mention")

<table><thead><tr><th width="460">Summary of change</th><th>Reasoning</th></tr></thead><tbody><tr><td><p>Updated structure in <em>Requirements</em> to group requirements related to distribution separately from those related to the attributes of the meters and monitoring system.</p><p><br>Clarified requirements regarding the use of CIBSE’s TM39 Building Energy Metering by referencing steps 7-10.</p><p><br>Clarified requirements for Class 2 build to sell apartments.</p><p><br>Guidance for tenanted buildings included in <em>Requirements.</em></p><p><br>Clarified requirements regarding distribution with examples in <em>Guidance</em>.</p></td><td>For clarity and additional guidance for project teams.</td></tr><tr><td>Simplified requirements on meter accuracy and the monitoring system.</td><td>Simplified requirements to remove overlapping.</td></tr></tbody></table>

#### [/pages/RKlOiWJ2RV08GmWWpE9P#id-3.0.2-commissioning-and-tuning](https://greenstarresources.gbca.au/pages/RKlOiWJ2RV08GmWWpE9P#id-3.0.2-commissioning-and-tuning "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td><p>Simplified requirements for environmental performance targets and clarified timing requirement.</p><p><br>Simplified requirements for services and maintainability review and updated timing requirement.<br><br>Simplified requirements for building systems tuning.</p></td><td>Simplified requirements to align with availability of project information and remove repetition.</td></tr><tr><td>Clarified requirements for building commissioning and updated timing requirements.</td><td>Updated timing requirement for clarity and to better align with project timelines.</td></tr><tr><td><p>AIRAH DA 27 and SA TA 5342:2021 added as recognised commissioning standards.</p><p><br>All recognised commissioning standards moved to <em>Definitions</em> from <em>Requirements</em>.</p></td><td>Updated to include additional commissioning standards based on industry feedback.</td></tr><tr><td>Nominated building systems included in <em>Definitions</em>.</td><td>Updated to include FAQ F-00188.</td></tr><tr><td>Clarified requirements for airtightness and updated requirements on sharing the results with the building owner. <br><br>Expanded on guidance for airtightness target setting, testing and opportunities for improvement in <em>Guidance</em>.</td><td>Updated to include FAQ F-00064, F-00397 and F-00416.</td></tr></tbody></table>

#### [/pages/RKlOiWJ2RV08GmWWpE9P#id-3.1.1-soft-landings-approach](https://greenstarresources.gbca.au/pages/RKlOiWJ2RV08GmWWpE9P#id-3.1.1-soft-landings-approach "mention")

<table><thead><tr><th width="460.7999267578125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Removed description of soft landings framework from requirements.</td><td>To focus contents of requirements on what needs to be demonstrated for compliance.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/4-or-responsible-resource-management.md">4 | Responsible Resource Management</a></summary>

#### [/pages/5KmmU4jSt2v4Zx9qhqlP#id-4.0.1-collection-of-waste-streams](https://greenstarresources.gbca.au/pages/5KmmU4jSt2v4Zx9qhqlP#id-4.0.1-collection-of-waste-streams "mention")

<table><thead><tr><th width="459.199951171875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated structure in <em>Requirements</em> to group requirements related to waste streams separately from attributes to facilitate collection and to include chute intakes.<br><br>Guidance for fitout works included in <em>Requirements</em>.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/5KmmU4jSt2v4Zx9qhqlP#id-4.0.2-dedicated-waste-storage-area](https://greenstarresources.gbca.au/pages/5KmmU4jSt2v4Zx9qhqlP#id-4.0.2-dedicated-waste-storage-area "mention")

<table><thead><tr><th width="459.199951171875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated structure in <em>Requirements</em> to group requirements related to the dedicated collection area separately from attributes to improve access to the dedicated area.<br><br>Updated requirements to include reference to AS 2890.2:2018.<br><br>Guidance for tenanted buildings included in <em>Requirements.</em></td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/5KmmU4jSt2v4Zx9qhqlP#id-4.0.3-safe-and-efficient-access-to-waste-storage](https://greenstarresources.gbca.au/pages/5KmmU4jSt2v4Zx9qhqlP#id-4.0.3-safe-and-efficient-access-to-waste-storage "mention")

<table><thead><tr><th width="459.199951171875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria name to <em>Safe and Efficient Access to Waste Storage.</em></td><td>Updated criteria name to reflect outcome of requirements.</td></tr><tr><td>Clarified that contractor refers to a waste contractor, not head contractor.<br><br>Waste specialist defined in <em>Definitions</em>.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/5-or-responsible-procurement.md">5 | Responsible Procurement</a></summary>

<table><thead><tr><th width="460.800048828125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Clarified requirements with additional references to ISO 20400:2017 included and updated guidance on timing requirements.<br><br>Requirement included for design and construct contracts.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr><tr><td>Building materials and building services defined in <em>Definitions</em>.</td><td>Updated to include FAQ F-00255.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/6-or-responsible-structure.md">6 | Responsible Structure</a></summary>

<table><thead><tr><th width="460.800048828125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Reduced total points in <em>Credit Achievement</em> to 2 points from 3 points.</td><td>Reduced based on industry feedback and to assign the point to the Impacts Disclosure credit to drive metrics disclosure.</td></tr><tr><td>Stepped points introduced.</td><td>Stepped points introduced to respond to industry feedback of broadening recognition of outcomes.</td></tr><tr><td>Removed definitions for other building layers in <em>Definitions</em>.<br><br>Guidance updated on Responsible Products Value in <em>Guidance</em>.</td><td>Updated guidance to reflect updates to Responsible Products Framework and release of guidance documents.</td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/7-or-responsible-envelope.md">7 | Responsible Envelope</a></summary>

<table><thead><tr><th width="460.800048828125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Stepped points introduced.</td><td>Stepped points introduced to respond to industry feedback of broadening recognition of outcomes.</td></tr><tr><td>Removed definitions for other building layers in <em>Definitions</em>.<br><br>Definition for envelope updated to remove reference to suspended slabs.<br><br>Guidance updated on Responsible Products Value in <em>Guidance</em>.</td><td>Updated guidance to reflect updates to Responsible Products Framework and release of guidance documents.</td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/8-or-responsible-systems.md">8 | Responsible Systems</a></summary>

<table><thead><tr><th width="460.800048828125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Removed definitions for other building layers in <em>Definitions</em>.<br><br>Guidance updated on Responsible Products Value in <em>Guidance</em>.</td><td>Updated guidance to reflect updates to Responsible Products Framework and release of guidance documents.</td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/9-or-responsible-finishes.md">9 | Responsible Finishes</a></summary>

<table><thead><tr><th width="460.800048828125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Removed definitions for other building layers in <em>Definitions</em>.<br><br>Definition for finishes updated to include reference to insulation and the elements are installed inside the envelope of the building.<br><br>Guidance updated on Responsible Products Value in <em>Guidance</em>.</td><td>Updated guidance to reflect updates to Responsible Products Framework and release of guidance documents.</td></tr><tr><td>Guidance for fitout works included in <em>Requirements</em>.<br><br>Minor wording updates throughout.</td><td>For clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/responsible/10-or-impacts-disclosure.md">10 | Impacts Disclosure</a></summary>

New credit.

</details>

## <mark style="color:$primary;">Healthy</mark>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/11-or-clean-air.md">11 | Clean Air</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Minor update to the outcome to include risk from the spread of infectious diseases.<br><br>References to AS1668.2 and AS1668.4 updated to align with the latest 2024 version.<br><br>Clarified approach for mixed use buildings for criteria with pathways based on building class.<br><br>Minor wording updates throughout.<br><br>Additions to <em>Definitions</em>.<br><br>Moved <em>Regularly occupied areas</em> section from <em>Additional information</em> to <em>Definitions</em>. Moved compliance of at least 95% of regularly occupied areas to the relevant requirements. Compliance table to be included in Submission Template.</td><td>For clarity</td></tr></tbody></table>

#### 11.0.1 Ventilation System Attributes: [/pages/pkgmSd0rhzKfOSqFAlqz#id-11.0.1-ventilation-system-attributes](https://greenstarresources.gbca.au/pages/pkgmSd0rhzKfOSqFAlqz#id-11.0.1-ventilation-system-attributes "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirements for Class 2 and 3 buildings pathway in <em>Separation from pollutants</em> to have additional increments of design airflow rates and added an exclusion <a data-footnote-ref href="#user-content-fn-1">for separation distances within a SOU where the airflow rate is &#x3C;200L/s</a>.</td><td>Update to include FAQ F-00443.</td></tr><tr><td>Guidance on what is considered an outdoor air intake moved to <em>Requirements</em> from <em>Guidance</em>.<br><br>Updated requirements for <em>Cleaning ductwork</em> to include recognised standard in <em>Requirements</em>.<br><br>Clarified that the cleaning of ductwork occurs after installation.<br><br>Guidance for tenanted buildings included in <em>Requirements</em>.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### 11.0.2 Provision of Outdoor Air and 11.1.2 Provision of Outdoor Air: [/pages/pkgmSd0rhzKfOSqFAlqz#id-11.0.2-provision-of-outdoor-air](https://greenstarresources.gbca.au/pages/pkgmSd0rhzKfOSqFAlqz#id-11.0.2-provision-of-outdoor-air "mention") and [/pages/pkgmSd0rhzKfOSqFAlqz#id-11.1.2-provision-of-outdoor-air](https://greenstarresources.gbca.au/pages/pkgmSd0rhzKfOSqFAlqz#id-11.1.2-provision-of-outdoor-air "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Additional requirement in Class 2 and 3 buildings pathway to provide a dedicated make-up air path for kitchen, bathroom and laundry spaces in <em>Minimum Expectation</em>.</td><td>Additional requirement for dedicated make-up air paths to complement updates to the NCC 2022 for all wet areas to have exhaust fans.</td></tr><tr><td>Updated requirements in Class 2 and 3 buildings pathway with additional pathway for mixed mode ventilation and clarified to be required for all regularly occupied, habitable rooms.<br><br>Updated requirements for naturally ventilated, Class 2 and 3 buildings pathway in <em>Credit Achievement</em> to be supplemented by a mechanical ventilation system that provides a minimum design supply airflow.<br><br>Updated requirements in All other buildings pathway with additional pathway for mixed mode ventilation and a natural ventilation pathway.<br><br>Updated requirements for Performance based approach to require sensors to be installed in the breathing zone and clarified that the location of the sensors are justified by a qualified mechanical engineer.</td><td>Updated requirements to clarify approach for mixed mode ventilation, natural ventilation and location of sensors.</td></tr><tr><td>New Equivalent clean airflow pathway introduced for <em>Credit Achievement</em>.</td><td>New Equivalent clean airflow pathway introduced to account for new ASHRAE Standard 241:2023.</td></tr><tr><td>Guidance for tenanted buildings included in <em>Requirements</em>.</td><td>Additional definitions and guidance for clarity for project teams.</td></tr></tbody></table>

#### 11.0.3 Exhaust or Elimination of Pollutants: [/pages/pkgmSd0rhzKfOSqFAlqz#id-11.0.3-exhaust-or-elimination-of-pollutants](https://greenstarresources.gbca.au/pages/pkgmSd0rhzKfOSqFAlqz#id-11.0.3-exhaust-or-elimination-of-pollutants "mention")

<table><thead><tr><th width="460.7999267578125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated structure in <em>Requirements</em> to separate different approaches into pathways.<br><br>Guidance for fitout works included in <em>Requirements</em>.<br><br>Updated requirements for <em>Limiting pollutant sources</em> to include recognised standards in <em>Requirements</em>.</td><td>For clarity and additional guidance for project teams.</td></tr><tr><td>Recognised standards also updated to include DE-UZ 219 and UL 2819.</td><td>Update to recognised standards to include FAQ F-00169 and reference the latest versions of the standards.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/12-or-light-quality.md">12 | Light Quality</a></summary>

<table><thead><tr><th width="460.7999267578125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Clarified approach for mixed use buildings for criteria with pathways based on building class.<br><br>Minor wording updates throughout.<br><br>Additions to <em>Definitions</em>.<br><br>Moved <em>Regularly occupied areas</em> section from <em>Additional information</em> to <em>Definitions</em>. Moved compliance of at least 95% of regularly occupied areas to the relevant requirements. Compliance table to be included in Submission Template.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/n7qoN5PsqR8np2eyU1Lp#id-12.0.1-lighting-comfort](https://greenstarresources.gbca.au/pages/n7qoN5PsqR8np2eyU1Lp#id-12.0.1-lighting-comfort "mention")

<table><thead><tr><th width="460.7999267578125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated scope to be regularly occupied, internal and unenclosed covered areas. Typical exclusions also included.</td><td>Scope updated to reflect original credit intent.</td></tr><tr><td>Updated requirements to include sector specific pathways for Class 2, 3 and 9c buildings and high bay lighting in Class 7b and 8 buildings and an alternative approach to flicker-free lighting.</td><td>Update to include FAQ F-00331 and F-00309 for flexibility in targeting the criteria based on building typology.</td></tr><tr><td>Removed requirement related to maintained illuminance levels.</td><td>Requirement removed to avoid repetition with the uniformity values and the <em>Artificial Lighting</em> criteria in the <em>Credit Achievement</em>, and to simplify the <em>Minimum Expectation</em>.</td></tr><tr><td>Guidance for fitout works included in <em>Requirements</em>.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/n7qoN5PsqR8np2eyU1Lp#id-12.0.2-glare-from-light-sources](https://greenstarresources.gbca.au/pages/n7qoN5PsqR8np2eyU1Lp#id-12.0.2-glare-from-light-sources "mention")

<table><thead><tr><th width="460.7999267578125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Removed requirement related to LEDs in Prescriptive method 1.</td><td>Requirement removed to avoid repetition with the Performance method.</td></tr><tr><td>Updated Performance method to note the use of <em>AS/NZS 1680.1</em> only when maximum UGR values are not available in the <em>AS/NZS 1680.2</em> series.</td><td>Updated requirement to use building space type specific targets.</td></tr><tr><td>Guidance for fitout works included in <em>Requirements</em>.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/n7qoN5PsqR8np2eyU1Lp#id-12.0.3-daylight-strategy](https://greenstarresources.gbca.au/pages/n7qoN5PsqR8np2eyU1Lp#id-12.0.3-daylight-strategy "mention")

<table><thead><tr><th width="460.7999267578125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria name to <em>Daylight Strategy</em>.</td><td>For clarity to differentiate from the criteria in <em>Credit Achievement.</em></td></tr><tr><td>Simplified requirements for <em>Daylight strategy</em>.</td><td>Simplified requirements to remove repetition.</td></tr></tbody></table>

#### [/pages/n7qoN5PsqR8np2eyU1Lp#id-12.1.1-artificial-lighting](https://greenstarresources.gbca.au/pages/n7qoN5PsqR8np2eyU1Lp#id-12.1.1-artificial-lighting "mention")

<table><thead><tr><th width="460.7999267578125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirements so that only other regularly occupied areas in Class 2, 3 and 9c buildings are required to demonstrate contrast and visual interest.</td><td>Requirements updated to reflect building class.</td></tr><tr><td>Clarified requirements for horizontal illuminance.<br><br>Clarified including of kitchen and study areas as task areas as a minimum for the Class 2, 3 and 9c buildings pathway.<br><br>Guidance for fitout works included in <em>Requirements</em>.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/n7qoN5PsqR8np2eyU1Lp#id-12.1.2-daylight](https://greenstarresources.gbca.au/pages/n7qoN5PsqR8np2eyU1Lp#id-12.1.2-daylight "mention")

<table><thead><tr><th width="460.7999267578125">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirement for external glare control to be required in spaces where occupants are expected to be stationary.</td><td>Updated requirement to reflect project experience.</td></tr><tr><td>Updated structure in <em>Requirements</em> to separate approaches for different building classes into pathways.<br><br>Moved definition for high levels of daylight into <em>Requirements</em>.<br><br>Examples of excluded spaces included in <em>Guidance.</em></td><td>For clarity and additional guidance for project teams.</td></tr><tr><td><strong>Rev A</strong><br>Updated requirements to include requirements for Class 2 or 3 spaces where blinds or screens are not installed by the developer.</td><td>Updated to align with the Green Star Buildings – Apartments pathway.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/13-or-acoustic-comfort.md">13 | Acoustic Comfort</a></summary>

#### [/pages/egbWSYuHOt60T0JiCPXE#id-13.0.1-acoustic-comfort-strategy](https://greenstarresources.gbca.au/pages/egbWSYuHOt60T0JiCPXE#id-13.0.1-acoustic-comfort-strategy "mention")

<table><thead><tr><th width="459.199951171875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Minor wording updates throughout.</td><td>For clarity.</td></tr><tr><td>Added note in <em>Requirements</em> that where <em>Credit Achievement</em> is demonstrated, the <em>Acoustic Comfort Strategy</em> is deemed to be met.</td><td>Note added as outcome of demonstrating <em>Credit Achievement</em> meets the purpose of the <em>Acoustic Comfort Strategy</em>.</td></tr></tbody></table>

#### [/pages/egbWSYuHOt60T0JiCPXE#id-13.1.1-acoustic-performance](https://greenstarresources.gbca.au/pages/egbWSYuHOt60T0JiCPXE#id-13.1.1-acoustic-performance "mention")

<table><thead><tr><th width="459.199951171875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated performance level structure to be under one criterion in the <em>Requirements.</em><br><br>Updated applicability of acoustic criteria to be based on building class space type.<br><br>Clarified approach for mixed use buildings.<br><br>Clarified requirements for measuring <em>Maximum Internal Noise Levels</em> to align with measuring <em>Minimum Internal Noise Levels.</em><br><br>Minor wording updates throughout.<br><br>Guidance for fitout works included in <em>Requirements</em>.</td><td>For clarity.</td></tr><tr><td>Updated requirement for noise measurements in naturally ventilated spaces to comply with <em>Maximum Internal Noise Levels</em> and <em>Minimum Internal Noise Levels</em> when windows are partially open.</td><td>Updated measurement requirements for naturally ventilated spaces based on industry feedback.</td></tr><tr><td><em>Privacy</em> renamed to <em>Sound transmission</em> in the <em>Acoustic Separation</em> requirements.<br><br>Updated NCC references to include sections of NCC 2022 in <em>Acoustic Separation</em> requirements.</td><td>Renaming of <em>Privacy</em> to <em>Sound transmission</em> to align with terminology in NCC 2022.</td></tr><tr><td>Updated requirements for <em>Sound insulation</em> to include a pathway for Class 2 and 3 buildings.</td><td>Updates to <em>Sound insulation</em> to ensure Class 2 and 3 buildings exceed NCC 2022 requirements.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/14-or-exposure-to-toxins.md">14 | Exposure to Toxins</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated scope of credit to be all fully enclosed covered areas but excluding carparks from regularly occupied areas.</td><td>Correction to align with original intent of the credit.</td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/iVsdxdaRTYnx5jI5S5qR#id-14.0.1-paints-adhesives-sealants-and-carpets](https://greenstarresources.gbca.au/pages/iVsdxdaRTYnx5jI5S5qR#id-14.0.1-paints-adhesives-sealants-and-carpets "mention"), [/pages/iVsdxdaRTYnx5jI5S5qR#id-14.0.2-engineered-wood-products](https://greenstarresources.gbca.au/pages/iVsdxdaRTYnx5jI5S5qR#id-14.0.2-engineered-wood-products "mention"), [/pages/iVsdxdaRTYnx5jI5S5qR#id-14.0.3-banned-or-highly-toxic-materials](https://greenstarresources.gbca.au/pages/iVsdxdaRTYnx5jI5S5qR#id-14.0.3-banned-or-highly-toxic-materials "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated structure in <em>Requirements</em> to separate different approaches into pathways.<br><br>Clarified that projects that do not have existing buildings or retaining existing buildings are exempt from the <em>Banned or Highly Toxic Materials</em> criterion.</td><td>For clarity and additional guidance for project teams.</td></tr><tr><td>Added note that where <em>Credit Achievement</em> is demonstrated using Laboratory testing or Building monitoring methods, evidence for <em>Minimum Expectation</em> can be reduced however this is not applicable to Real-time measurements method.</td><td>Note added to balance the level of accuracy provided by the different measurement methods.</td></tr><tr><td>Exclusions for <em>Paints, Adhesives, Sealants, and Carpets</em> and <em>Engineered Wood Products</em> criteria and theoretical VOC calculations included in <em>Guidance</em>.</td><td>Additional guidance based on FAQ F-00332 and F-00345.</td></tr></tbody></table>

#### [/pages/iVsdxdaRTYnx5jI5S5qR#id-14.1.1-voc-and-formaldehyde-levels](https://greenstarresources.gbca.au/pages/iVsdxdaRTYnx5jI5S5qR#id-14.1.1-voc-and-formaldehyde-levels "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirement have additional pathways to verifying toxin levels using building monitoring systems and real-time measurements for small buildings only.<br><br>Updated requirements for the number of samples to be taken to have a pathway for buildings with low height to width ratios (e.g., warehouse-type or shopping centres).</td><td>Allows more flexibility for targeting the credit.</td></tr><tr><td>Updated requirements for Laboratory testing method to specify concentration limits for different VOC elements.</td><td>Updated requirements for Laboratory testing method to be reflective of the information that can be attained from laboratory testing.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/15-or-amenity-and-comfort.md">15 | Amenity and Comfort</a></summary>

#### [/pages/AW54VLhl6uI4satVMjbH#id-15.1.1-comfortable-amenity-rooms](https://greenstarresources.gbca.au/pages/AW54VLhl6uI4satVMjbH#id-15.1.1-comfortable-amenity-rooms "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria name to <em>Comfortable Amenity Rooms</em> and simplified criteria.</td><td>Updated criteria name and criteria to reflect outcome of requirements.</td></tr><tr><td>Updated structure in <em>Requirements</em> to separate determining the number of occupants from the room design and quantity of rooms. Number of occupants to be different for building types which are purposely built for visitors and for other building types with examples provided in <em>Guidance</em>. The amenity rooms sizes to be governed by room type and the attributes of the amenity rooms are prescribed. The number of rooms to be based on the number of occupants.</td><td>Updated requirements to ensure amenity rooms are provided for those who need it and amenity rooms that reflect best practice design are provided.</td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/healthy-3/16-or-connection-to-nature.md">16 | Connection to Nature</a></summary>

#### [/pages/FkxUAOcaz876UkwCa96P#id-16.1.1-views](https://greenstarresources.gbca.au/pages/FkxUAOcaz876UkwCa96P#id-16.1.1-views "mention"), [/pages/FkxUAOcaz876UkwCa96P#id-16.1.2-plants](https://greenstarresources.gbca.au/pages/FkxUAOcaz876UkwCa96P#id-16.1.2-plants "mention") and [/pages/FkxUAOcaz876UkwCa96P#id-16.1.3-nature-inspired-design](https://greenstarresources.gbca.au/pages/FkxUAOcaz876UkwCa96P#id-16.1.3-nature-inspired-design "mention")

<table><thead><tr><th width="459.199951171875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirement to separate <em>Nature-inspired Design</em> from the <em>Plants</em> criterion and integrate <em>Interaction with Nature</em> from v1 into the <em>Plants</em> criterion.<br><br>Three pathways introduced into the <em>Plants</em> criterion with the pathways based on the level of access that the building operator has. </td><td>Update to include FAQ F-00333 and to allow more flexibility for targeting the credit.</td></tr><tr><td>Guidance on fitout scope removed.</td><td>Guidance on fitout scope removed due to the introduction of pathways.</td></tr><tr><td>Additions to <em>Definitions</em>.<br><br>Updated guidance on <em>Nature-inspired Design</em> in <em>Guidance</em>.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

</details>

## <mark style="color:$primary;">Resilient</mark>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/resilient-2/17-or-climate-resilience.md">17 | Climate Resilience</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated credit name to <em>Climate Resilience</em>.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/7SKHKUDDZrvP9pADZpbw#id-17.1.1-climate-change-risk-and-adaptation-assessment](https://greenstarresources.gbca.au/pages/7SKHKUDDZrvP9pADZpbw#id-17.1.1-climate-change-risk-and-adaptation-assessment "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirement to include the IPCC AR6 Socio-economic Pathway 3 (SSP 3-7.0) as an option for future projections.<br><br>Updated requirement to justify why the primary and secondary variables from <em>AS 5334:2013</em> that were not assessed are irrelevant to the project.<br><br>List of primary and secondary variables included in <em>Guidance.</em><br><br>Updated requirement to specify specific stakeholders to be consulted with assessing risks.<br><br>Added requirement to provide treatment options for residual risks.<br><br>Updated requirement to include <em>ISO 14090:2019</em> and <em>ISO 14091:2021</em> as alternate standards to align with.<br><br>Updated requirement to specify specific stakeholders to communicate the outcomes of the assessment to and for building owner to sign off on original and residual risk ratings.</td><td>Updated requirements to provide additional transparency to the project’s climate change risk assessment process, to account for the release of new industry documents and best practice standards, and to provide clarity on stakeholders that are to be involved.</td></tr><tr><td><strong>Rev A</strong><br>Guidance for scenario when external stakeholders do not respond included in <em>Guidance</em>.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/resilient-2/18-or-operations-resilience.md">18 | Operations Resilience</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Guidance for tenanted buildings included in <em>Requirements</em>.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/7SPEovYns0R4myhhpeP1#id-18.1.3-power-loss-for-shelter-in-place](https://greenstarresources.gbca.au/pages/7SPEovYns0R4myhhpeP1#id-18.1.3-power-loss-for-shelter-in-place "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirement to provide a strategy on how the building will provide for its occupants when they must shelter in place during a power loss event. Requirements included on the basic needs that the building are to provide in this scenario.<br><br>Additions to <em>Definitions.</em></td><td>Updated requirements to clarify the intent of the credit.</td></tr><tr><td><strong>Rev A</strong><br>Updated criteria name to <em>Power Loss for Shelter in Place</em> from <em>Addressing Power Loss</em>.<br><br>Replaced building’s “functional purpose” with “function in the event of an acute shock” in <em>Requirements</em>.</td><td>Updated criteria name and replaced wording to clarify the intent of the credit.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/resilient-2/19-or-community-resilience.md">19 | Community Resilience</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Simplified criteria.<br><br>Updated requirements structure to separate the community resilience plan and the implementation of attributes and activities</td><td>For clarity.</td></tr><tr><td>Updated requirement to include identification of social indicators and the incorporation of the local council’s community resilience plan in the project’s community resilience plan where available.<br><br>Clarified requirements on community engagement.</td><td>Updated requirement to help projects gauge changes to the community and encourage project alignment with existing local council guidance.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/resilient-2/20-or-heat-resilience.md">20 | Heat Resilience</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirements to include white cement concrete as a compliant material.</td><td>Updated to provide additional compliance methods.</td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/resilient-2/21-or-grid-resilience.md">21 | Grid Resilience</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated credit outcome.<br><br>Removed the <em>Active Generation and Storage Systems</em> criterion.<br><br>Updated <em>Demand Response</em> criterion to focus on having a capable energy management system and a load shedding strategy.</td><td>Outcome and requirements updated to avoid repetition with updated <em>Energy Source</em> credit and to provide more flexibility on how load shedding is achieved.</td></tr><tr><td>Guidance for tenanted buildings included in <em>Requirements</em>.<br><br>Minor wording updates throughout.</td><td>For clarity.</td></tr></tbody></table>

</details>

## <mark style="color:$primary;">Positive</mark>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/22-or-energy-source.md">22 | Energy Source</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated credit outcome.</td><td>Updated to reflect updated credit focus.</td></tr><tr><td>Updated Climate Positive Pathway.<br><br>Reduced points available for <em>Credit Achievement</em> and <em>Exceptional Performance</em> to 2 points each.</td><td>Reduced points to reflect the Climate Positive Pathway strategy.</td></tr><tr><td>Updated to have two pathways and a placeholder for a future Industrial pathway.</td><td>Pathways introduced to provide more flexibility for targeting the credit</td></tr><tr><td>Removed additional Leadership Challenge point that is awarded when the Climate Positive Pathway is achieved.</td><td>Leadership Challenge removed to reflect the updated Climate Positive Pathway strategy.</td></tr></tbody></table>

#### [/pages/vqD8Vh2UQ7bnU6H3SxjN#id-22a.0.1-all-electric-building-services](https://greenstarresources.gbca.au/pages/vqD8Vh2UQ7bnU6H3SxjN#id-22a.0.1-all-electric-building-services "mention"), [/pages/vqD8Vh2UQ7bnU6H3SxjN#id-22a.0.2-remaining-emissions-roadmap](https://greenstarresources.gbca.au/pages/vqD8Vh2UQ7bnU6H3SxjN#id-22a.0.2-remaining-emissions-roadmap "mention"),  [/pages/vqD8Vh2UQ7bnU6H3SxjN#id-22b.0.1-all-electric-building-services](https://greenstarresources.gbca.au/pages/vqD8Vh2UQ7bnU6H3SxjN#id-22b.0.1-all-electric-building-services "mention") and [/pages/vqD8Vh2UQ7bnU6H3SxjN#id-22b.0.2-remaining-emissions-roadmap](https://greenstarresources.gbca.au/pages/vqD8Vh2UQ7bnU6H3SxjN#id-22b.0.2-remaining-emissions-roadmap "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Added the All-electric Building Services criterion.<br><br>Updated the Zero Carbon Action Plan criterion to the Remaining Emissions Roadmap criterion to focus on a roadmap for process loads to be fossil fuel free where present.</td><td>Updated to reflect the updated Climate Positive Pathway strategy.</td></tr></tbody></table>

#### Credit Achievement

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirements where for <a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/22-or-energy-source.md#pathway-a-owner-operated-pathway"><em>Pathway A: Owner Operated pathway</em></a>, projects have an option of criteria to demonstrate while for <a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/22-or-energy-source.md#pathway-b-tenant-operated-pathway"><em>Pathway B: Tenanted Operated pathway</em></a><em>,</em> projects must demonstrate compliance with both.<br><br>Additional <em>Renewable Ready</em> criterion to focus on having an energy management system that sets the building up to be grid-interactive and a load shifting strategy.<br> <br><em>Pathway B: Tenant Operated pathway</em> has an additional requirement for tenant engagement.</td><td>Updated requirements to reflect the updated Climate Positive Pathway strategy and is tailored to what the respective building type has influence on.</td></tr><tr><td>Updated the <em>Renewable Electricity</em> criterion to reduce the shortest contract lengths.</td><td>Updated to include FAQ F-00330.</td></tr></tbody></table>

#### Exceptional Performance

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirements where for  <a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/22-or-energy-source.md#pathway-a-owner-operated-pathway"><em>Pathway A: Owner Operated pathway</em></a>, projects must demonstrate compliance with both criteria in the Credit Achievement while for <a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/22-or-energy-source.md#pathway-b-tenant-operated-pathway"><em>Pathway B: Tenanted Operated pathway</em></a>, projects must encourage with their tenants to encourage the procurement of renewable energy.</td><td>Updated requirements to reflect the updated Climate Positive Pathway strategy and is tailored to what the respective building type has influence on</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/23-or-energy-use.md">23 | Energy Use</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated Climate Positive Pathway.</td><td>Updated to reflect updated Climate Positive Pathway strategy.</td></tr><tr><td>New pathway for small non-residential buildings introduced and a placeholder for a future Industrial pathway. Alphabetical identifier added to pathways.<br><br>Updated guidance for mixed use projects in Pathways.</td><td>Pathways introduced to provide more flexibility for targeting the credit.</td></tr><tr><td>Leadership Challenge removed to reflect the updated Climate Positive Pathway strategy.</td><td>Removed additional Leadership Challenge point that is awarded when the Climate Positive Pathway is achieved.</td></tr><tr><td>NCC references updated to align with NCC 2022.</td><td>Updated guidance and NCC references for clarity and additional guidance for project teams.</td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [23 | Energy Use](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/23-or-energy-use.md#pathway-a-reference-building-pathway)

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirement to remove the allowance for on-site renewable energy generation systems connected behind the meter to be used to calculate reductions in energy use for <em>Credit Achievement</em> and <em>Exceptional Performance</em>.</td><td>Updated on-site renewable requirements based on alignment with global trend towards addressing ‘actual‘ systems energy efficiency.<br><br>Updated to reflect the updated Climate Positive Pathway strategy.</td></tr><tr><td>Guidance for tenanted buildings included in <em>Requirements</em>.</td><td>For clarity and additional guidance for project teams.</td></tr><tr><td>Stepped points introduced in <em>Credit Achievement</em> and <em>Exceptional Performance</em>.</td><td>Stepped points introduced to respond to industry feedback of broadening recognition of outcomes.</td></tr></tbody></table>

#### [23 | Energy Use](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/23-or-energy-use.md#pathway-b-nabers-commitment-agreement-pathway)

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Additional requirement to demonstrate the NABERS Energy Estimate model rating progress metric meets the specified star ratings and on-site renewable energy generation systems connected behind the meter are excluded from this metric.<br><br>Updated star rating requirements for Class 3 hotels, Class 5 offices and Class 6 shopping centres.</td><td>Updated to reflect the updated Climate Positive Pathway strategy.</td></tr><tr><td>Added requirements for Class 6 retail stores, Class 7b warehouses and cold stores, Class 9b schools and Class 9c residential aged care and retirement living facilities.</td><td>More sectors introduced to provide more flexibility for targeting the credit.</td></tr><tr><td>Stepped points introduced in <em>Credit Achievement</em> and <em>Exceptional Performance</em>.</td><td>Stepped points introduced to respond to industry feedback of broadening recognition of outcomes.</td></tr></tbody></table>

#### [23 | Energy Use](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/23-or-energy-use.md#pathway-c-residential-pathway)

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirements in the <em>NatHERS ratings</em> criterion for all performance levels.</td><td>Updated requirements in the NatHERS ratings criterion to reflect NCC 2022.</td></tr><tr><td>Updated requirement for hot water pipes outside of sole-occupancy units in the Domestic Hot Water in <em>Building Services Requirements</em>.<br><br>Updated requirements for DX split systems to use ZERL star ratings in Heating and Cooling of Sole Occupancy Units in <em>Building Services Requirements</em>.</td><td>Updated to align with the Green Star Buildings – Apartments pathway and industry practice.</td></tr><tr><td>Removed On-site solar PV requirements in v1 in <em>Building Services Requirements</em>.</td><td>Removed requirement to reflect the updated Climate Positive Pathway strategy.</td></tr><tr><td><strong>Rev A</strong><br>Added a definition for external clothes drying facilities in <em>Definitions</em>.</td><td>For clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/24-or-upfront-carbon-reduction.md">24 | Upfront Carbon Reduction</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated credit name to <em>Upfront Carbon Reduction</em> from <em>Upfront Carbon Emissions</em>.</td><td>Updated credit name to reflect outcome of credit.</td></tr><tr><td>Updated Climate Positive Pathway.<br><br>Updated to have two pathways including a new Benchmark pathway (Pathway A) and a placeholder for a future NABERS Embodied Carbon pathway. Alphabetical identifier added to pathways.<br><br>Removed additional Leadership Challenge point that is awarded when the Climate Positive Pathway is achieved.</td><td>Updated to reflect the updated Climate Positive Pathway strategy.</td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [24 | Upfront Carbon Reduction](https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/24-or-upfront-carbon-reduction.md#pathway-b-reference-building-pathway)

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Replaced the <em>Upfront Carbon Emissions calculator</em> with a new <em>Upfront Carbon Reduction calculator</em>.<br><br>Updated requirement to calculate upfront carbon based on <em>NABERS Embodied Carbon</em> rules including how stored biogenic carbon and carbon neutral products do not contribute to upfront carbon emission reductions and use of the <em>NABERS National material emission factors database</em>.</td><td>Updated to align with the <em>NABERS Embodied Carbon</em> tool rules and resources.</td></tr><tr><td>Updated requirement to require the peer review of changes to the default material specifications from an independent experienced professional.</td><td>Updated to require a peer review to improve robustness and transparency of the reference building.</td></tr><tr><td>Updated the <em>Offsetting Demolition Works</em> criterion to be named <em>Existing Building Compensation</em>. <br><br>Updated requirements to allow the use of the benchmarks in Pathway A: Benchmark pathway to determine the embodied emissions of the existing building.</td><td>Updated <em>Existing Building Compensation</em> criterion for clarity and to improve usability.</td></tr><tr><td>Stepped points introduced in <em>Credit Achievement</em> and <em>Exceptional Performance</em>.</td><td>Stepped points introduced to respond to industry feedback of broadening recognition of outcomes.</td></tr></tbody></table>

</details>

<details>

<summary><strong>Other Carbon Emissions</strong></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Credit removed and replaced by the <em>Upfront Carbon Compensation</em> and <em>Refrigerant Systems Impacts</em> credits.</td><td>Updated to reflect the updated Climate Positive Pathway strategy.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/25-or-upfront-carbon-compensation.md">25 | Upfront Carbon Compensation</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Credit to focus on compensation aspects that were in the <em>Other Carbon Emissions</em> credit in v1 and included in updated Climate Positive Pathway.<br><br>Scope of credit to focus on upfront carbon emissions. <br><br>Accepted compensation types include stored biogenic carbon, Climate Active Carbon Neutral certified products and nature-based offsets.</td><td>Separate credit introduced to reflect the updated Climate Positive Pathway strategy and the <em>NABERS Embodied Carbon</em> tool rules.</td></tr><tr><td>Stepped points included in <em>Exceptional Performance</em>.</td><td>Stepped points included to respond to industry feedback of broadening recognition of outcomes.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/26-or-refrigerant-systems-impacts.md">26 | Refrigerant Systems Impacts</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Credit to focus on refrigerant aspects that were in the <em>Other Carbon Emissions</em> credit in v1 and included in updated Climate Positive Pathway.</td><td>Separate credit introduced to reflect the updated Climate Positive Pathway strategy.</td></tr><tr><td><strong>Rev A</strong><br>Updated credit name to <em>Refrigerant Systems Impacts</em> from <em>Future-ready Refrigeration Equipment.</em><br><br>Updated Climate Positive Pathway to require <em>Exceptional Performance</em> to be met by projects registering from 2030 onwards and targeting 5 Star. Leadership Challenge also updated to “Low Global Harm Refrigerants” from “Ultra-low GWP Refrigerants”.<br><br>Low global harm refrigerants defined in <em>Definitions</em>.<br><br>Guidance in the Leadership Challenge included in <em>Guidance</em>.<br><br>Updated criteria in <em>Criteria</em> for all performance levels.</td><td>Updated to align with <a href="https://gbca-web.s3.amazonaws.com/media/documents/freeze-frame-discussion-paper-nov-2025.pdf">Freeze Frame discussion paper</a>.</td></tr></tbody></table>

#### [/pages/9oYA5iKr24HQIduDCddR#id-26.0.1-future-ready-buildings](https://greenstarresources.gbca.au/pages/9oYA5iKr24HQIduDCddR#id-26.0.1-future-ready-buildings "mention"), [/pages/9oYA5iKr24HQIduDCddR#id-26.0.2-weighted-gwp-limit](https://greenstarresources.gbca.au/pages/9oYA5iKr24HQIduDCddR#id-26.0.2-weighted-gwp-limit "mention") and [/pages/9oYA5iKr24HQIduDCddR#id-26.0.3-leak-detection](https://greenstarresources.gbca.au/pages/9oYA5iKr24HQIduDCddR#id-26.0.3-leak-detection "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>New <em>Minimum Expectation</em> introduced to provide a register of all refrigerant-using equipment and refrigerants, leak detection systems and potential alternate refrigerants for the same equipment types.</td><td><em>Minimum Expectation</em> introduced to reflect the updated Climate Positive Pathway strategy and to address upcoming challenges in building design due to changes in the refrigerant market.</td></tr><tr><td><strong>Rev A</strong><br>Updated requirements to provide a design review checklist alongside a register.<br><br>New requirement for all refrigerants to meet a weighted average.<br><br>Moved requirement to provide a leak detection system to <em>Minimum Expectation</em> from <em>Credit Achievement.</em></td><td>Updated to align with <a href="https://gbca-web.s3.amazonaws.com/media/documents/freeze-frame-discussion-paper-nov-2025.pdf">Freeze Frame discussion paper</a>.</td></tr></tbody></table>

#### [/pages/9oYA5iKr24HQIduDCddR#id-26.1.1-low-gwp-limits](https://greenstarresources.gbca.au/pages/9oYA5iKr24HQIduDCddR#id-26.1.1-low-gwp-limits "mention"), [/pages/9oYA5iKr24HQIduDCddR#id-26.1.2-low-initial-charge](https://greenstarresources.gbca.au/pages/9oYA5iKr24HQIduDCddR#id-26.1.2-low-initial-charge "mention") and [/pages/9oYA5iKr24HQIduDCddR#id-26.1.3-compensation-of-refrigerant-emissions](https://greenstarresources.gbca.au/pages/9oYA5iKr24HQIduDCddR#id-26.1.3-compensation-of-refrigerant-emissions "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>New criteria to focus on limiting the GWP of the refrigerants installed. Compensation kept as an alternative.</td><td>New criteria to bring a stronger focus on individual systems and the refrigerant selected.</td></tr><tr><td><strong>Rev A</strong><br>Updated requirements to require compensation of refrigerant emissions after GWP of refrigerants have been limited.<br><br>Updated GWP limits for small and medium AC from 700 to 500.</td><td>Updated to align with <a href="https://gbca-web.s3.amazonaws.com/media/documents/freeze-frame-discussion-paper-nov-2025.pdf">Freeze Frame discussion paper</a>.</td></tr></tbody></table>

#### [/pages/9oYA5iKr24HQIduDCddR#id-26.2.1-lower-gwp-limits](https://greenstarresources.gbca.au/pages/9oYA5iKr24HQIduDCddR#id-26.2.1-lower-gwp-limits "mention") and [/pages/9oYA5iKr24HQIduDCddR#id-26.2.2-lower-initial-charge](https://greenstarresources.gbca.au/pages/9oYA5iKr24HQIduDCddR#id-26.2.2-lower-initial-charge "mention")

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>New criteria to focus on limiting the GWP of the refrigerants installed even further and compensation of remaining refrigerant emissions.</td><td>New criteria to bring a stronger focus on individual systems and the refrigerant selected.</td></tr><tr><td><strong>Rev A</strong><br>Updated requirements to remove compensation of refrigerant emissions.<br><br>Updated GWP limits for medium AC from 500 to 150.<br><br>Updated to note that if <em>Exceptional Performance</em> is demonstrated, <em>Credit Achievement</em> and the <em>Weighted GWP Limit</em> criterion in <em>Minimum Expectation</em> is considered met. Projects are still required to demonstrate compliance with the <em>Future-ready Buildings</em> and <em>Leak Detection</em> criteria in <em>Minimum Expectation.</em></td><td>Updated to align with <a href="https://gbca-web.s3.amazonaws.com/media/documents/freeze-frame-discussion-paper-nov-2025.pdf">Freeze Frame discussion paper</a>.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/27-or-low-emissions-transport.md">27 | Low-Emissions Transport</a></summary>

<table><thead><tr><th width="460.00006103515625">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>New credit that adopts the electric vehicle charging related requirements from the <em>Movement and Place</em> credit in v1.</td><td>Moved to better reflect the outcome of the requirements.</td></tr><tr><td>Updated requirements to include different pathways for Class 2, Class 5 or 6 and all other building classes.</td><td>Pathways introduced to provide a more relevant approach for different building typologies.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/28-or-design-for-circularity.md">28 | Design for Circularity</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>New credit to replace the Life Cycle Impacts credit in v1.</td><td>Included to align with GBCA’s strategic priorities.</td></tr><tr><td><strong>Rev A</strong><br>Updated criteria in Criteria for Exceptional Performance.</td><td>Correction to align with credit content.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/29-or-water-use.md">29 | Water Use</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Guidance included for mixed use projects in <em>Pathways</em>.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/begDGgl5HVHAMw2Qsx0u#id-29.0.1-sanitary-fixture-and-appliance-efficiency](https://greenstarresources.gbca.au/pages/begDGgl5HVHAMw2Qsx0u#id-29.0.1-sanitary-fixture-and-appliance-efficiency "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Additional fixture types included.</td><td>Included to provide more flexibility for targeting the credit.</td></tr></tbody></table>

#### [/pages/begDGgl5HVHAMw2Qsx0u#id-29.1.1-reducing-water-use](https://greenstarresources.gbca.au/pages/begDGgl5HVHAMw2Qsx0u#id-29.1.1-reducing-water-use "mention"), [/pages/begDGgl5HVHAMw2Qsx0u#id-29.1.2-recycled-water-infrastructure](https://greenstarresources.gbca.au/pages/begDGgl5HVHAMw2Qsx0u#id-29.1.2-recycled-water-infrastructure "mention") and [/pages/begDGgl5HVHAMw2Qsx0u#id-29.2.1-reducing-water-use](https://greenstarresources.gbca.au/pages/begDGgl5HVHAMw2Qsx0u#id-29.2.1-reducing-water-use "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirements for Class 2 and 3 to reduce benchmarks.</td><td>Updated to align with the Green Star Buildings – Apartments pathway.</td></tr><tr><td>Stepped points introduced in <em>Credit Achievement</em> and <em>Exceptional Performance</em>.</td><td>Stepped points introduced to respond to industry feedback of broadening recognition of outcomes.</td></tr></tbody></table>

</details>

<details>

<summary><strong>Life Cycle Impacts</strong></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Credit removed and replaced by the <em>Design for Circularity</em> credit.</td><td>Updated to align with GBCA’s strategic priorities.</td></tr></tbody></table>

</details>

## <mark style="color:$primary;">Places</mark>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/places-2/30-or-movement-and-place.md">30 | Movement and Place</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated credit outcome.</td><td>Updated outcome to reflect updated credit focus.</td></tr><tr><td>Updated criteria.</td><td>Updated criteria to reflect changes in the credit.</td></tr><tr><td>Scope of <em>Changing Facilities</em> criterion moved to <em>Scope of credit</em> section.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr><tr><td><strong>Rev A</strong><br>Scope of credit updated to note that typically all regular occupants and visitors are included for the whole credit.<br><br>Clarified that the scope is different only for the <em>Changing Facilities</em> criterion.</td><td>For clarity.</td></tr></tbody></table>

#### [/pages/7isN5iK0Tx6oKSfrNuxt#id-30.0.1-changing-facilities](https://greenstarresources.gbca.au/pages/7isN5iK0Tx6oKSfrNuxt#id-30.0.1-changing-facilities "mention") and [/pages/7isN5iK0Tx6oKSfrNuxt#id-30.0.2-safe-ingress](https://greenstarresources.gbca.au/pages/7isN5iK0Tx6oKSfrNuxt#id-30.0.2-safe-ingress "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Guidance for statutorily required facilities and mixed-use buildings with tenants included in requirements.<br><br>Updated criterion name and simplified requirements for <em>Safe Ingress</em> criterion.<br><br>Additions to <em>Definitions.</em></td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/7isN5iK0Tx6oKSfrNuxt#id-30.1.1-sustainable-transport](https://greenstarresources.gbca.au/pages/7isN5iK0Tx6oKSfrNuxt#id-30.1.1-sustainable-transport "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Removed electric vehicle charging from this criterion and moved to a new credit, <a href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/positive-3/27-or-low-emissions-transport.md"><em>Low-Emissions Transport</em></a>, in the Positive category.</td><td>Moved to better reflect the outcome of the requirements.</td></tr><tr><td>Combined <em>Reducing Private Vehicle Use</em> criterion into this criterion.</td><td>Combined criteria for clarity as outcomes aligned.</td></tr><tr><td>Removed emission reduction requirement.</td><td>Removed requirement to reflect updated credit focus.</td></tr></tbody></table>

#### [/pages/7isN5iK0Tx6oKSfrNuxt#id-30.1.2-active-transport-facilities](https://greenstarresources.gbca.au/pages/7isN5iK0Tx6oKSfrNuxt#id-30.1.2-active-transport-facilities "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated <em>Bicycle Parking Facilities</em> criterion name in v1 to <em>Active Transport Facilities</em>.</td><td>Updated criterion name to reflect updated requirements.</td></tr><tr><td>Simplified requirements for bicycle parking. <br><br>Guidance on the location of bicycle parking/storage included in <em>Guidance</em>.</td><td>For clarity.</td></tr><tr><td>Updated requirements to include requirements for personal electric vehicles (e.g., electric bikes, electric scooters).</td><td>Updated requirements to reflect rise in personal electric vehicles.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/places-2/31-or-enjoyable-places.md">31 | Enjoyable Places</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria.</td><td>Updated to reflect changes to <em>Credit Achievement.</em></td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### 31.1.1 Publicly Accessible Spaces: [/pages/Flk2A0HD99Fp9I2mgY75#id-31.1.1-publicly-accessible-spaces](https://greenstarresources.gbca.au/pages/Flk2A0HD99Fp9I2mgY75#id-31.1.1-publicly-accessible-spaces "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirement to note new spaces are provided by the project, for all building types except Class 2 and 3 to include a minimum area in the communal space requirement and to allow the use of a needs analysis where the communal area is less than the prescribed minimum.</td><td>Updated requirements to ensure meaningful, new spaces are provided and to provide more flexibility for targeting the credit.</td></tr><tr><td>Added approach to determining the number of occupants to <em>Definitions</em>.</td><td>For clarity and additional guidance for project teams.</td></tr><tr><td><a data-footnote-ref href="#user-content-fn-2">Guidance allowing not completely public spaces to comply for Class 2 and 3 projects removed.</a></td><td>Removed to align credit outcome for all building classes.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/places-2/32-or-contribution-to-place.md">32 | Contribution to Place</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria.</td><td>Updated to reflect changes to <em>Credit Achievement.</em></td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/Sie6yqfFtLObv9JDCYDG#id-32.1.1-contribution-to-urban-context](https://greenstarresources.gbca.au/pages/Sie6yqfFtLObv9JDCYDG#id-32.1.1-contribution-to-urban-context "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria to combine the <em>Urban Context Report</em> and <em>Independent Design Review</em> criteria from v1 into one criterion,</td><td>To clarify that both criteria are intended to achieve the same outcome.</td></tr><tr><td>Updated requirements in the <em>Independent design review</em> pathway to include design principles. Further information on design principles provided in <em>Guidance</em>.<br><br>Simplified requirements and updated requirement structure for the <em>Independent design review</em> pathway to separate requirements related to staging, the composition of the design review panel and the design principles.</td><td>Updated and simplified requirements for clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/places-2/33-or-culture-heritage-and-identity.md">33 | Culture, Heritage and Identity</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria summary in <em>Criteria</em>.</td><td>Updated to reflect changes to <em>Credit Achievement</em>.</td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/FfzLtYuaPS9Gb7VqxZD6#id-33.1.1-local-identity](https://greenstarresources.gbca.au/pages/FfzLtYuaPS9Gb7VqxZD6#id-33.1.1-local-identity "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria to combine the <em>Community Led Design Response</em> and <em>Independent Design Review</em> criteria from v1 into one criterion.</td><td>To clarify that both criteria are intended to achieve the same outcome.</td></tr><tr><td>Updated requirements in the Independent design review pathway to include design principles. Further information on design principles provided in <em>Guidance</em>.</td><td>For clarity.</td></tr></tbody></table>

</details>

## <mark style="color:$primary;">People</mark>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/people-3/34-or-inclusive-construction-practices.md">34 | Inclusive Construction Practices</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria summary in <em>Criteria.</em></td><td>Updated to reflect changes to in credit.</td></tr><tr><td>Scope of credit updated to include demolition and early works workers if contracted or sub-contracted under the same contract as the main works.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr><tr><td><strong>Rev A</strong><br>Clarified scope of credit applies to all workers contracted under the head contractor, including employees of the head contractor.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/BG5YcQ7wptNmrOwc1Dnv#id-34.0.1-facilities-and-equipment](https://greenstarresources.gbca.au/pages/BG5YcQ7wptNmrOwc1Dnv#id-34.0.1-facilities-and-equipment "mention") and [/pages/BG5YcQ7wptNmrOwc1Dnv#id-34.0.2-policies-and-training](https://greenstarresources.gbca.au/pages/BG5YcQ7wptNmrOwc1Dnv#id-34.0.2-policies-and-training "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated to separate requirements related to facilities and equipment, and policies and training into separate criteria.<br><br>Updated requirements related to facilities and equipment to specify acoustic and visual privacy for bathroom facilities and changing amenities and to require a policy on having fit-for-purpose PPE. <br><br>Updated requirements related to policies and training to replace requirement to “empower a diverse lead team to manage these policies on-site” with ensuring the on-site leadership team is empowered to implement policies on site.</td><td>For clarity.</td></tr><tr><td>Additional guidance included.</td><td>Additional guidance to include FAQ F-00294.</td></tr></tbody></table>

#### [/pages/BG5YcQ7wptNmrOwc1Dnv#id-34.1.1-physical-and-mental-health-programs](https://greenstarresources.gbca.au/pages/BG5YcQ7wptNmrOwc1Dnv#id-34.1.1-physical-and-mental-health-programs "mention") and [/pages/BG5YcQ7wptNmrOwc1Dnv#id-34.1.2-program-evaluation](https://greenstarresources.gbca.au/pages/BG5YcQ7wptNmrOwc1Dnv#id-34.1.2-program-evaluation "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Removed <em>Needs Analysis</em> criterion in v1.</td><td>Removed based on industry feedback.</td></tr><tr><td>Updated requirements in the <em>Physical and Mental Health Programs</em> criterion to reduce the number of areas to be covered by small projects under a contract value of $10 million to three.</td><td>Updated to account for limited resourcing in small buildings.</td></tr><tr><td>Updated requirement in the <em>Program Evaluation</em> criterion to note the evaluation report is to be provided to the head contractor’s head office and sub-contractors.</td><td>Updated for clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/people-3/35-or-first-nations-inclusion.md">35 | First Nations Inclusion</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated credit name to <em>First Nations Inclusion</em> from <em>Indigenous Inclusion</em>.</td><td>Updated based on preferred language as recommended by a First Nations consultant.</td></tr><tr><td>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/IQVBqIt44bytcNRX1Voj#id-35.1.1-cultural-capability](https://greenstarresources.gbca.au/pages/IQVBqIt44bytcNRX1Voj#id-35.1.1-cultural-capability "mention"), [/pages/IQVBqIt44bytcNRX1Voj#id-35.1.2-reconciliation-action-plan](https://greenstarresources.gbca.au/pages/IQVBqIt44bytcNRX1Voj#id-35.1.2-reconciliation-action-plan "mention") and [/pages/IQVBqIt44bytcNRX1Voj#id-35.1.3-inclusion-of-first-nations-design](https://greenstarresources.gbca.au/pages/IQVBqIt44bytcNRX1Voj#id-35.1.3-inclusion-of-first-nations-design "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirement to require cultural competency training for key project personnel.<br><br>Removed requirement in the Inclusion of <em>First Nations Design</em> criterion to demonstrate the adoption of the Australian Indigenous Design Charter.</td><td>Inclusion of cultural competency training and removal of Australian Indigenous Design Charter based on recommendations from First Nations consultant.</td></tr><tr><td>Updated requirements in the <em>Reconciliation Action Plan</em> criterion to remove requirement for key member of the project team to be part of the RAP working group and updated requirements related to RAP targets to be relevant to those applicable on a project level with a minimum of 10 deliverables identified.</td><td>Updates to Reconciliation Action Plan to reflect industry practice and for clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/people-3/36-or-procurement-and-workforce-inclusion.md">36 | Procurement and Workforce Inclusion</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Simplified requirements in <em>Social Procurement Strategy</em> criterion to focus on setting a strategy and removed from <em>Exceptional Performance</em>.<br><br>Updated requirements in <em>Employment Opportunities</em> criterion to focus on recognising project implementation and to include reporting requirements and calculator introduced.<br><br>Minor wording updates throughout.</td><td>For clarity and to improve ease of use.</td></tr><tr><td>Stepped points introduced for <em>Employment Opportunities</em> criterion.</td><td>Stepped points introduced to respond to industry feedback of broadening recognition of outcomes.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/people-3/37-or-design-for-equity.md">37 | Design for Equity</a></summary>

<table data-search="false"><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated credit name to Design for Equity from Design for Inclusion.</td><td>Updated credit name based on the recommendation from an Inclusive Design consultant.</td></tr><tr><td>Updated criteria in Criteria for Exceptional Performance.</td><td>Updated criteria for clarity.</td></tr><tr><td>Updated requirements in the Inclusive Design criterion to note strategies are beyond the requirements within the NCC, all wayfinding solutions are considered during design but only those deemed most appropriate are implemented and all digital products are delivered in accordance with AS EN 301 549:2020.</td><td>Updated requirements for clarity, transparency and to integrate recommendations from an Inclusive Design consultant.</td></tr><tr><td>Replaced requirement for emergency rooms with sensory rooms in the Inclusive Design criterion. </td><td>Requirement replaced to reflect industry practice. </td></tr><tr><td>Guidance included to clarify not all types of inclusive spaces are required in the building in Guidance.</td><td>Guidance added to include FAQ F-00318.</td></tr><tr><td>Updated requirements in the Needs Analysis criterion to note the focus of the needs analysis and to remove the requirement in show the results of the needs analysis align with best guidelines.</td><td>Updated requirements for clarity.</td></tr><tr><td>Guidance for tenanted buildings included in Requirements.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

</details>

## <mark style="color:$primary;">Nature</mark>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2/38-or-impacts-to-nature.md">38 | Impacts to Nature</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Added Nature Positive Pathway.</td><td>Added to align with GBCA strategy on nature.</td></tr><tr><td>Scope of credit includes typical exclusions for the <em>Managing Light Pollution</em> criterion.<br><br>Added to <em>Definitions</em>.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/wT1nebrbSOwt34FXyKCw#id-38.0.1-sensitive-sites-and-species-protection](https://greenstarresources.gbca.au/pages/wT1nebrbSOwt34FXyKCw#id-38.0.1-sensitive-sites-and-species-protection "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria name from Site Ecological Value in v1.</td><td>Updated criteria name to better reflect the outcome of criteria.</td></tr><tr><td>Updated terminology to <em>sensitive sites and sensitive species</em> when referencing environments with high ecological value. <br><br>Expanded on list of environments and added to <em>Definitions</em>. <br><br>Added definition for <em>significant impact</em> in <em>Definitions</em>.</td><td>Updated to align with GBCA strategy on nature and Green Star Communities v2.</td></tr><tr><td>Updated requirements to include an early risk assessment by the project team on whether the site contains or is adjacent to <em>sensitive sites or sensitive species</em>, requirements for an ecological assessment to be if a risk of having or impacting sensitive sites or species are identified and updated requirements to demonstrate sensitive sites and species are protected from impacts if the risk is confirmed.</td><td>Updated requirements to clarify approach to demonstrating sensitive sites and species have been protected.</td></tr><tr><td>Removed requirement to demonstrate compliance with <em>Credit Achievement</em> in the <em>Waterway Protection</em> and <em>Impacts to Nature</em> credits if the site contains or is adjacent to <em>sensitive sites or species</em>.</td><td>Removed to avoid repetition with updated requirements and to allow for a more targeted response to protecting sensitive sites and species.</td></tr><tr><td>Replaced <em>Wetland Management Plan</em> criterion from v1 with Management of impacts requirements where a site-specific Biodiversity Management Plan is required where sensitive sites and species are identified to be protected.</td><td>Replaced to ensure impacts to all sensitive sites and species are considered in a management plan, in addition to wetlands.</td></tr></tbody></table>

#### [/pages/wT1nebrbSOwt34FXyKCw#id-38.0.2-metrics-disclosure](https://greenstarresources.gbca.au/pages/wT1nebrbSOwt34FXyKCw#id-38.0.2-metrics-disclosure "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>New <em>Metrics Disclosure</em> criterion that requires disclosure of land and/or freshwater-use change as defined by the Taskforce for Nature Financial Disclosure (TNFD).</td><td>Added to align with GBCA strategy on nature.</td></tr><tr><td><strong>Rev A</strong><br>Minor formatting update to Metrics Disclosure criterion heading.</td><td>Correction to clarify the <em>Metrics Disclosure</em> requirements are a separate criteria.</td></tr></tbody></table>

#### [/pages/wT1nebrbSOwt34FXyKCw#id-38.0.3-managing-light-pollution-impacts](https://greenstarresources.gbca.au/pages/wT1nebrbSOwt34FXyKCw#id-38.0.3-managing-light-pollution-impacts "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirement to allow the calculation plane to follow AS/NZS 4282:2023 when the boundary is adjacent to a road or another industrial or commercial building.</td><td>Updated to reflect most recent version of the standard and to include FAQ F-00277.</td></tr><tr><td>References to <em>AS/NZS 4282</em> updated to align with 2023 version.<br><br>Removed requirement on control of upward light output ratio (ULOR).</td><td>Removed as ULOR is included in <em>AS/NZS 4282:2023</em>.</td></tr></tbody></table>

#### [/pages/wT1nebrbSOwt34FXyKCw#id-38.1.1-protecting-site-ecological-value](https://greenstarresources.gbca.au/pages/wT1nebrbSOwt34FXyKCw#id-38.1.1-protecting-site-ecological-value "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Simplified requirements to focus on protecting site-wide ecological value by demonstrating no net loss of biodiversity value.</td><td>Simplified for clarity.</td></tr><tr><td>Prerequisite added to requirement.</td><td>Prerequisite included to ensure project teams are performing actions that can be rewarded.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2/39-or-biodiversity-enhancement.md">39 | Biodiversity Enhancement</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Added Nature Positive Pathway. <em>Biodiversity net gain</em> pathway must be used.<br><br>Additional point available for <em>Credit Achievement</em> and <em>Exceptional Performance</em>.</td><td>Nature Positive Pathway and additional points added to align with GBCA strategy on nature.</td></tr><tr><td>Added to <em>Definitions</em>.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

#### [/pages/nDymCEjemZyrpSgK3Vyh#id-39.1.1-increased-biodiversity](https://greenstarresources.gbca.au/pages/nDymCEjemZyrpSgK3Vyh#id-39.1.1-increased-biodiversity "mention"), [/pages/nDymCEjemZyrpSgK3Vyh#id-39.1.2-biodiversity-management-plan](https://greenstarresources.gbca.au/pages/nDymCEjemZyrpSgK3Vyh#id-39.1.2-biodiversity-management-plan "mention") and [/pages/nDymCEjemZyrpSgK3Vyh#id-39.2.1-increased-biodiversity](https://greenstarresources.gbca.au/pages/nDymCEjemZyrpSgK3Vyh#id-39.2.1-increased-biodiversity "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirements to combine the <em>Landscape Area and Diversity of Species</em> criteria from v1 to be the <em>Prescriptive method</em> pathway in the <em>Increased Biodiversity</em> criterion in <em>Credit Achievement</em> and <em>Exceptional Performance</em>. <em>Biodiversity net gain</em> pathway also introduced as a second pathway in both performance levels in the <em>Increased Biodiversity</em> criterion.</td><td>Updated requirements to align with GBCA strategy on nature by introducing biodiversity net gain.</td></tr><tr><td>Stepped points introduced for <em>Biodiversity net gain</em> pathway in the <em>Increased Biodiversity</em> criteria in <em>Credit Achievement</em> and <em>Exceptional Performance</em>.</td><td>Stepped points introduced to respond to industry feedback of broadening recognition of outcomes.</td></tr><tr><td>Simplified requirements for the <em>Biodiversity Management Plan</em> criterion.</td><td>Simplified requirements for clarity.</td></tr><tr><td><strong>Rev A</strong><br>Minor wording updates to <em>Prescriptive method</em> pathway.</td><td>Minor wording updates for clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2/40-or-nature-connectivity.md">40 | Nature Connectivity</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated criteria summary in Criteria.<br><br>Added to Definitions.<br><br>Minor wording updates throughout.</td><td>For clarity.</td></tr></tbody></table>

#### [/pages/bnUveW33Lkc4OCEtNwf9#id-40.1.1-species-connectivity](https://greenstarresources.gbca.au/pages/bnUveW33Lkc4OCEtNwf9#id-40.1.1-species-connectivity "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Added requirement to complete a wildlife assessment.</td><td>Added requirement to clarify approach to demonstrating nature connectivity and determining the species to be targeting.</td></tr><tr><td>Updated guidance on building location in <em>Guidance</em>.</td><td>Updated to include FAQ F-00336 and provide guidance on the credit intent.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2/41-or-nature-stewardship.md">41 | Nature Stewardship</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>All criteria combined into one criterion however additional performance level introduced to recognise projects that restore and protect areas that are 50% of the building’s GFA or area within the project boundary.<br><br>Removed prerequisite to demonstrate compliance with the Impacts to Nature credit to be eligible for this credit.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance to project teams.<br><br>Updated to include FAQ F-00297.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/nature-2/42-or-waterway-protection.md">42 | Waterway Protection</a></summary>

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Removed <em>Exceptional Performance</em>.</td><td>Removed to allocate points to credits in the category where the building owner has greater influence over the outcome and to align with GBCA strategy on nature.</td></tr><tr><td>Updated criteria summary in <em>Criteria.</em></td><td>Updated to reflect changes to the credit.</td></tr><tr><td>Clarified scope to be all areas within the site boundary or the site boundary if there is a shared sitewide stormwater strategy.<br><br>Minor wording updates throughout.</td><td>For clarity and additional guidance to project teams.</td></tr></tbody></table>

#### [/pages/ofF9nrirlLQNXXCkHxDH#id-42.1.1-pollutant-reduction-targets](https://greenstarresources.gbca.au/pages/ofF9nrirlLQNXXCkHxDH#id-42.1.1-pollutant-reduction-targets "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated <em>Environmental Management</em> requirements for uncovered parking areas to require draining to a WSUD treatment rather than having a hydrocarbon treatment device.</td><td>Updated based on industry feedback.</td></tr></tbody></table>

#### [/pages/ofF9nrirlLQNXXCkHxDH#id-42.1.2-stormwater-volume-management](https://greenstarresources.gbca.au/pages/ofF9nrirlLQNXXCkHxDH#id-42.1.2-stormwater-volume-management "mention")

<table><thead><tr><th width="460.79998779296875">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated to require a site and water catchment assessment to be completed to determine whether stormwater volume management is relevant to the project. If relevant, two pathways are available to demonstrate stormwater reduction. Reduced benchmark for average annual stormwater discharge approach.</td><td>Updated to focus the intended beneficiary of the credit on nature.<br><br>Updates to volume reduction to provide more flexibility for targeting the credit.</td></tr><tr><td>Guidance on the intent of the credit and volume management strategies included.</td><td>For clarity and additional guidance for project teams.</td></tr></tbody></table>

</details>

## <mark style="color:$primary;">Leadership</mark>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/leadership-3/43-or-market-transformation.md">43 | Market Transformation</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Updated requirements to include scoring matrix.</td><td>Updated to include FAQ F-00374 for additional guidance.</td></tr><tr><td>Moved guidance on claims that are likely to be awarded into <em>Requirements</em>.<br><br>Minor wording updates throughout.</td><td>For clarity.</td></tr></tbody></table>

</details>

<details>

<summary><a data-mention href="https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/categories-and-credits/leadership-3/44-or-leadership-challenges.md">44 | Leadership Challenges</a></summary>

<table><thead><tr><th width="460">Summary of changes</th><th>Reasoning</th></tr></thead><tbody><tr><td>Minor wording updates throughout.</td><td>For clarity.</td></tr></tbody></table>

</details>

## <mark style="color:$primary;">Note</mark>

All updates have been done to aid project teams in meeting Green Star Buildings requirements and align with strategic outcomes.

Where a project team feels they have been negatively impacted by a change in the Maintenance Revision of Green Star Buildings v1.1 (Rev A), they should submit a Technical Question outlining how the project has been affected and provide evidence as to when they began considering Green Star Buildings for their project.

## <mark style="color:$primary;">Version control</mark>

<table><thead><tr><th width="189">Revision/release/version</th><th width="227.75">Date</th><th>Description</th></tr></thead><tbody><tr><td>1</td><td>19/12/2025</td><td>Initial release</td></tr><tr><td>2</td><td>06/05/2026</td><td>Updated to provide further clarification in Healthy category.</td></tr></tbody></table>

[^1]: 18/11/26\
    Ad-hoc: Corrected to align wording with FAQ F-00443.

[^2]: **18/11/2026:**&#x20;

    Correction: Updated to include new row of changes for this criteria


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://greenstarresources.gbca.au/greenstarresources.gbca.au_ratingtools/current-green-star-rating-tools/green-star-buildings/v1.1/buildings-v1-.1-change-log.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
